[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,21,50,2019,[13,34,46,58,70,82,92,104,116,128,140,152,164,176,188,200,212,224,236,247,259,271,283,295,306,318,330,342,354,366,378,390,402,414,426,438,450,460,472,484,493,505,517,529,538,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1148952,1,"单选题","用于水泥稳定土基层的土宜选用（ ）土。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","粗粒或中粒",true,{"key":24,"text":25,"correct":26},"B","细粒",false,{"key":28,"text":29,"correct":26},"C","黏性",{"key":31,"text":32,"correct":26},"D","粉质","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1148953,"在拌制石灰稳定土时，宜用1～3级的新石灰，其技术指标应符合规范要求，（ ）可不经消解直接使用，块灰应在使用前完成消解。",[38,40,42,44],{"key":20,"text":39,"correct":26},"普通生石灰",{"key":24,"text":41,"correct":22},"磨细生石灰",{"key":28,"text":43,"correct":26},"块状生石灰",{"key":31,"text":45,"correct":26},"粒状生石灰",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1148954,"城镇道路石灰稳定土基层施工时，对石灰要求错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"宜采用1～3级的新石灰",{"key":24,"text":53,"correct":26},"可直接使用磨细生石灰",{"key":28,"text":55,"correct":26},"块灰应在使用前2～3d完成消解",{"key":31,"text":57,"correct":22},"消解石灰粒径不得大于20mm",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1148955,"水泥稳定土类材料自拌合至摊铺完成，不得超过（ ）。分层摊铺时，应在下层养护（ ）后，方可摊铺上层材料。",[62,64,66,68],{"key":20,"text":63,"correct":26},"2h;5d",{"key":24,"text":65,"correct":26},"2h;7d",{"key":28,"text":67,"correct":26},"3h;5d",{"key":31,"text":69,"correct":22},"3h;7d",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1148956,"沥青混合料面层主控项目包括原材料、混合料、压实度、面层厚度、（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"弯沉值",{"key":24,"text":77,"correct":26},"宽度",{"key":28,"text":79,"correct":26},"平整度",{"key":31,"text":81,"correct":26},"中线高程",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1148957,"下列主控项目中，能够直接反映项目和企业技术质量管理水平的是（ ）。",[86,88,90,91],{"key":20,"text":87,"correct":26},"压实度",{"key":24,"text":89,"correct":22},"面层厚度",{"key":28,"text":75,"correct":26},{"key":31,"text":79,"correct":26},{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1148958,"当水泥贮存期超过（ ）或受潮，应进行性能试验，合格后方可使用。",[96,98,100,102],{"key":20,"text":97,"correct":26},"2个月",{"key":24,"text":99,"correct":22},"3个月",{"key":28,"text":101,"correct":26},"4个月",{"key":31,"text":103,"correct":26},"半年",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":28,"analysis":33},1148959,"水泥混凝土路面工程中，在拌制混凝土混合料时，宜采用质地坚硬，细度模数在2.5以上，符合级配规定的洁净（ ）砂。",[108,110,112,114],{"key":20,"text":109,"correct":26},"细",{"key":24,"text":111,"correct":26},"粉细",{"key":28,"text":113,"correct":22},"粗或中",{"key":31,"text":115,"correct":26},"粒径无要求",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1148960,"雨期施工时，要建立完善的（ ），防排结合。",[120,122,124,126],{"key":20,"text":121,"correct":26},"防水系统",{"key":24,"text":123,"correct":22},"排水系统",{"key":28,"text":125,"correct":26},"挡水系统",{"key":31,"text":127,"correct":26},"防排系统",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},1148961,"水泥稳定土（粒料）类基层进入冬期时，应在基层施工时向基层材料中掺入（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":26},"缓凝剂",{"key":24,"text":135,"correct":26},"速凝剂",{"key":28,"text":137,"correct":22},"防冻剂",{"key":31,"text":139,"correct":26},"温热水",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":28,"analysis":33},1148962,"沥青混合料面层不得在雨、雪天气及环境最高温度低于（ ）时施工。",[144,146,148,150],{"key":20,"text":145,"correct":26},"-5℃",{"key":24,"text":147,"correct":26},"8℃",{"key":28,"text":149,"correct":22},"5℃",{"key":31,"text":151,"correct":26},"10℃",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},1148963,"（ ）施工时，严控混凝土的配合比，保证其和易性，必要时可适当掺加缓凝剂。",[156,158,160,162],{"key":20,"text":157,"correct":26},"冬季",{"key":24,"text":159,"correct":26},"雨季",{"key":28,"text":161,"correct":26},"春季",{"key":31,"text":163,"correct":22},"夏季",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1148964,"（ ）适用于土路基压实度检测；不宜用于填石路堤等大空隙材料的压实检测。在路面工程中也适用于基层、砂石路面、沥青路面表面处置及沥青贯入式路面的压实度检测",[168,170,172,174],{"key":20,"text":169,"correct":26},"环刀法",{"key":24,"text":171,"correct":22},"灌砂法",{"key":28,"text":173,"correct":26},"比重法",{"key":31,"text":175,"correct":26},"灌入法",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},1148965,"为避免孔口高程误差造成钻孔灌注桩质量事故，应采取的对策是认真校核原始水准点和各孔口的绝对高程，每根桩钻孔前（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":26},"实行签证手续",{"key":24,"text":183,"correct":26},"平整施工场地",{"key":28,"text":185,"correct":22},"复测孔口高程",{"key":31,"text":187,"correct":26},"控制混凝土超灌高度",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1148966,"下列情形中，会造成钻孔偏斜的是( )。",[192,194,196,198],{"key":20,"text":193,"correct":26},"钻头受力不均",{"key":24,"text":195,"correct":22},"钻杆接头间隙太大",{"key":28,"text":197,"correct":26},"钻头翼板磨损不一",{"key":31,"text":199,"correct":26},"钻压过高使钻头受力不均",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},1148967,"钻孔灌注桩施工中灌注首批水下混凝土时，导管埋深应不小于（ ）m。",[204,206,208,210],{"key":20,"text":205,"correct":26},"0.5",{"key":24,"text":207,"correct":26},"0.8",{"key":28,"text":209,"correct":22},"1.0",{"key":31,"text":211,"correct":26},"1.2",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1148968,"钻孔灌注桩施工中单桩混凝土灌注时间说法正确的宜控制在（ ）内。",[216,218,220,222],{"key":20,"text":217,"correct":26},"1.2倍混凝土初凝时间",{"key":24,"text":219,"correct":22},"1.5倍混凝土初凝时间",{"key":28,"text":221,"correct":26},"1.2倍混凝土终凝时间",{"key":31,"text":223,"correct":26},"1.5倍混凝土终凝时间",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},1148969,"大体积水泥混凝土浇筑施工容易产生裂缝，以下选项中不属于裂缝产生主要原因的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":26},"混凝土的收缩变形",{"key":24,"text":231,"correct":26},"内外约束条件的影响",{"key":28,"text":233,"correct":22},"水泥用量大",{"key":31,"text":235,"correct":26},"水化热引起的温度变形",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1148970,"混凝土拆模时，混凝土的表面温度与中心温度之间、表面温度与外界气温之间的温差不超过（ ）。",[240,241,243,245],{"key":20,"text":151,"correct":26},{"key":24,"text":242,"correct":22},"20℃",{"key":28,"text":244,"correct":26},"25℃",{"key":31,"text":246,"correct":26},"30℃",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},1148971,"大体积混凝土的养护，不仅要满足强度增长的需要，还应通过（ ）控制，防止因温度变形引起混凝土开裂。",[251,253,255,257],{"key":20,"text":252,"correct":22},"温度",{"key":24,"text":254,"correct":26},"强度",{"key":28,"text":256,"correct":26},"适度",{"key":31,"text":258,"correct":26},"密实度",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1148972,"张拉机具设备使用期间的校验期限应视机具设备的情况确定，当千斤顶使用超过（ ）个月后应重新校验。",[263,265,267,269],{"key":20,"text":264,"correct":26},"3",{"key":24,"text":266,"correct":26},"4",{"key":28,"text":268,"correct":26},"5",{"key":31,"text":270,"correct":22},"6",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1148973,"预应力钢筋张拉应由（ ）主持。",[275,277,279,281],{"key":20,"text":276,"correct":26},"操作班长",{"key":24,"text":278,"correct":26},"施工员",{"key":28,"text":280,"correct":26},"技术员",{"key":31,"text":282,"correct":22},"技术负责人",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},1148974,"张拉控制应力达到（ ）后方可锚固，锚固后预应力筋的外露长度不宜小于30mm。",[287,289,291,293],{"key":20,"text":288,"correct":26},"监理要求",{"key":24,"text":290,"correct":22},"稳定",{"key":28,"text":292,"correct":26},"设计要求",{"key":31,"text":294,"correct":26},"规定",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},1148975,"预应力筋张拉前应根据设计要求对孔道的（ ）进行实测，以便确定张拉控制应力，并确定预应力筋的理论伸长值。",[299,301,303,304],{"key":20,"text":300,"correct":22},"摩阻损失",{"key":24,"text":302,"correct":26},"直径",{"key":28,"text":254,"correct":26},{"key":31,"text":305,"correct":26},"长度",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},1148976,"钢管混凝土施工质量检测方法为（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"超声波法",{"key":24,"text":313,"correct":26},"钻芯法",{"key":28,"text":315,"correct":26},"红外线法",{"key":31,"text":317,"correct":26},"回弹法",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},1148977,"钢管混凝土拱应采用（ ）施工，由拱脚向拱顶对称均衡地连续压注一次完成。",[322,324,326,328],{"key":20,"text":323,"correct":26},"泵送降压法",{"key":24,"text":325,"correct":22},"泵送顶升压注法",{"key":28,"text":327,"correct":26},"泵车浇筑法",{"key":31,"text":329,"correct":26},"千斤顶压法",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},1148978,"关于基坑开挖说法，以下说法错误的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":26},"基底经勘察，设计，监理，施工单位验收合格后，应及时施工混凝土垫层",{"key":24,"text":337,"correct":26},"开挖至邻近基底200mm时，应配合人工清底，不得超挖或扰动基底土",{"key":28,"text":339,"correct":26},"钢筋网片安装及喷射混凝土紧跟开挖流水段，及时施工支撑或锚杆",{"key":31,"text":341,"correct":22},"土方必须自下而上分层、分段依次开挖",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},1148979,"地铁车站基坑回填可以采用（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":26},"淤泥",{"key":24,"text":349,"correct":26},"杂土",{"key":28,"text":351,"correct":26},"粉砂",{"key":31,"text":353,"correct":22},"中砂",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1148980,"对关键部位、特殊工艺和（ ）专项工程分别编制专项施工方案和质量保证措施。",[358,360,362,364],{"key":20,"text":359,"correct":26},"暗挖工程",{"key":24,"text":361,"correct":22},"危险性较大",{"key":28,"text":363,"correct":26},"大模板工程",{"key":31,"text":365,"correct":26},"吊装过程",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1148981,"工作井施工方案，包括马头门细部结构和（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":26},"土方开挖",{"key":24,"text":373,"correct":22},"超前加固措施",{"key":28,"text":375,"correct":26},"衬砌结构",{"key":31,"text":377,"correct":26},"防水措施",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1148982,"喷射混凝土施工时，喷射作业分段、分层进行，喷射顺序为（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":26},"由上而下",{"key":24,"text":385,"correct":26},"由右而左",{"key":28,"text":387,"correct":26},"由左而右",{"key":31,"text":389,"correct":22},"由下而上",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1148983,"二次衬砌施工质量控制中，混凝土浇筑应（ ）浇筑，各部位应对称浇筑振捣密实，且振捣器不得触及防水层。",[394,396,398,400],{"key":20,"text":395,"correct":22},"从下向上",{"key":24,"text":397,"correct":26},"从上向下",{"key":28,"text":399,"correct":26},"从左向右",{"key":31,"text":401,"correct":26},"从右向左",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},1148984,"根据实际情况采取地面预注浆、隧道内小导管注浆和衬砌结构背后注浆等措施，控制（ ）在允许范围。",[406,408,410,412],{"key":20,"text":407,"correct":22},"地层变形",{"key":24,"text":409,"correct":26},"拱顶变形",{"key":28,"text":411,"correct":26},"收敛变形",{"key":31,"text":413,"correct":26},"地面变形",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1148985,"在（ ）管片拼装时，应根据特殊管片的设计位置，预先调整好盾构姿态和盾尾间隙，管片拼装符合设计要求。",[418,420,422,424],{"key":20,"text":419,"correct":26},"曲线段",{"key":24,"text":421,"correct":22},"特殊位置",{"key":28,"text":423,"correct":26},"直线段",{"key":31,"text":425,"correct":26},"特殊地层",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1148986,"管片贮存可采用内弧面向上或单片侧立的方式码放，每层管片之间正确设置（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"垫木",{"key":24,"text":433,"correct":26},"型钢",{"key":28,"text":435,"correct":26},"垫块",{"key":31,"text":437,"correct":26},"垫圈",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1148987,"管片拼装螺栓质量及拧紧度必须符合（ ）要求。",[442,444,446,448],{"key":20,"text":443,"correct":22},"设计",{"key":24,"text":445,"correct":26},"特殊",{"key":28,"text":447,"correct":26},"监理",{"key":31,"text":449,"correct":26},"甲方",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1148988,"为将混凝土构筑物裂缝对给水排水构筑物的危害程度控制在允许范围内，应从施工和（ ）两方面采取措施。",[454,455,457,458],{"key":20,"text":443,"correct":22},{"key":24,"text":456,"correct":26},"勘察",{"key":28,"text":447,"correct":26},{"key":31,"text":459,"correct":26},"监督",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},1148989,"在下列采取的混凝土防裂缝技术措施中，不属于设计措施的是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":26},"控制结构断面配筋率，增加构造配筋，提高结构抗裂性能",{"key":24,"text":467,"correct":26},"保持结构断面尺寸均匀，结构变化部位采用过渡形式，减少结构应力集中现象",{"key":28,"text":469,"correct":26},"设置变形缝，控制裂缝的产生",{"key":31,"text":471,"correct":22},"进行混凝土配合比设计，提高混凝土早期抗裂性能",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},1148990,"给水排水构筑物施工时，应按（ ）的顺序施工，并应防止各构筑物交叉施工时相互干扰。",[476,478,480,482],{"key":20,"text":477,"correct":26},"先地上后地下、先深后浅",{"key":24,"text":479,"correct":26},"先地下后地上、先浅后深",{"key":28,"text":481,"correct":22},"先地下后地上、先深后浅",{"key":31,"text":483,"correct":26},"先地上后地下、先浅后深",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1148991,"排水构筑物施工时，为避免混凝土结构内外温差过大，混凝土的入模温度不应大于（ ）。",[488,489,490,492],{"key":20,"text":244,"correct":22},{"key":24,"text":246,"correct":26},{"key":28,"text":491,"correct":26},"32℃",{"key":31,"text":242,"correct":26},{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":28,"analysis":33},1148992,"关于构筑物混凝土的施工，以下说法错误的是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":26},"砂和碎石要连续级配，含泥量不能超过规范要求",{"key":24,"text":500,"correct":26},"对于大型给排水混凝土构筑物，合理设置后浇带有利于控制施工期间的较大温差与收缩应力，减少裂缝",{"key":28,"text":502,"correct":22},"在满足混凝土运输和布放要求前提下，要尽可能增大入模坍落度",{"key":31,"text":504,"correct":26},"对于地下工程，拆模后及时回填土控制早期、中期开裂",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},1148993,"原水通过滤池时，（ ）将水中悬浮物粘附截留。",[509,511,513,515],{"key":20,"text":510,"correct":22},"滤料",{"key":24,"text":512,"correct":26},"滤头",{"key":28,"text":514,"correct":26},"滤板",{"key":31,"text":516,"correct":26},"滤管",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":31,"analysis":33},1148994,"给水处理厂滤池中的滤头安装完毕后，须进行（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":26},"满水试验",{"key":24,"text":524,"correct":26},"闭水试验",{"key":28,"text":526,"correct":26},"压力试验",{"key":31,"text":528,"correct":22},"通气试验",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":28,"analysis":33},1148995,"给水处理厂滤池中的滤料铺装完毕后，须进行（ ）。",[533,534,535,537],{"key":20,"text":522,"correct":26},{"key":24,"text":524,"correct":26},{"key":28,"text":536,"correct":22},"反冲洗试验",{"key":31,"text":528,"correct":26},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1148996,"按《给水排水管道工程施工与验收规范》GB50268的规定，无压管道的功能性试验是（ ）。",[542,544,545,547],{"key":20,"text":543,"correct":26},"水压试验",{"key":24,"text":524,"correct":26},{"key":28,"text":546,"correct":26},"闭气试验",{"key":31,"text":548,"correct":22},"严密性试验",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},1148997,"按照《工业金属管道工程施工规范》GB50235-2010，等厚管道安装时，关于对口允许的最大错边量，下列说法正确的是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":26},"不超过壁厚的10％，且不大于3mm",{"key":24,"text":556,"correct":22},"不超过壁厚的10％，且不大于2mm",{"key":28,"text":558,"correct":26},"不超过壁厚的15％，且不大于3mm",{"key":31,"text":560,"correct":26},"不超过壁厚的15％，且不大于2mm",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":28,"analysis":33},1148998,"管道组成件的安装质量直接影响系统使用功能、运行安全，下列工序中不属于管道安装关键工序的是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":26},"下管",{"key":24,"text":568,"correct":26},"组对",{"key":28,"text":570,"correct":22},"试压",{"key":31,"text":572,"correct":26},"连接",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},1148999,"管道安装必须按一定的原则、施工计划、分步骤有序进行。下列关于管道安装基本原则说法错误的是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":26},"先大管、后小管",{"key":24,"text":580,"correct":26},"先主管、后支管",{"key":28,"text":582,"correct":26},"先下部管、后中上部管",{"key":31,"text":584,"correct":22},"先高压管、后低压管",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},1149000,"燃气、热力管道敷设时针对实际环境采取相应的防护措施，保证焊接过程不受或少受外界环境影响。当存在（ ）且未采取有效的防护措施时，严禁进行焊接作业。",[589,591,593,595],{"key":20,"text":590,"correct":26},"未经预热",{"key":24,"text":592,"correct":22},"雨、雪环境",{"key":28,"text":594,"correct":26},"高温",{"key":31,"text":596,"correct":26},"湿度大",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":33},1149001,"下列关于焊接施工说法正确的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":26},"焊接工艺参数仅经过破坏性试验得出的一组数据，其组合能够满足焊接接头各项性能指标的技术要求",{"key":24,"text":604,"correct":26},"在焊接过程中，根据施工经验适当改变、调整焊接条件",{"key":28,"text":606,"correct":26},"在焊接过程中，焊接顺序和方向必须符合焊接工艺评定要求，以保证焊接质量",{"key":31,"text":608,"correct":22},"除工艺的特殊要求，一般每道焊缝均应一次连续焊完，相邻两焊缝起点位置应错开",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]