[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,20,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,163,175,183,195,207,219,231,243,255,267,279,291,303,315,327,339,351,363,371,383,395,407,419,430,442,454,466,478,490,502,513,525,537,547,559,567,579,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1148902,1,"单选题","（ ）可以根据实际情况和管理需要，以一个单位工程或合并若干单位工程为成本核算对象",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","基坑工程",false,{"key":24,"text":25,"correct":22},"B","立交桥工程",{"key":27,"text":28,"correct":29},"C","桩基工程",true,{"key":31,"text":32,"correct":22},"D","隧道工程","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1148903,"施工成本分析的内容，不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"工期成本分析",{"key":24,"text":41,"correct":29},"业务招待分析",{"key":27,"text":43,"correct":22},"资金成本分析",{"key":31,"text":45,"correct":22},"施工索赔分析",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1148904,"在进行分析时，首先假定众多因素中的一个因素发生了变化，而其他因素则不变，然后逐个替换，并分别比较其计算结果，以确定各个因素变化对成本的影响程度，该种方法为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"比较法",{"key":24,"text":53,"correct":29},"因素分析法",{"key":27,"text":55,"correct":22},"比率法",{"key":31,"text":57,"correct":22},"差额计算法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1148905,"市政公用工程项目的施工组织设计是市政公用工程施工项目管理的重要内容，应在（ ）编制完成。",[62,64,66,68],{"key":20,"text":63,"correct":22},"进场前",{"key":24,"text":65,"correct":29},"施工前",{"key":27,"text":67,"correct":22},"开挖前",{"key":31,"text":69,"correct":22},"放样前",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1148906,"对于工程的特殊部位或分项工程、分包工程的施工质量，应制定相应的（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"技术措施",{"key":24,"text":77,"correct":29},"监控措施",{"key":27,"text":79,"correct":22},"保障措施",{"key":31,"text":81,"correct":22},"防范措施",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1148907,"在有新旧工程交错以及维持社会交通条件下，市政公用工程的施工平面布置图有明显的（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"动态特性",{"key":24,"text":89,"correct":22},"限制性",{"key":27,"text":91,"correct":22},"不确定性",{"key":31,"text":93,"correct":22},"固定性",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1148908,"施工进度计划用（ ）表示，关键线路用粗线条（或双线）表示。",[98,100,102,104],{"key":20,"text":99,"correct":22},"流程图",{"key":24,"text":101,"correct":22},"甘特图",{"key":27,"text":103,"correct":29},"网络图",{"key":31,"text":105,"correct":22},"计划表",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1148909,"施工方案是施工组织设计的核心部分，主要包括拟建工程的主要（ ）的施工方法、施工机具的选择、施工顺序的确定等方面。",[110,112,114,116],{"key":20,"text":111,"correct":29},"分项工程",{"key":24,"text":113,"correct":22},"关键工程",{"key":27,"text":115,"correct":22},"单位工程",{"key":31,"text":117,"correct":22},"工程部位",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1148910,"分包工程的质量应由分包方向（ ）负责。",[122,124,126,128],{"key":20,"text":123,"correct":29},"承包方",{"key":24,"text":125,"correct":22},"发包方",{"key":27,"text":127,"correct":22},"业主",{"key":31,"text":129,"correct":22},"甲方",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1148911,"正确拟定（ ）和选择施工机具是合理组织施工的关键。",[134,136,138,140],{"key":20,"text":135,"correct":29},"施工方法",{"key":24,"text":137,"correct":22},"新技术",{"key":27,"text":139,"correct":22},"施工顺序",{"key":31,"text":141,"correct":22},"新工艺",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1148912,"施工方法（工艺）是施工方案的（ ）内容，具有决定性作用。",[146,148,150,152],{"key":20,"text":147,"correct":22},"主要",{"key":24,"text":149,"correct":22},"关键",{"key":27,"text":151,"correct":29},"核心",{"key":31,"text":153,"correct":22},"重要",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1148913,"正确地选择（ ）能使施工方法更为先进、合理、经济。",[158,159,160,161],{"key":20,"text":137,"correct":22},{"key":24,"text":141,"correct":22},{"key":27,"text":139,"correct":22},{"key":31,"text":162,"correct":29},"施工机具",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},1148914,"深度为15m的人工挖孔桩工程，（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"不需要编制专项方案也不需要专家论证",{"key":24,"text":170,"correct":22},"不需要编制专项方案但需要专家论证",{"key":27,"text":172,"correct":22},"要编制专项方案并需要专家论证",{"key":31,"text":174,"correct":29},"要编制专项方案但不需要专家论证",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},1148915,"施工单位应当在危险性较大的分部分项工程（ ）编制专项方案。",[179,180,181,182],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":29},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":27,"analysis":33},1148916,"高于8m或跨度大于（ ）m的城市桥梁支撑体系要编制专项方案，并经专家评审会议通过后方可实施。",[187,189,191,193],{"key":20,"text":188,"correct":22},"12",{"key":24,"text":190,"correct":22},"15",{"key":27,"text":192,"correct":29},"18",{"key":31,"text":194,"correct":22},"20",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":31,"analysis":33},1148917,"以下脚手架工程专项施工方案必须进行专家论证的是（ ）。",[199,201,203,205],{"key":20,"text":200,"correct":22},"高度40m及以上落地式钢管脚手架",{"key":24,"text":202,"correct":22},"提升高度80m及以上附着式整体提升脚手架",{"key":27,"text":204,"correct":22},"提升高度60m及以上附着式分片提升脚手架",{"key":31,"text":206,"correct":29},"分段架体搭设高度20米及以上的悬挑式脚手架工程",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},1148918,"施工期间交通导行方案设计是施工组织设计的（ ）部分。",[211,213,215,217],{"key":20,"text":212,"correct":29},"重要组成",{"key":24,"text":214,"correct":22},"关键组成",{"key":27,"text":216,"correct":22},"核心组成",{"key":31,"text":218,"correct":22},"一般组成",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},1148919,"（ ）应纳入施工现场管理，交通导行应根据不同的施工阶段设计交通导行方案。",[223,225,227,229],{"key":20,"text":224,"correct":22},"交通组织",{"key":24,"text":226,"correct":29},"交通导行",{"key":27,"text":228,"correct":22},"交通调查",{"key":31,"text":230,"correct":22},"交通措施",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},1148920,"在施工用地范围内，将各项生产、生活设施及其他辅助设施进行规划和布置，满足施工组织设计及维持（ ）要求。",[235,237,239,241],{"key":20,"text":236,"correct":29},"社会交通",{"key":24,"text":238,"correct":22},"市民生活",{"key":27,"text":240,"correct":22},"社会稳定",{"key":31,"text":242,"correct":22},"市民安全",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1148921,"工程施工阶段按照施工（ ）要求，设置道路、组织排水、搭建临时设施、堆放物料和停放机具设备等。",[247,249,251,253],{"key":20,"text":248,"correct":22},"围挡面积",{"key":24,"text":250,"correct":22},"现场需要",{"key":27,"text":252,"correct":22},"工期安排",{"key":31,"text":254,"correct":29},"总平面图",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":33},1148922,"关于施工现场围挡（墙）的要求，表述正确的是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":29},"在围挡内侧禁止堆放泥土、砂石等散状材料以及架管、模板",{"key":24,"text":262,"correct":22},"围挡的用材宜使用彩布条、竹笆或安全网",{"key":27,"text":264,"correct":22},"施工现场的围挡一般应高于2.1m",{"key":31,"text":266,"correct":22},"施工现场围挡（墙）在危险施工处设置，留有施工人员进出口",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},1148923,"施工现场进行硬化处理的主要目的是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"机械运输",{"key":24,"text":274,"correct":29},"减少扬尘",{"key":27,"text":276,"correct":22},"施工方便",{"key":31,"text":278,"correct":22},"防雨",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":33},1148924,"市政公用工程常常处于城镇区域，因而必须在施工组织设计中贯彻（ ）管理。",[283,285,287,289],{"key":20,"text":284,"correct":22},"文明施工",{"key":24,"text":286,"correct":22},"安全施工",{"key":27,"text":288,"correct":29},"绿色施工",{"key":31,"text":290,"correct":22},"环境保护",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},1148925,"施工现场应根据风力和大气湿度的具体情况，进行土方回填、转运作业，沿线安排（ ）降尘。",[295,297,299,301],{"key":20,"text":296,"correct":29},"洒水",{"key":24,"text":298,"correct":22},"覆盖",{"key":27,"text":300,"correct":22},"绿化",{"key":31,"text":302,"correct":22},"固化",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1148926,"现场存放的油料、化学溶剂等应设有专门的库房，地面应进行防（ ）处理。",[307,309,311,313],{"key":20,"text":308,"correct":29},"渗漏",{"key":24,"text":310,"correct":22},"腐",{"key":27,"text":312,"correct":22},"滑",{"key":31,"text":314,"correct":22},"软化",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":31,"analysis":33},1148927,"施工现场应按照现行国家标准制定降噪措施，并应对施工现场的噪声值进行（ ）和记录。",[319,321,323,325],{"key":20,"text":320,"correct":22},"分析",{"key":24,"text":322,"correct":22},"统计",{"key":27,"text":324,"correct":22},"研究",{"key":31,"text":326,"correct":29},"监测",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},1148928,"进入现场施工的劳务人员要佩戴工作卡，卡上注明姓名、身份证号、工种、所属劳务企业，没有佩戴工作卡的不得进入现场施工，该管理方式为（ ）管理。",[331,333,335,337],{"key":20,"text":332,"correct":29},"实名化",{"key":24,"text":334,"correct":22},"考核",{"key":27,"text":336,"correct":22},"注册",{"key":31,"text":338,"correct":22},"劳务",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},1148929,"劳务企业要根据劳务人员考勤表按月编制工资发放表，记录工资支付时间、支付金额，经本人签字确认后，张贴公示。劳务人员工资发放表须报（ ）项目部备案。",[343,345,347,349],{"key":20,"text":344,"correct":22},"业主方",{"key":24,"text":346,"correct":22},"分包方",{"key":27,"text":348,"correct":29},"总包方",{"key":31,"text":350,"correct":22},"劳务方",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":33},1148930,"劳务企业要根据劳务人员（ ）为劳务人员缴纳社会保险，并将缴费收据复印件、缴费名单报总包方项目部备案。",[355,357,359,361],{"key":20,"text":356,"correct":22},"工资台账",{"key":24,"text":358,"correct":29},"花名册",{"key":27,"text":360,"correct":22},"身份证",{"key":31,"text":362,"correct":22},"考勤表",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":27,"analysis":33},1148931,"（ ）应每季度进行一次项目部实名制管理检查，并对检查情况进行打分，年底进行综合评定。",[367,368,369,370],{"key":20,"text":346,"correct":22},{"key":24,"text":344,"correct":22},{"key":27,"text":348,"correct":29},{"key":31,"text":350,"correct":22},{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":27,"analysis":33},1148932,"项目进度控制总目标可按承包的专业或（ ）分解为阶段分目标。",[375,377,379,381],{"key":20,"text":376,"correct":22},"完成阶段",{"key":24,"text":378,"correct":22},"合同阶段",{"key":27,"text":380,"correct":29},"施工阶段",{"key":31,"text":382,"correct":22},"检验阶段",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},1148933,"分包人的施工进度计划应是承包人施工总进度计划的（ ）。",[387,389,391,393],{"key":20,"text":388,"correct":22},"基础",{"key":24,"text":390,"correct":29},"控制范畴",{"key":27,"text":392,"correct":22},"依据",{"key":31,"text":394,"correct":22},"组成部分",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},1148934,"项目进度控制总目标可按单位工程分解为（ ）分目标。",[399,401,403,405],{"key":20,"text":400,"correct":29},"交工",{"key":24,"text":402,"correct":22},"竣工",{"key":27,"text":404,"correct":22},"时间",{"key":31,"text":406,"correct":22},"专业",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1148935,"在工程实施过程中，对进度计划的调整的依据是（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":22},"进度计划变更单",{"key":24,"text":414,"correct":22},"业主的指令",{"key":27,"text":416,"correct":22},"监理的指令",{"key":31,"text":418,"correct":29},"进度计划检查审核结果",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":27,"analysis":33},1148936,"月、旬（或周）施工进度计划是（ ）性作业计划。",[423,425,426,428],{"key":20,"text":424,"correct":22},"控制",{"key":24,"text":388,"correct":22},{"key":27,"text":427,"correct":29},"实施",{"key":31,"text":429,"correct":22},"阶段",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1148937,"工程项目施工进度计划在实施过程中进行必要调整的依据是施工进度（ ）结果。",[434,436,438,440],{"key":20,"text":435,"correct":22},"月度检查",{"key":24,"text":437,"correct":22},"例行统计",{"key":27,"text":439,"correct":29},"检查审核",{"key":31,"text":441,"correct":22},"现场巡视",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1148938,"工程项目进度调整的内容包括工程量、持续时间、工作关系及（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"作业场地",{"key":24,"text":449,"correct":29},"资源供应",{"key":27,"text":451,"correct":22},"材料运输",{"key":31,"text":453,"correct":22},"水电供应",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},1148939,"跟踪工程部位的（ ），以便对工程量、总产值、耗用的人工、材料和机械台班等的数量进行统计与分析。",[458,460,462,464],{"key":20,"text":459,"correct":29},"形象进度",{"key":24,"text":461,"correct":22},"计划变更",{"key":27,"text":463,"correct":22},"分包进度",{"key":31,"text":465,"correct":22},"计划进度",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},1148940,"工程项目进度执行情况的综合描述，不包括（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"报告的起止期",{"key":24,"text":473,"correct":22},"原定目标",{"key":27,"text":475,"correct":22},"实际完成情况",{"key":31,"text":477,"correct":29},"进度检查",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},1148941,"施工项目质量保证计划应体现从资源投入到工程质量最终检验的（ ）控制。",[482,484,486,488],{"key":20,"text":483,"correct":29},"全过程",{"key":24,"text":485,"correct":22},"质量目标",{"key":27,"text":487,"correct":22},"质量",{"key":31,"text":489,"correct":22},"过程",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},1148942,"施工项目质量保证计划应由（ ）主持编制。",[494,496,498,500],{"key":20,"text":495,"correct":22},"项目质量负责人",{"key":24,"text":497,"correct":22},"项目技术负责人",{"key":27,"text":499,"correct":29},"项目负责人",{"key":31,"text":501,"correct":22},"项目生产负责人",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},1148943,"质量保证计划的管理体系与组织机构中，应有（ ）。",[506,508,510,511],{"key":20,"text":507,"correct":22},"作业指导书",{"key":24,"text":509,"correct":29},"人员培训计划",{"key":27,"text":75,"correct":22},{"key":31,"text":512,"correct":22},"持续改进流程",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},1148944,"市政公用工程施工项目质量计划应由（ ）主持编制。",[517,519,521,523],{"key":20,"text":518,"correct":22},"建设单位项目负责人",{"key":24,"text":520,"correct":22},"总监理工程师",{"key":27,"text":522,"correct":22},"设计单位技术负责人",{"key":31,"text":524,"correct":29},"施工项目经理",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},1148945,"施工项目部应建立质量责任制和（ ）办法。",[529,531,533,535],{"key":20,"text":530,"correct":29},"考核评价",{"key":24,"text":532,"correct":22},"质量控制",{"key":27,"text":534,"correct":22},"监督检查",{"key":31,"text":536,"correct":22},"质量管理",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},1148946,"实行分包的分项、分部工程，应制定（ ）和质量保证措施。",[541,543,544,545],{"key":20,"text":542,"correct":22},"质量计划",{"key":24,"text":485,"correct":22},{"key":27,"text":532,"correct":22},{"key":31,"text":546,"correct":29},"质量验收程序",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1148947,"施工准备阶段质量管理，应建立（ ）和组织机构，建立各级岗位责任制。",[551,553,555,557],{"key":20,"text":552,"correct":29},"质量管理体系",{"key":24,"text":554,"correct":22},"质量保证体系",{"key":27,"text":556,"correct":22},"质量控制体系",{"key":31,"text":558,"correct":22},"质量监督体系",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},1148948,"（ ）按质量计划中关于工程分包和物资采购的规定，经招标程序选择并评价分包方和供应商，保存评价记录。",[563,564,565,566],{"key":20,"text":495,"correct":22},{"key":24,"text":497,"correct":22},{"key":27,"text":499,"correct":29},{"key":31,"text":501,"correct":22},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},1148949,"对于特殊过程的质量控制，以下说法正确的是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"对工程施工项目质量计划规定的特殊过程，可不设置质量控制点",{"key":24,"text":574,"correct":29},"编制的作业指导书，应经项目部或企业技术负责人审批后执行。",{"key":27,"text":576,"correct":22},"不太成熟的工艺应安排试验，编制成作业指导书，根据情况进行首件（段）验收",{"key":31,"text":578,"correct":22},"编制的作业指导书，应经监理工程师审批后执行",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},1148950,"施工质量控制中，进行不合格让步接收时，工程施工项目部应向（ ）提出书面让步接收申请。",[583,584,586,587],{"key":20,"text":125,"correct":29},{"key":24,"text":585,"correct":22},"监理",{"key":27,"text":348,"correct":22},{"key":31,"text":588,"correct":22},"质量监督部门",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},1148951,"施工过程质量控制中，不包括（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":29},"成品质量控制",{"key":24,"text":596,"correct":22},"分项工程（工序）控制",{"key":27,"text":598,"correct":22},"特殊过程控制",{"key":31,"text":600,"correct":22},"不合格产品控制",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]