[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,19,50,2019,[13,34,46,58,70,82,94,106,116,128,140,152,164,175,187,199,211,223,233,245,257,269,281,293,305,316,328,340,352,360,372,384,396,408,419,431,443,455,467,479,491,503,515,527,539,550,559,571,583,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1148852,1,"单选题","工程量清单中的措施项目为（ ）项目。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","固定",false,{"key":24,"text":25,"correct":26},"B","可调",true,{"key":28,"text":29,"correct":22},"C","风险",{"key":31,"text":32,"correct":22},"D","暂列","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1148853,"（ ）应按照招标人在招标控制价的其他项目费中相应列出的金额计算，不得修改和调整。",[38,40,42,44],{"key":20,"text":39,"correct":26},"暂列金额",{"key":24,"text":41,"correct":22},"担保金额",{"key":28,"text":43,"correct":22},"单价金额",{"key":31,"text":45,"correct":22},"设备单价",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1148854,"综合单价是按招标文件中分部分项（ ）项目的特征描述确定的。",[50,52,54,56],{"key":20,"text":51,"correct":22},"概算",{"key":24,"text":53,"correct":22},"估算",{"key":28,"text":55,"correct":22},"预算",{"key":31,"text":57,"correct":26},"工程量清单",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1148855,"投标文件不能由（ ）来签署。",[62,64,66,68],{"key":20,"text":63,"correct":22},"法人代表",{"key":24,"text":65,"correct":22},"法人授权委托人",{"key":28,"text":67,"correct":22},"注册造价工程师",{"key":31,"text":69,"correct":26},"项目经理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1148856,"建设项目设计概算是（ ）阶段，由设计单位按设计内容概略算出该工程立项开始到交付使用之间的全过程发生的建设费用文件。",[74,76,78,80],{"key":20,"text":75,"correct":22},"可行性研究",{"key":24,"text":77,"correct":22},"方案设计",{"key":28,"text":79,"correct":26},"初步设计",{"key":31,"text":81,"correct":22},"施工图设计",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1148857,"设计概算分级通常不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"单位工程概算",{"key":24,"text":89,"correct":22},"单项工程综合概算",{"key":28,"text":91,"correct":26},"安装工程概算",{"key":31,"text":93,"correct":22},"建设工程总概算",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1148858,"编制建设工程总概算时，市政公用建设项目一般排列顺序为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"辅助建（构）筑物、配套系统、主体建（构）筑物",{"key":24,"text":101,"correct":22},"配套系统、辅助建（构）筑物、主体建（构）筑物",{"key":28,"text":103,"correct":26},"主体建（构）筑物、辅助建（构）筑物、配套系统",{"key":31,"text":105,"correct":22},"辅助建（构）筑物、主体建（构）筑物、配套系统",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1148859,"单位工程概算是编制（ ）的依据。",[110,112,114,115],{"key":20,"text":111,"correct":22},"专业工程概算",{"key":24,"text":113,"correct":22},"设计概算",{"key":28,"text":89,"correct":26},{"key":31,"text":93,"correct":22},{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1148860,"设计概算批准后，一般不得调整。若影响工程概算的主要因素已经清楚，且已通过审批同意，工程量完成了一定量后方可进行调整，但一个工程项目只允许调整（ ）概算。",[120,122,124,126],{"key":20,"text":121,"correct":26},"一次",{"key":24,"text":123,"correct":22},"三次",{"key":28,"text":125,"correct":22},"两次",{"key":31,"text":127,"correct":22},"四次",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1148861,"建设项目（ ）是建设工程项目招投标和控制施工成本的重要依据。",[132,134,136,138],{"key":20,"text":133,"correct":26},"施工图预算",{"key":24,"text":135,"correct":22},"土建工程预算",{"key":28,"text":137,"correct":22},"施工图概算",{"key":31,"text":139,"correct":22},"单位工程预算",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1148862,"当建设项目有多个单项工程时，应采用（ ）预算编制形式。",[144,146,148,150],{"key":20,"text":145,"correct":22},"一级",{"key":24,"text":147,"correct":26},"三级",{"key":28,"text":149,"correct":22},"二级",{"key":31,"text":151,"correct":22},"四级",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},1148863,"单项工程（ ）是反映施工图设计阶段一个单项工程（设计单元）造价的文件。",[156,158,160,162],{"key":20,"text":157,"correct":22},"综合概算",{"key":24,"text":159,"correct":22},"综合成本",{"key":28,"text":161,"correct":22},"综合造价",{"key":31,"text":163,"correct":26},"综合预算",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1148864,"建筑工程施工图预算不包括（ ）。",[168,170,172,173],{"key":20,"text":169,"correct":26},"单位工程施工图预算",{"key":24,"text":171,"correct":22},"建筑安装工程预算",{"key":28,"text":135,"correct":22},{"key":31,"text":174,"correct":22},"构筑物工程预算",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1148865,"工程量清单计价模式是指按照国家统一的工程量计算规则，工程数量采用（ ）的形式计算工程造价的方法。",[179,181,183,185],{"key":20,"text":180,"correct":26},"综合单价",{"key":24,"text":182,"correct":22},"企业定额",{"key":28,"text":184,"correct":22},"预算定额",{"key":31,"text":186,"correct":22},"市场价格",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":28,"analysis":33},1148866,"采用综合单价法编制施工图预算是以（ ）为计算单元。",[191,193,195,197],{"key":20,"text":192,"correct":22},"建设工程",{"key":24,"text":194,"correct":22},"单项工程",{"key":28,"text":196,"correct":26},"分项工程",{"key":31,"text":198,"correct":22},"单位工程",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},1148867,"工程计量时，若发现工程量清单中出现漏项或计算偏差，应按承包人在履行合同义务过程中（ ）的工程量计算。",[203,205,207,209],{"key":20,"text":204,"correct":22},"增加",{"key":24,"text":206,"correct":22},"合同约定",{"key":28,"text":208,"correct":22},"减少",{"key":31,"text":210,"correct":26},"实际完成",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},1148868,"招标人提供的工程量清单中必须列出各个清单项目的（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"工程数量",{"key":24,"text":218,"correct":22},"人工费",{"key":28,"text":220,"correct":22},"计价方式",{"key":31,"text":222,"correct":22},"材料费",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1148869,"施工中出现施工图纸（含设计变更）与工程量清单项目特征描述不符的，发、承包双方应按（ ）确定相应工程量清单的综合单价。",[227,229,231,232],{"key":20,"text":228,"correct":26},"新的项目特征",{"key":24,"text":230,"correct":22},"类似项目",{"key":28,"text":206,"correct":22},{"key":31,"text":186,"correct":22},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":28,"analysis":33},1148870,"投标人经复核对招标人公布的招标控制价有异议的，应在招标控制价公布后（ ）d内，向管理机构投诉。",[237,239,241,243],{"key":20,"text":238,"correct":22},"7",{"key":24,"text":240,"correct":22},"14",{"key":28,"text":242,"correct":26},"5",{"key":31,"text":244,"correct":22},"28",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},1148871,"招标工程以（ ）28d为基准日，其后国家的法律、法规、规章和政策发生变化影响工程造价的，应按省级或行业建设主管部门或其授权的工程造价管理机构发布的规定调整合同价款。",[249,251,253,255],{"key":20,"text":250,"correct":26},"投标截止日前",{"key":24,"text":252,"correct":22},"投标截止日后",{"key":28,"text":254,"correct":22},"中标后",{"key":31,"text":256,"correct":22},"合同签订前",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},1148872,"非承包人原因引起的工程量增减，该项工程量变化在合同约定幅度以内的，应（ ）单价。",[261,263,265,267],{"key":20,"text":262,"correct":22},"相应调整",{"key":24,"text":264,"correct":26},"执行合同",{"key":28,"text":266,"correct":22},"重新核对",{"key":31,"text":268,"correct":22},"双方协商",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1148873,"施工期内市场价格波动超出一定幅度时，且合同约定不明确时，工程价款（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"不能调整",{"key":24,"text":276,"correct":22},"按合同约定调整",{"key":28,"text":278,"correct":26},"可调整",{"key":31,"text":280,"correct":22},"双方协商调整",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":28,"analysis":33},1148874,"因不可抗力事件导致承包人的施工机械设备的损坏及停工损失，应由（ ）承担。",[285,287,289,291],{"key":20,"text":286,"correct":22},"发包人",{"key":24,"text":288,"correct":22},"保险公司",{"key":28,"text":290,"correct":26},"承包人",{"key":31,"text":292,"correct":22},"双方",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},1148875,"以下（ ）一般不属于发包人义务。",[297,299,301,303],{"key":20,"text":298,"correct":22},"提供施工场地",{"key":24,"text":300,"correct":22},"发出开工通知",{"key":28,"text":302,"correct":26},"施工场地及周边环境与生态保护",{"key":31,"text":304,"correct":22},"组织设计交底",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1148876,"合同协议书由发包人和承包人的（ ）或其委托代理人在合同协议书上签字并盖章后，合同生效。",[309,311,313,315],{"key":20,"text":310,"correct":22},"法人",{"key":24,"text":312,"correct":26},"法定代表人",{"key":28,"text":314,"correct":22},"招标投标负责人",{"key":31,"text":69,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1148877,"工程接收证书颁发时，尚有部分未竣工工程的，（ ）应负责该未竣工工程的照管和维护。",[320,322,324,326],{"key":20,"text":321,"correct":22},"发包方",{"key":24,"text":323,"correct":26},"承包方",{"key":28,"text":325,"correct":22},"分包方",{"key":31,"text":327,"correct":22},"承包方、分包方",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},1148878,"施工项目必须采用（ ）订立合同、洽商变更和记录。",[332,334,336,338],{"key":20,"text":333,"correct":26},"书面形式",{"key":24,"text":335,"correct":22},"协议书",{"key":28,"text":337,"correct":22},"电子文档",{"key":31,"text":339,"correct":22},"口头协议",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":28,"analysis":33},1148879,"施工过程中遇到的合同变更，（ ）必须掌握变更情况，遵照有关规定及时办理变更手续。",[344,346,348,350],{"key":20,"text":345,"correct":22},"监理工程师",{"key":24,"text":347,"correct":22},"业主代表",{"key":28,"text":349,"correct":26},"项目负责人",{"key":31,"text":351,"correct":22},"企业负责人",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1148880,"当合同约定内容完成后，（ ）应进行总结与评价。",[356,357,358,359],{"key":20,"text":323,"correct":26},{"key":24,"text":325,"correct":22},{"key":28,"text":321,"correct":22},{"key":31,"text":69,"correct":22},{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":28,"analysis":33},1148881,"进行索赔须有正当索赔理由和充分证据，索赔事件发生（ ）内，向监理工程师发出索赔意向通知。",[364,366,368,370],{"key":20,"text":365,"correct":22},"15d",{"key":24,"text":367,"correct":22},"45d",{"key":28,"text":369,"correct":26},"28d",{"key":31,"text":371,"correct":22},"60d",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":28,"analysis":33},1148882,"工程索赔必须以（ ）为依据。",[376,378,380,382],{"key":20,"text":377,"correct":22},"法律",{"key":24,"text":379,"correct":22},"证据",{"key":28,"text":381,"correct":26},"合同",{"key":31,"text":383,"correct":22},"正当理由",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},1148883,"当索赔事件持续进行时，承包方应当（ ）向监理工程师发出索赔意向。",[388,390,392,394],{"key":20,"text":389,"correct":26},"阶段性",{"key":24,"text":391,"correct":22},"持续",{"key":28,"text":393,"correct":22},"最终",{"key":31,"text":395,"correct":22},"推迟",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},1148884,"施工前准备阶段，建设单位延期发出图纸，承包方（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"可提出工期和费用索赔",{"key":24,"text":403,"correct":26},"可提出工期索赔，但不可提出费用索赔",{"key":28,"text":405,"correct":22},"可提出费用索赔，但不可提出工期索赔",{"key":31,"text":407,"correct":22},"不可提出工期和费用索赔",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},1148885,"对合同工期内发生的每笔索赔均应及时登记。工程完工时应形成完整的资料，作为工程（ ）资料的组成部分。",[412,414,416,417],{"key":20,"text":413,"correct":22},"计量",{"key":24,"text":415,"correct":22},"技术",{"key":28,"text":381,"correct":22},{"key":31,"text":418,"correct":26},"竣工",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},1148886,"索赔申请表中，不包括（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"索赔金额",{"key":24,"text":426,"correct":22},"证明文件",{"key":28,"text":428,"correct":22},"索赔项目",{"key":31,"text":430,"correct":26},"索赔事件的起因",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1148887,"在国内工程总承包中，（ ）等方面风险同时存在。",[435,437,439,441],{"key":20,"text":436,"correct":26},"经济、技术、公共关系",{"key":24,"text":438,"correct":22},"商务、经济、技术",{"key":28,"text":440,"correct":22},"政治、技术、公共关系",{"key":31,"text":442,"correct":22},"政治、经济、公共关系",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},1148888,"合同风险的管理与防范措施之一是风险的分散和转移，以下选项中属于风险的分散和转移措施的是（ ）。",[447,449,451,453],{"key":20,"text":448,"correct":26},"保险",{"key":24,"text":450,"correct":22},"索赔",{"key":28,"text":452,"correct":22},"减少投入",{"key":31,"text":454,"correct":22},"控制成本",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},1148889,"施工企业在向社会提供产品和服务的同时，就是要获得（ ）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"最好的安全",{"key":24,"text":462,"correct":26},"最大的经济效益",{"key":28,"text":464,"correct":22},"最佳的质量",{"key":31,"text":466,"correct":22},"最美的社会效益",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},1148890,"施工项目管理的最终目标是建成质量高、工期短、安全的、成本低的工程产品，所以（ ）是项目管理的核心内容。",[471,473,475,477],{"key":20,"text":472,"correct":22},"质量管理",{"key":24,"text":474,"correct":22},"工期管理",{"key":28,"text":476,"correct":22},"安全管理",{"key":31,"text":478,"correct":26},"成本管理",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":31,"analysis":33},1148891,"施工成本管理必须依赖于高效的组织机构，不符合该组织机构要求的是（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"分层统一",{"key":24,"text":486,"correct":22},"高效精干",{"key":28,"text":488,"correct":22},"适应变化",{"key":31,"text":490,"correct":26},"一人多岗",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},1148892,"项目成本管理要依靠施工项目中的各个环节上的管理人员，应树立强烈的（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":26},"成本意识",{"key":24,"text":498,"correct":22},"管理意识",{"key":28,"text":500,"correct":22},"考核意识",{"key":31,"text":502,"correct":22},"创新意识",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":20,"analysis":33},1148893,"国内外有许多施工成本管理方法，选用施工成本管理方法应遵循的原则之一是（ ）。",[507,509,511,513],{"key":20,"text":508,"correct":26},"坚定性原则",{"key":24,"text":510,"correct":22},"统一性原则",{"key":28,"text":512,"correct":22},"适应性原则",{"key":31,"text":514,"correct":22},"基础性原则",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1148894,"施工项目部建立施工成本（ ），是实现有效的全过程成本管理的保证和基础。",[519,521,523,525],{"key":20,"text":520,"correct":22},"管理制度",{"key":24,"text":522,"correct":26},"责任制度",{"key":28,"text":524,"correct":22},"考核制度",{"key":31,"text":526,"correct":22},"激励机制",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":31,"analysis":33},1148895,"施工成本目标控制主要依据之一的（ ）提供了施工成本实际支付情况，以便通过实际情况与施工成本计划相比较，找出二者之间的差别，分析偏差产生的原因，从而采取措施加以改进。",[531,533,535,537],{"key":20,"text":532,"correct":22},"成本分析",{"key":24,"text":534,"correct":22},"成本核算",{"key":28,"text":536,"correct":22},"成本计划",{"key":31,"text":538,"correct":26},"进度报告",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":20,"analysis":33},1148896,"项目施工成本目标控制是项目部经理接受（ ）委托履约的重要指标之一。",[543,545,547,549],{"key":20,"text":544,"correct":26},"企业法人",{"key":24,"text":546,"correct":22},"业主本人",{"key":28,"text":548,"correct":22},"企业领导",{"key":31,"text":347,"correct":22},{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},1148897,"施工成本目标控制主要依据之一的（ ）是根据项目施工的具体情况制定的施工成本控制方案，是施工成本控制的指导文件。",[554,556,557,558],{"key":20,"text":555,"correct":22},"成本目标",{"key":24,"text":534,"correct":22},{"key":28,"text":536,"correct":26},{"key":31,"text":532,"correct":22},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},1148898,"关于施工成本目标控制的目标说法不正确的是（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"项目施工成本控制是项目部项目经理接受企业法人委托履约的重要指标之一",{"key":24,"text":566,"correct":22},"施工项目成本控制目的在于控制预算的变化降低项目成本、提高经济效益、增加工程预算收入，为项目部负责人的管理提供与成本有关的用于决策的信息",{"key":28,"text":568,"correct":22},"项目经理应对项目实施过程中发生的各种费用支出，采取一系列措施来进行严格的监督和控制",{"key":31,"text":570,"correct":26},"项目经理不需要对项目实施过程中发生的各种费用支出进行管理",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},1148899,"下列文件不属于项目成本控制依据的是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"工程承包合同",{"key":24,"text":578,"correct":26},"施工设计图纸",{"key":28,"text":580,"correct":22},"工程进度报告",{"key":31,"text":582,"correct":22},"工程变更",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},1148900,"对成本控制、成本分析和成本考核、降低成本、提高效益有重要的积极意义的核算，称为（ ）。",[587,589,590,592],{"key":20,"text":588,"correct":22},"会计核算",{"key":24,"text":534,"correct":26},{"key":28,"text":591,"correct":22},"统计核算",{"key":31,"text":593,"correct":22},"业务核算",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1148901,"施工项目成本核算和成本分析是企业、项目部成本管理控制的基础，（ ）是成本计划是否得到实现的检验，它对成本控制、成本分析和成本考核、降低成本、提高效益有重要的积极意义。",[598,599,600,601],{"key":20,"text":555,"correct":22},{"key":24,"text":534,"correct":26},{"key":28,"text":536,"correct":22},{"key":31,"text":532,"correct":22},[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]