[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,22,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1149002,1,"单选题","从事市政公用工程压力管道焊接的焊工，必须持有（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","特种设备作业人员证",false,{"key":24,"text":25,"correct":22},"B","焊工证",{"key":27,"text":28,"correct":29},"C","相应的在有效期内的焊工合格证书",true,{"key":31,"text":32,"correct":22},"D","焊工合格证书","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1149003,"下列关于焊接作业执行文件说法正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"按照企业有关技术人员审批的工艺指导书执行",{"key":24,"text":41,"correct":22},"按照企业有关技术人员审批的焊接工艺评定执行",{"key":27,"text":43,"correct":22},"按照企业有关技术人员审批的焊接工艺手册执行",{"key":31,"text":45,"correct":22},"按照企业及业主审批的焊接专项施工方案执行",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1149004,"制定管道焊接工艺指导书的依据是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"公司编制的工艺文件",{"key":24,"text":53,"correct":22},"施工技术规范",{"key":27,"text":55,"correct":22},"设计文件要求",{"key":31,"text":57,"correct":29},"焊接工艺评定",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1149005,"关于定位焊缝质量控制说法错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"检查中应清除夹渣、气孔和裂纹",{"key":24,"text":65,"correct":22},"不在螺纹管纵向焊缝端部进行定位焊",{"key":27,"text":67,"correct":22},"可对称方向布置焊接，以减少应力变形",{"key":31,"text":69,"correct":29},"可在定位焊过程中边焊边调节对口位置，减少尺寸偏差",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1149007,"法兰与管道连接时，按照标准规定，下列焊接形式正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"单侧满焊",{"key":24,"text":77,"correct":29},"双侧满焊",{"key":27,"text":79,"correct":22},"内侧固定焊，外侧满焊",{"key":31,"text":81,"correct":22},"外侧固定焊，内侧满焊",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1149008,"选择阀门和设备附近的法兰时主要考虑因素有（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"系统最高工作压力",{"key":24,"text":89,"correct":29},"设备和阀门的公称压力",{"key":27,"text":91,"correct":22},"系统最高工作温度",{"key":31,"text":93,"correct":22},"设计工作温度",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1149009,"燃气、热力管道的法兰安装前必须进行外观检验，下列说法错误的是（ ）",[98,100,102,104],{"key":20,"text":99,"correct":29},"法兰表明如果有砂眼，只要不影响使用即可",{"key":24,"text":101,"correct":22},"法兰在安装前必须进行外观检查，表面应平整光洁，不得有砂眼",{"key":27,"text":103,"correct":22},"在密封面上也不应有贯穿性划痕等影响密封性的缺陷",{"key":31,"text":105,"correct":22},"在法兰侧面应有公称压力、公称直径、执行标准等标志",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1149010,"热力管道保温材料进场，应按标准规定于现场按批抽样，检测材料的（ ）是否符合标准规定。",[110,112,114,116],{"key":20,"text":111,"correct":22},"密度",{"key":24,"text":113,"correct":29},"导热系数",{"key":27,"text":115,"correct":22},"透气性",{"key":31,"text":117,"correct":22},"表面特性",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1149011,"关于施工现场对热熔连接焊接接头质量进行检验，下列说法正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"100％翻边对称性检验和不少于30％的翻边切除对正性检验",{"key":24,"text":125,"correct":22},"30％翻边对称性检验和不少于10％的翻边切除对正性检验",{"key":27,"text":127,"correct":22},"30％翻边对称性检验和不少于30％的翻边切除的对正性检验",{"key":31,"text":129,"correct":29},"100％的翻边对称性检验和不少于10％的翻边切除的对正性检验",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1149012,"当使用聚乙烯PE管进行热熔施工前应对（ ），在判定连接质量能够得到保证后，方可进行施工",[134,136,138,140],{"key":20,"text":135,"correct":22},"管材环刚度",{"key":24,"text":137,"correct":22},"管材拉伸强度",{"key":27,"text":139,"correct":29},"热熔连接参数试验",{"key":31,"text":141,"correct":22},"不应有开裂、裂缝，接缝处不得露出熔合线",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1149013,"影响管道防腐层的附着质量和防腐效果的因素有（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"防腐材料性质",{"key":24,"text":149,"correct":29},"基层除锈处理质量",{"key":27,"text":151,"correct":22},"施工现场气温环境",{"key":31,"text":153,"correct":22},"涂刷施工工艺",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1149014,"管道保温必须按设计规定的位置、大小和数量设置（ ），并填充（ ）相近的软质材料。",[158,160,162,164],{"key":20,"text":159,"correct":22},"伸缩缝；密度",{"key":24,"text":161,"correct":29},"伸缩缝；导热系数",{"key":27,"text":163,"correct":22},"排液缝；密度",{"key":31,"text":165,"correct":22},"排液缝；导热系数",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1149015,"防潮层采用金属保护层的环缝和纵缝应（ ）或咬口，缝口应朝（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"焊接；侧面",{"key":24,"text":173,"correct":29},"搭接；下",{"key":27,"text":175,"correct":22},"搭接；侧面",{"key":31,"text":177,"correct":22},"焊接；下",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1149016,"铺设方式为（ ）须绝热的管道应设有防潮层。",[182,184,186,188],{"key":20,"text":183,"correct":29},"管沟内",{"key":24,"text":185,"correct":22},"架空铺设",{"key":27,"text":187,"correct":22},"沿墙铺设",{"key":31,"text":189,"correct":22},"套管内",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1149017,"设在管沟内，须绝热的热力管道应设有（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"保温层",{"key":24,"text":197,"correct":22},"隔热层",{"key":27,"text":199,"correct":29},"防潮层",{"key":31,"text":201,"correct":22},"保护层",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1149018,"防潮层采用缠绕式保护层的重叠部分应为其带宽的（ ），缠绕时应裹紧，不得有松脱、翻边、皱褶和鼓包，起点和终点必须用（ ）捆扎牢固，并应密封。",[206,208,210,212],{"key":20,"text":207,"correct":22},"1\u002F3；箍带",{"key":24,"text":209,"correct":22},"1\u002F2;箍带",{"key":27,"text":211,"correct":29},"1\u002F2;镀锌钢丝",{"key":31,"text":213,"correct":22},"1\u002F3;镀锌钢丝",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1149019,"有报警线的预制保温管，安装（ ）应测试报警线的通断状况和电阻值，并做好记录。",[218,220,222,224],{"key":20,"text":219,"correct":22},"后",{"key":24,"text":221,"correct":29},"前",{"key":27,"text":223,"correct":22},"中",{"key":31,"text":225,"correct":22},"A＋B＋C",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1149020,"非水平热力管道的绝热施工应（ ）进行，防潮层和保护层的搭接应（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"自下而上；下压上",{"key":24,"text":233,"correct":22},"自上而下；下压上",{"key":27,"text":235,"correct":22},"自上而下；上压下",{"key":31,"text":237,"correct":29},"自下而上；上压下",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1149021,"焊缝外观质量检查当无明确规定时，应按（ ）标准的规定进行。",[242,244,246,248],{"key":20,"text":243,"correct":29},"GB 50236-2011",{"key":24,"text":245,"correct":22},"CJJ 28-2004",{"key":27,"text":247,"correct":22},"CJJ 34-2010",{"key":31,"text":249,"correct":22},"GB 50235-2010",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1149022,"热力管道保温施工时，同层的预制管壳应（ ），内、外层应（ ），外层的水平接缝应在（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":29},"错缝；压缝；侧面",{"key":24,"text":257,"correct":22},"错缝；齐缝；底面",{"key":27,"text":259,"correct":22},"压缝；错缝；侧面",{"key":31,"text":261,"correct":22},"压缝；齐缝；底面",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1149023,"对检验不合格的焊缝必须返修至合格，返修次数不得大于（ ）次。",[266,268,270,272],{"key":20,"text":267,"correct":22},"1",{"key":24,"text":269,"correct":29},"2",{"key":27,"text":271,"correct":22},"3",{"key":31,"text":273,"correct":22},"4",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1149024,"以下关于防腐保温工程质量检验的内容叙述不正确的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":29},"回填完成后，对于重点部位管道防腐层完整性进行检测",{"key":24,"text":281,"correct":22},"全线检查防腐层的电绝缘性",{"key":27,"text":283,"correct":22},"对于阳极保护质量保证文件，重点检查阳极化学成分是否符合标准要求",{"key":31,"text":285,"correct":22},"采用成型制品和缠绕品的，缝隙尺寸应符合规范要求，并应将接缝错开，嵌缝要饱满",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1149025,"管内径大于（ ）mm的柔性管道，回填施工中应在管内设竖向支撑。",[290,292,294,296],{"key":20,"text":291,"correct":22},"600",{"key":24,"text":293,"correct":22},"700",{"key":27,"text":295,"correct":29},"800",{"key":31,"text":297,"correct":22},"900",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},1149026,"管道开槽施工，土方回填时间选在一昼夜中气温（ ）的时刻，从管两侧同时回填，同时夯实。",[302,304,306,308],{"key":20,"text":303,"correct":22},"适宜",{"key":24,"text":305,"correct":22},"最高",{"key":27,"text":307,"correct":29},"最低",{"key":31,"text":309,"correct":22},"温暖",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},1149027,"关于柔性管道回填，下列说法错误的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"柔性管道的沟槽回填质量控制是管道工程施工质量控制的关键",{"key":24,"text":317,"correct":22},"现场试验段主要用以确定压实机械和施工参数",{"key":27,"text":319,"correct":29},"在设计的管基有效支承角范围必须用中、粗砂、黏土填充密实，与管壁紧密接触",{"key":31,"text":321,"correct":22},"回填作业每层的压实遍数，按压实度要求、压实工具、虚铺厚度和含水量，经现场试验确定",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1149028,"砌筑砂浆应采用水泥砂浆，其强度等级应符合设计要求，且不应低于（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"M15",{"key":24,"text":329,"correct":29},"M10",{"key":27,"text":331,"correct":22},"M12",{"key":31,"text":333,"correct":22},"M20",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},1149029,"用于砌筑结构的石材强度等级应符合设计要求，设计无要求时不得小于（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":29},"40MPa",{"key":24,"text":341,"correct":22},"20MPa",{"key":27,"text":343,"correct":22},"15MPa",{"key":31,"text":345,"correct":22},"25MPa",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},1149030,"关于安全检查评价，下列说法错误的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"对安全检查中发现的问题和隐患要定人、定时间、定措施组织改正",{"key":24,"text":353,"correct":22},"对安全检查中发现的问题要及时制定整改措施",{"key":27,"text":355,"correct":29},"对检查的问题可要求项目进行信息反馈，确定效果，可不必复查",{"key":31,"text":357,"correct":22},"安全检查后，要进行安全评价，具体分析项目未达标和存在的问题，填写安全检查评分表，事故隐患通知书、违章处罚通知书或停工通知等",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},1149031,"关于安全检查表（SCL）说法错误的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"使用SCL表可有效发现和查明各种危险和隐患",{"key":24,"text":365,"correct":22},"使用SCL表可监督规章制度的执行情况",{"key":27,"text":367,"correct":22},"填写SCL表需要填写检查时间、检查人和直接负责人",{"key":31,"text":369,"correct":29},"检查结果受人为影响较大，对检查者要求较高",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},1149032,"实行施工总承包的由（ ）统一组织编制建设工程生产安全事故应急预案。",[374,376,378,380],{"key":20,"text":375,"correct":22},"建设单位",{"key":24,"text":377,"correct":22},"分包单位",{"key":27,"text":379,"correct":29},"总承包单位",{"key":31,"text":381,"correct":22},"劳务分包单位",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},1149033,"施工现场根据危险部位的性质不同，需要分别设置禁止标志、警告标志、指令标志、（ ）等安全标志，夜间留设红灯示警。应根据工程部位和现场设施的变化，及时调整安全标志牌设置。",[386,388,390,392],{"key":20,"text":387,"correct":22},"提示标志",{"key":24,"text":389,"correct":22},"警示标志",{"key":27,"text":391,"correct":22},"引导标志",{"key":31,"text":393,"correct":29},"指示标志",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},1149034,"工程项目要严格设备进场验收工作。塔式或门式起重机、电动吊篮、垂直提升架等重点设备应由（ ）进行验收，检查相应的技术文件，并建立机械设备档案。",[398,400,402,404],{"key":20,"text":399,"correct":22},"施工员会同专业技术管理人员和使用人员",{"key":24,"text":401,"correct":22},"项目技术安全负责人",{"key":27,"text":403,"correct":29},"具有相关资质的第三方单位",{"key":31,"text":405,"correct":22},"企业技术管理部门",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1149035,"下列措施中属于施工安全保证计划中技术措施的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"配置符合安全施工和职业健康要求的机械设备",{"key":24,"text":413,"correct":29},"制定危险性较大分部分项工程施工专项方案",{"key":27,"text":415,"correct":22},"监督指导项目操作规程的落实",{"key":31,"text":417,"correct":22},"对安全隐患限时整改并制定消除安全隐患措施",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},1149036,"在安全生产责任制中，关于施工员职责说法错误的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"是所管辖区域范围内安全生产第一责任人，对辖区的安全生产负直接领导责任",{"key":24,"text":425,"correct":22},"向班组进行书面安全技术交底，检查执行情况",{"key":27,"text":427,"correct":22},"检查辖区内作业环境、设备防护及特殊部位安全状况",{"key":31,"text":429,"correct":29},"负责辖区内安全生产工作的监督管理",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1149037,"从事特种作业的人员必须经过专门的安全技术培训，经考试合格后取得（ ）后方准独立作业。",[434,436,438,440],{"key":20,"text":435,"correct":22},"安全生产资质证书",{"key":24,"text":437,"correct":29},"操作证",{"key":27,"text":439,"correct":22},"上岗证",{"key":31,"text":441,"correct":22},"培训考试合格证",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},1149038,"特殊工种（包括电工、焊工、架子工、司炉工、爆破工、机械操作工、起重工、塔吊司机及指挥人员、人货两用电梯司机等）在通过（ ）培训并取得岗位操作证后可上岗作业。",[446,448,450,452],{"key":20,"text":447,"correct":22},"企业",{"key":24,"text":449,"correct":22},"安全技术",{"key":27,"text":451,"correct":29},"专业技术",{"key":31,"text":453,"correct":22},"项目部",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1149039,"（ ）是项目安全管理工作的重要环节，是提高全员安全素质、安全管理水平和防止事故，从而实现安全生产的重要手段。",[458,460,462,464],{"key":20,"text":459,"correct":22},"风险辨识和评价",{"key":24,"text":461,"correct":29},"安全教育",{"key":27,"text":463,"correct":22},"施工组织和策划",{"key":31,"text":465,"correct":22},"安全防护措施",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1149040,"企业建立（ ）是安全生产的重要保证。",[470,472,474,476],{"key":20,"text":471,"correct":29},"安全生产责任制",{"key":24,"text":473,"correct":22},"项目组织机构",{"key":27,"text":475,"correct":22},"安全保证体系",{"key":31,"text":477,"correct":22},"项目安全管理制度",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1149041,"项目专职安全生产管理人员具有以下主要职责：负责施工现场安全生产日检查并做好检查记录；现场监督危险性较大工程安全专项施工方案实施情况；对作业人员违规违章行为有权予以纠正或查处；对施工现场存在的安全隐患有权责令立即整改；（ ）；依法报告生产安全事故情况。",[482,484,486,488],{"key":20,"text":483,"correct":22},"对于发现的重大安全隐患，责令立即现场整改",{"key":24,"text":485,"correct":29},"对于发现的重大安全隐患，有权向企业安全生产管理机构报告",{"key":27,"text":487,"correct":22},"对于发现的重大安全隐患，不得向企业安全生产管理机构报告",{"key":31,"text":489,"correct":22},"对于发现的重大安全隐患，责令立即停工",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},1149042,"下列措施中，不属于政府保证人员素质管理措施的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":29},"人员强制和意外保险",{"key":24,"text":497,"correct":22},"企业资质管理",{"key":27,"text":499,"correct":22},"安全生产许可证管理",{"key":31,"text":501,"correct":22},"各类专业人员持证上岗制度",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},1149043,"在各类危险源中，物的障碍或缺陷（包括生产、控制、安全装置和辅助设施等），是指系统、设备、装置、元件等由于（ ）而不能实现预定功能（包括安全功能）的现象。",[506,508,510,512],{"key":20,"text":507,"correct":22},"操作不当",{"key":24,"text":509,"correct":29},"性能低下",{"key":27,"text":511,"correct":22},"保养维修不当",{"key":31,"text":513,"correct":22},"作业环境变化",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1149044,"下列检查中，不属于项目专项检查的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"冬季沟槽开挖检查",{"key":24,"text":521,"correct":22},"施工用电检查",{"key":27,"text":523,"correct":29},"冬季防冻、防火检查",{"key":31,"text":525,"correct":22},"高大脚手架支搭验收检查",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1149045,"对于基坑开挖范围内的管线，与建设单位、规划单位和管理单位协商后,不可采取（ ）措施。",[530,532,534,536],{"key":20,"text":531,"correct":22},"拆迁",{"key":24,"text":533,"correct":22},"改移",{"key":27,"text":535,"correct":22},"悬吊",{"key":31,"text":537,"correct":29},"清除",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1149046,"基坑开挖过程中，防止损伤地下管线的安全措施中不正确的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"进场后应及时掌握管线的实际情况",{"key":24,"text":545,"correct":29},"施工时，发现资料与实际不符，施工单位可自行处理",{"key":27,"text":547,"correct":22},"加强对现况管线测量",{"key":31,"text":549,"correct":22},"在现场对管线做出醒目标志",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},1149047,"基坑开挖过程中的最主要风险是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"过高的造价",{"key":24,"text":557,"correct":22},"过量的土石方量",{"key":27,"text":559,"correct":22},"过大的变形",{"key":31,"text":561,"correct":29},"坍塌和淹没",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1149048,"地下水是引起基坑事故的主要因素之一，当基坑处于（ ）地层条件时，基坑容易出现流土、流沙，引起基坑坍塌。",[566,568,570,572],{"key":20,"text":567,"correct":22},"黏性土",{"key":24,"text":569,"correct":29},"砂土或粉土",{"key":27,"text":571,"correct":22},"弱风化岩层",{"key":31,"text":573,"correct":22},"卵砾石层",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},1149049,"桥梁拆除施工中，进行基础或局部块体拆除时，宜采用（ ）的方法。",[578,580,582,584],{"key":20,"text":579,"correct":22},"人工破碎",{"key":24,"text":581,"correct":22},"机械破碎",{"key":27,"text":583,"correct":29},"静力破碎",{"key":31,"text":585,"correct":22},"爆破拆除",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},1149050,"拆除工程开工前，应根据工程特点、构造情况、工程量等编制施工组织设计或安全专项施工方案，爆破拆除和被拆除桥梁面积大于1000㎡的拆除工程，应编制（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":29},"安全施工组织设计",{"key":24,"text":593,"correct":22},"安全施工方案",{"key":27,"text":595,"correct":22},"安全专项施工方案",{"key":31,"text":597,"correct":22},"安全专项施工技术措施",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":24,"analysis":33},1149051,"从事爆破拆除工程的施工单位，必须持有工程所在地法定部门核发的（ ），承担相应等级的爆破拆除工程。",[602,604,606,608],{"key":20,"text":603,"correct":22},"《安全生产许可证》",{"key":24,"text":605,"correct":29},"《爆炸物品使用许可证》",{"key":27,"text":607,"correct":22},"《爆炸物品购买许可证》",{"key":31,"text":609,"correct":22},"《爆炸物品运输许可证》",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":31,"analysis":33},1149052,"爆破拆除工程应进行（ ）并经当地有关部门审核批准后方可实施。",[614,616,618,620],{"key":20,"text":615,"correct":22},"安全技术方案制定",{"key":24,"text":617,"correct":22},"方案的专家论证",{"key":27,"text":619,"correct":22},"地下管线保护",{"key":31,"text":621,"correct":29},"安全评估",[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]