[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,2,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,321,333,345,357,369,381,392,404,415,427,438,450,462,474,486,498,510,521,533,545,556,568,577,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1147986,1,"单选题","（2019 年真题）人行桥是按（ ）进行分类的。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","用途",true,{"key":24,"text":25,"correct":26},"B","跨径",false,{"key":28,"text":29,"correct":26},"C","材料",{"key":31,"text":32,"correct":26},"D","人行道位置","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1147987,"（2014 年真题）关于桥梁模板及承重支架的设计与施工的说法，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"模板及支架应具有足够的承载力、刚度和稳定性",{"key":24,"text":41,"correct":26},"支架立柱高于5m 时，应在两横撑之间加剪刀撑",{"key":28,"text":43,"correct":26},"支架通行孔的两边应加护桩，夜间设警示灯",{"key":31,"text":45,"correct":22},"施工脚手架应与支架相连，以提高整体稳定性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1147988,"（2020年真题）钢梁制造企业应向安装企业提供的相关文件中，不包括（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"产品合格证",{"key":24,"text":53,"correct":22},"钢梁制造环境的温度、湿度记录",{"key":28,"text":55,"correct":26},"钢材检验报告",{"key":31,"text":57,"correct":26},"工厂试拼装记录",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1147989,"（2020年真题）关于先张法预应力空心板梁的场内移运和存放的说法，错误的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"吊运时，混凝土强度不得低于设计强度的75%",{"key":24,"text":65,"correct":26},"存放时，支点处应采用垫木支承",{"key":28,"text":67,"correct":26},"存放时间可长达3个月",{"key":31,"text":69,"correct":22},"同长度的构件，多层叠放时，上下层垫木在竖直面上应适当错开",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1147990,"（2020年真题）关于桥梁支座的说法，错误的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"支座传递上部结构承受的荷载",{"key":24,"text":77,"correct":26},"支座传递上部结构承受的位移",{"key":28,"text":79,"correct":26},"支座传递上部结构承受的转角",{"key":31,"text":81,"correct":22},"支座对桥梁变形的约束应尽可能的大，以限制梁体自由伸缩",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1147991,"（2020年真题）现场绑扎钢筋时，不需要全部用绑丝绑扎的交叉点是（）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"受力钢筋的交叉点",{"key":24,"text":89,"correct":26},"单向受力钢筋网片外围两行钢筋交叉点",{"key":28,"text":91,"correct":22},"单向受力钢筋网中间部分交叉点",{"key":31,"text":93,"correct":26},"双向受力钢筋的交叉点",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1147992,"（2019 年真题）预制桩的接桩不宜使用的连接方法是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"焊接",{"key":24,"text":101,"correct":26},"法兰连接",{"key":28,"text":103,"correct":22},"环氧类结构胶连接",{"key":31,"text":105,"correct":26},"机械连接",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1147993,"（2011 年真题）沉桩施工时不宜用射水方法的施工的土层（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"黏性土",{"key":24,"text":113,"correct":26},"砂层",{"key":28,"text":115,"correct":26},"卵石地层",{"key":31,"text":117,"correct":26},"粉细砂层",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1147994,"（2015 年真题）地下水位以下土层的桥梁基础施工，不适宜采用成桩设备是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"正循环回旋钻机",{"key":24,"text":125,"correct":26},"旋挖钻机",{"key":28,"text":127,"correct":22},"长螺旋钻机",{"key":31,"text":129,"correct":26},"冲孔钻机",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1147995,"（2011 年真题）桥梁施工时合拢段说法错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"合拢前应观测气温变化与梁端高程及悬臂端间距的关系",{"key":24,"text":137,"correct":26},"合拢段的混凝土强度宜提高一级",{"key":28,"text":139,"correct":26},"合拢段长度宜为2m",{"key":31,"text":141,"correct":22},"气温最高时浇筑",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1147996,"（2017 年真题）在移动模架上浇筑预应力混凝土连续梁时，浇筑分段施工缝应设在（ ）零点附近。",[146,148,150,152],{"key":20,"text":147,"correct":26},"拉力",{"key":24,"text":149,"correct":22},"弯矩",{"key":28,"text":151,"correct":26},"剪力",{"key":31,"text":153,"correct":26},"扭矩",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1147997,"（2019 年真题）关于装配式预制混凝土梁存放的说法，正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"预制梁可直接支承在混凝土存放台座上",{"key":24,"text":161,"correct":22},"构件应按其安装的先后顺序编号存放",{"key":28,"text":163,"correct":26},"多层叠放是，各层垫木的位置在竖直线上应错开",{"key":31,"text":165,"correct":26},"预应力混凝土梁存放时间最长为6 个月",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1147998,"（2012 年真题）关于装配式梁板吊装要求的说法，正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"吊装就位时混凝土强度为梁体设计强度的70%",{"key":24,"text":173,"correct":26},"调移板式构件时，不用考虑其哪一面朝上",{"key":28,"text":175,"correct":22},"吊绳与起吊构件的交角小于60 度时，应设置吊架或吊装扁担",{"key":31,"text":177,"correct":26},"预应力混凝土构件待孔道压浆强度达20Mpa 才能吊装",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1147999,"（2016 年真题）关于桥梁悬臂浇筑法施工的说法，错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"浇筑混凝土时，宜从与前段混凝土连接端开始，最后结束于悬臂前端",{"key":24,"text":185,"correct":26},"中跨合龙段应最后浇筑，混凝土强度宜提高一级",{"key":28,"text":187,"correct":26},"桥墩两侧梁段悬臂施工应对称进行",{"key":31,"text":189,"correct":26},"连续梁的梁跨体系转换应在解除各墩临时固结后进行",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1148000,"（2016 年真题）关于钢梁施工的说法，正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"人行天桥钢梁出厂前可不进行试拼装",{"key":24,"text":197,"correct":26},"多节段钢梁安装时，应全部节段安装完成后再测量其位置、标高和预拱度",{"key":28,"text":199,"correct":26},"施拧钢梁高强螺栓时，最后应采用木棍敲击拧紧",{"key":31,"text":201,"correct":22},"钢梁顶板的受压横向对接焊缝应全部进行超声波探伤检验",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1148001,"（2017 年真题）预制梁板吊装时,吊绳与梁板的交角为（ ）时,应设置吊架或吊装扁担。",[206,208,210,212],{"key":20,"text":207,"correct":26},"45°",{"key":24,"text":209,"correct":22},"60°",{"key":28,"text":211,"correct":26},"75°",{"key":31,"text":213,"correct":26},"90°",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1148002,"（2013 年真题）预应力混凝土连续梁合龙宜在一天中气温（ ）时进行。",[218,220,222,224],{"key":20,"text":219,"correct":26},"最高",{"key":24,"text":221,"correct":26},"较高",{"key":28,"text":223,"correct":22},"最低",{"key":31,"text":225,"correct":26},"较低",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1148003,"（2012 年真题）关于箱涵顶进的说法，正确的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"箱涵主体结构混凝土强度必须达到设计强度的75%",{"key":24,"text":233,"correct":26},"当顶力达到0.9 倍结构自重时箱涵未启动，应立即停止顶进",{"key":28,"text":235,"correct":26},"箱涵顶进必须避开雨期",{"key":31,"text":237,"correct":22},"顶进过程中，每天应定时观测箱涵底板上设置观测标钉的高程",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1148004,"（2012 年真题）在松软含水地层，施工条件困难地段修建隧道。且地面构筑物不允许拆迁，宜先考虑（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"明挖法",{"key":24,"text":245,"correct":22},"盾构法",{"key":28,"text":247,"correct":26},"浅埋暗挖法",{"key":31,"text":249,"correct":26},"新奥法",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1148005,"（2018 年真题）两条单线区间地铁隧道之间应设置横向联络通道，其作用不包括（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"隧道排水",{"key":24,"text":257,"correct":26},"隧道防火消防",{"key":28,"text":259,"correct":26},"安全疏散乘客",{"key":31,"text":261,"correct":22},"机车转向调头",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1148006,"（2013 年真题）城市轨道交通地面正线宜采用（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"长枕式整体道床",{"key":24,"text":269,"correct":26},"短枕式整体道床",{"key":28,"text":271,"correct":26},"木枕碎石道床",{"key":31,"text":273,"correct":22},"混凝土枕碎石道床",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1148008,"（2014 年真题）关于隧道浅埋暗挖法施工的说法，错误的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"施工时不允许带水作业",{"key":24,"text":281,"correct":26},"要求开挖面具有一定的自立性和稳定性",{"key":28,"text":283,"correct":22},"常采用预制装配式衬砌",{"key":31,"text":285,"correct":26},"与新奥法相比，初期支护允许变形量较小",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1148009,"（2020年真题）地铁基坑采用的围护结构形式很多，其中强度大，开挖深度大，同时可兼作主体结构一部分的围护结构是（）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"重力式水泥土挡墙",{"key":24,"text":293,"correct":22},"地下连续墙",{"key":28,"text":295,"correct":26},"预制混凝土板桩",{"key":31,"text":297,"correct":26},"SMW工法桩",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1148010,"（2016 年真题）SMW 工法桩（型钢水泥土搅拌桩）复合围护结构多用于（ ）地层",[302,304,306,308],{"key":20,"text":303,"correct":22},"软土",{"key":24,"text":305,"correct":26},"软岩",{"key":28,"text":307,"correct":26},"砂卵石",{"key":31,"text":309,"correct":26},"冻土",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1148011,"（2010 年真题）下列基坑围护结构中，主要结构材料可以回收反复使用的是（ ）。",[314,315,317,319],{"key":20,"text":293,"correct":26},{"key":24,"text":316,"correct":26},"灌注桩",{"key":28,"text":318,"correct":26},"水泥挡土墙",{"key":31,"text":320,"correct":22},"组合式SMW 桩",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1148012,"（2016 年真题）基坑边坡坡度是直接影响基坑稳定的重要因素，当基坑边坡土体中的剪应力大于土体的（ ）强度时，边坡就会失稳坍塌。",[325,327,329,331],{"key":20,"text":326,"correct":26},"抗扭",{"key":24,"text":328,"correct":26},"抗拉",{"key":28,"text":330,"correct":26},"抗压",{"key":31,"text":332,"correct":22},"抗剪",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1148013,"（2019 年真题）适用于中砂以上的砂性土和有裂隙的岩石土层的注浆方法是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":26},"劈裂注浆",{"key":24,"text":340,"correct":22},"渗透注浆",{"key":28,"text":342,"correct":26},"压密注浆",{"key":31,"text":344,"correct":26},"电动化学注浆",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},1148014,"（2014 年真题水泥土搅拌法地基加固适用于（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"障碍物较多的杂填土",{"key":24,"text":352,"correct":26},"欠固结的淤泥质土",{"key":28,"text":354,"correct":22},"可塑的黏性土",{"key":31,"text":356,"correct":26},"密实的砂类土",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":28,"analysis":33},1148015,"（2011 年真题）降水工程说法正确的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":26},"降水施工有利于增强土体强度",{"key":24,"text":364,"correct":26},"开挖深度浅时，不可以进行集水明排",{"key":28,"text":366,"correct":22},"环境安全考虑，要回灌",{"key":31,"text":368,"correct":26},"在软土地区基坑开挖深度超过5m,一般就要用井点降水",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":31,"analysis":33},1148016,"（2015 年真题）地下连续墙的施工工艺不包括（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":26},"导墙墙工",{"key":24,"text":376,"correct":26},"槽底消淤",{"key":28,"text":378,"correct":26},"吊放钢筋笼",{"key":31,"text":380,"correct":22},"拔出型钢",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},1148017,"（2015 年真题）沿海软土地区深度小于7m 的二、三级基坑，不设内支撑时，常用的支护结构（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"拉锚式支护",{"key":24,"text":388,"correct":26},"钢板桩支护",{"key":28,"text":390,"correct":26},"重力式水泥土墙",{"key":31,"text":293,"correct":26},{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1148018,"（2012 年真题）当基坑开挖较浅且未设支撑时，围护墙体水平变形表现为（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"墙顶位移最大，向基坑方向水平位移",{"key":24,"text":399,"correct":26},"墙顶位移最大，背离基坑方向水平位移",{"key":28,"text":401,"correct":26},"墙底位移最大，向基坑方向水平位移",{"key":31,"text":403,"correct":26},"墙底位移最大，背离基坑方向水平位移",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":33},1148019,"（2017 年真题）主要材料可反复使用,止水性好的基坑围护结构是（ ）。",[408,410,411,413],{"key":20,"text":409,"correct":26},"钢管桩",{"key":24,"text":316,"correct":26},{"key":28,"text":412,"correct":22},"SMW 工法桩",{"key":31,"text":414,"correct":26},"型钢桩",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},1148020,"（2018 年真题）.疏干地下水有增加坑内土体强度的作用，有利于控制基坑围护的（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"沉降",{"key":24,"text":422,"correct":26},"绕流",{"key":28,"text":424,"correct":22},"变形",{"key":31,"text":426,"correct":26},"渗漏",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},1148021,"（2013 年真题）场地地面空旷、地址条件较好、周围无需要保护的建（构）筑物时，应优先采用基坑施工方法（ ）。",[431,433,434,436],{"key":20,"text":432,"correct":22},"放坡开挖",{"key":24,"text":388,"correct":26},{"key":28,"text":435,"correct":26},"钻孔灌注桩支护",{"key":31,"text":437,"correct":26},"地下连续墙支护",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1148022,"（2014 年真题）设有支护的基坑土方开挖过程中，能够反映坑底土体隆起的监测项目是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"立柱变形",{"key":24,"text":445,"correct":26},"冠梁变形",{"key":28,"text":447,"correct":26},"地表沉降",{"key":31,"text":449,"correct":26},"支撑梁变形",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1148023,"（2015 年真题）下列盾构类型中，属于密闭式盾构的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"泥土加压式盾构",{"key":24,"text":457,"correct":26},"手掘式盾构",{"key":28,"text":459,"correct":26},"半机械挖掘时盾构",{"key":31,"text":461,"correct":26},"机械挖掘时盾构",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},1148024,"（2017 年真题）下列盾构掘进的地层中,需要釆取措施控制后续沉降的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":26},"岩层",{"key":24,"text":469,"correct":26},"卵石",{"key":28,"text":471,"correct":22},"软弱黏性土",{"key":31,"text":473,"correct":26},"砂土",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},1148025,"（2020年真题）盾构接收施工，工序可分为①洞门凿除、②到达段掘进、③接收基座安装与固定、④洞门密封安装、⑤盾构接收，施工程序正确的是（）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"①-③-④-②-⑤",{"key":24,"text":481,"correct":26},"①-②-③-④-⑤",{"key":28,"text":483,"correct":26},"①-④-②-③-⑤",{"key":31,"text":485,"correct":26},"①-②-④-③-⑤",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1148026,"（2015 年真题）喷射混凝土必须采用的外加剂是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"减水剂",{"key":24,"text":493,"correct":22},"速凝剂",{"key":28,"text":495,"correct":26},"引气剂",{"key":31,"text":497,"correct":26},"缓凝剂",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},1148027,"（2013 年真题下列喷锚暗挖开挖方式中，防水效果较差的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"全断面法",{"key":24,"text":505,"correct":26},"环形开挖预留核心土法",{"key":28,"text":507,"correct":26},"交叉中隔壁（CRD）法",{"key":31,"text":509,"correct":22},"双侧壁导坑法",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},1148028,"（2010 年真题）采用喷锚暗挖法施工多层多跨结构隧道时，宜采用的施工方法为（ ）。",[514,515,517,519],{"key":20,"text":503,"correct":26},{"key":24,"text":516,"correct":26},"正台阶法",{"key":28,"text":518,"correct":26},"单侧壁导坑法",{"key":31,"text":520,"correct":22},"柱洞法",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1148029,"（2012 年真题）喷射混凝土应采用（ ）混凝土，严禁选用具有碱性集料。",[525,527,529,531],{"key":20,"text":526,"correct":22},"早强",{"key":24,"text":528,"correct":26},"高强",{"key":28,"text":530,"correct":26},"低温",{"key":31,"text":532,"correct":26},"负温",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},1148030,"（2014 年真题关于隧道全断面暗挖法施工的说法，错误的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":26},"可减少开挖对围岩的扰动次数",{"key":24,"text":540,"correct":26},"围岩必须有足够的自稳能力",{"key":28,"text":542,"correct":26},"自上而下一次开挖成形并及时进行初期支护",{"key":31,"text":544,"correct":22},"适用于地表沉降难于控制的隧道施工",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},1148031,"（2011 年真题）暗挖施工中防水效果差的工法是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":26},"全断面",{"key":24,"text":552,"correct":26},"中隔壁法",{"key":28,"text":554,"correct":22},"侧洞法",{"key":31,"text":518,"correct":26},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},1148032,"（2015 年真题）关于喷锚暗挖法二衬混凝土施工的说法，错误的是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":26},"可采用补偿收缩混凝土",{"key":24,"text":563,"correct":26},"可采用组合钢模板和钢模板台车两种模板体系",{"key":28,"text":565,"correct":26},"采用泵送入模浇筑",{"key":31,"text":567,"correct":22},"混凝土应两侧对称，水平浇筑，可设置水平和倾斜解封",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":28,"analysis":33},1148033,"（2019 年真题）沿隧道轮廓采取自上而下一次开挖成形，按施工方案一次进尺并及时进行初期支护的方法称为（ ）。",[572,573,575,576],{"key":20,"text":516,"correct":26},{"key":24,"text":574,"correct":26},"中洞法",{"key":28,"text":503,"correct":22},{"key":31,"text":505,"correct":26},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},1148034,"（2013 年真题）用于基坑边坡支护的喷射混凝土的主要外加剂是（ ）。",[581,583,584,586],{"key":20,"text":582,"correct":26},"膨胀剂",{"key":24,"text":495,"correct":26},{"key":28,"text":585,"correct":26},"防水剂",{"key":31,"text":493,"correct":22},{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":28,"analysis":33},1148035,"（2015 年真题）钢筋混凝土结构外表面需设置保温层和饰面层的水处理建筑物是（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":26},"沉砂池",{"key":24,"text":594,"correct":26},"沉淀池",{"key":28,"text":596,"correct":22},"消化池",{"key":31,"text":598,"correct":26},"浓缩池",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":24,"analysis":33},1148036,"（2017 年真题）下列给水排水构筑物中,属于调蓄构筑物的是（ ）。",[603,605,607,609],{"key":20,"text":604,"correct":26},"澄清池",{"key":24,"text":606,"correct":22},"清水池",{"key":28,"text":608,"correct":26},"生物塘",{"key":31,"text":610,"correct":26},"反应池",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]