[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,18,50,2019,[13,34,43,55,67,79,91,103,115,127,139,151,163,175,187,196,208,220,232,244,256,268,280,292,304,316,328,340,352,364,376,388,400,412,423,435,447,459,471,483,495,507,518,529,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1148802,1,"单选题","干线综合管廊用于容纳城市主干工程管线，采用（）方式建设的综合管廊。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","独立分舱",true,{"key":24,"text":25,"correct":26},"B","同舱",false,{"key":28,"text":29,"correct":26},"C","双舱",{"key":31,"text":32,"correct":26},"D","浅埋沟道","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1148803,"缆线综合管廊采用（）方式建设。",[38,39,41,42],{"key":20,"text":21,"correct":26},{"key":24,"text":40,"correct":26},"单舱",{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":45,"options":46,"answer":28,"analysis":33},1148804,"支线综合管廊用于容纳（）工程管线。",[47,49,51,53],{"key":20,"text":48,"correct":26},"主干",{"key":24,"text":50,"correct":26},"次干",{"key":28,"text":52,"correct":22},"城市配给",{"key":31,"text":54,"correct":26},"支线",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":20,"analysis":33},1148805,"综合管廊工程建设应以综合管廊（）为依据，遵循“规划先行、适度超前、因地制宜、统筹兼顾”的原则（）。",[59,61,63,65],{"key":20,"text":60,"correct":22},"工程规划",{"key":24,"text":62,"correct":26},"设计图纸",{"key":28,"text":64,"correct":26},"管线运营",{"key":31,"text":66,"correct":26},"建设用地",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":20,"analysis":33},1148806,"根据《城市综合管廊工程技术规范》GB-50838-2015要去，综合管廊的结构设计使用年限为（）年，结构安全等级为（）级。",[71,73,75,77],{"key":20,"text":72,"correct":22},"100，一",{"key":24,"text":74,"correct":26},"10，一",{"key":28,"text":76,"correct":26},"70，一",{"key":31,"text":78,"correct":26},"50，二",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},1148807,"综合管廊模板施工前，应根据（）、施工工艺、设备和材料供应条件进行模板及支架设计。",[83,85,87,89],{"key":20,"text":84,"correct":26},"规划",{"key":24,"text":86,"correct":26},"业主要求",{"key":28,"text":88,"correct":26},"合同规定",{"key":31,"text":90,"correct":22},"结构形式",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":20,"analysis":33},1148808,"综合管廊建成后，应由（）进行日常管理。",[95,97,99,101],{"key":20,"text":96,"correct":22},"专业单位",{"key":24,"text":98,"correct":26},"建设单位",{"key":28,"text":100,"correct":26},"管线单位",{"key":31,"text":102,"correct":26},"施工单位",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1148809,"综合管廊建设期间的档案资料应由（）负责收集、整理、归档。维护期间，应由综合管廊（）负责收集、整理、归档。",[107,109,111,113],{"key":20,"text":108,"correct":22},"建设单位，日常管理单位",{"key":24,"text":110,"correct":26},"施工单位，建设单位",{"key":28,"text":112,"correct":26},"建设单位，管线单位",{"key":31,"text":114,"correct":26},"建设单位，建设单位",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1148810,"综合管廊内给水排水管道的维护管理应符合现行行业标准有关规定。利用综合管廊结构本体的雨水渠，每年非雨季清理疏通不应少于（）次。",[119,121,123,125],{"key":20,"text":120,"correct":26},"1",{"key":24,"text":122,"correct":22},"2",{"key":28,"text":124,"correct":26},"3",{"key":31,"text":126,"correct":26},"4",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},1148811,"生活垃圾填埋工程中，泥质防渗层施工技术的核心是()施工技术。",[131,133,135,137],{"key":20,"text":132,"correct":26},"选择最佳配合比",{"key":24,"text":134,"correct":26},"拌合均匀",{"key":28,"text":136,"correct":26},"控制含水量及压实度",{"key":31,"text":138,"correct":22},"掺加膨润土的拌合土层",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1148812,"生活垃圾填埋场填埋区防渗系统结构层,自上而下材料排序,正确的是( )。",[143,145,147,149],{"key":20,"text":144,"correct":26},"土工布、GCL垫、HDPE膜",{"key":24,"text":146,"correct":22},"土工布、HDPE膜、GCL垫",{"key":28,"text":148,"correct":26},"HDPE膜、土工布、GCL",{"key":31,"text":150,"correct":26},"HDPE膜、GCL垫、土工布",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":33},1148813,"垃圾填埋场进行泥质防水层施工，质量检验项目包括渗水试验和()检测。",[155,157,159,161],{"key":20,"text":156,"correct":26},"平整度",{"key":24,"text":158,"correct":26},"厚度",{"key":28,"text":160,"correct":22},"压实度",{"key":31,"text":162,"correct":26},"坡度",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":28,"analysis":33},1148814,"土工合成材料膨润土垫(GCL)中的膨润土夹封在()，主要用于密封和防渗。",[167,169,171,173],{"key":20,"text":168,"correct":26},"土工合成材料之下",{"key":24,"text":170,"correct":26},"土工合成材料之上",{"key":28,"text":172,"correct":22},"两层土工合成材料之间",{"key":31,"text":174,"correct":26},"土工合成材料上下",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1148815,"土工合成材料膨润土垫(GCL)的施工，在坡面与地面拐角处防水垫应设置()",[179,181,183,185],{"key":20,"text":180,"correct":22},"附加层",{"key":24,"text":182,"correct":26},"防水层",{"key":28,"text":184,"correct":26},"垫层",{"key":31,"text":186,"correct":26},"强化层",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1148816,"泥质防水层施工，应在操作过程中确保掺加膨润土数量准确，拌合均匀，机拌不能少于()遍，含水量最大偏差不宜超过2%，振动压路机碾压控制在4～6遍，碾压密实。",[191,192,193,194],{"key":20,"text":122,"correct":22},{"key":24,"text":124,"correct":26},{"key":28,"text":126,"correct":26},{"key":31,"text":195,"correct":26},"5",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":20,"analysis":33},1148817,"HDPE膜做防渗层施工质量的关键是（）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"HDPE膜的自身质量及焊接质量",{"key":24,"text":203,"correct":26},"做好施工技术交底",{"key":28,"text":205,"correct":26},"保证施工机具的完好率",{"key":31,"text":207,"correct":26},"保证施工人员的数量",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":31,"analysis":33},1148818,"聚乙烯（HDP E）膜防渗层施工，采用双缝热熔焊接，焊接前应去除灰尘、（）。",[212,214,216,218],{"key":20,"text":213,"correct":26},"水分",{"key":24,"text":215,"correct":26},"裱膜",{"key":28,"text":217,"correct":26},"焊条",{"key":31,"text":219,"correct":22},"污物",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":31,"analysis":33},1148819,"在北方地区HDPE膜不应在（）期施工。",[224,226,228,230],{"key":20,"text":225,"correct":26},"春",{"key":24,"text":227,"correct":26},"夏",{"key":28,"text":229,"correct":26},"秋",{"key":31,"text":231,"correct":22},"冬",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},1148820,"HDPE膜铺设规划合理，边坡上的接缝须与坡面的坡向平行，场底横向接缝距坡脚线距离应（）。",[236,238,240,242],{"key":20,"text":237,"correct":26},"大于1.0m",{"key":24,"text":239,"correct":26},"小于1.5m",{"key":28,"text":241,"correct":26},"小于2.5m",{"key":31,"text":243,"correct":22},"大于1.5m",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":24,"analysis":33},1148821,"生活垃圾填埋场应设在当地()季主导风向的()风向。",[248,250,252,254],{"key":20,"text":249,"correct":26},"春；上",{"key":24,"text":251,"correct":22},"夏；下",{"key":28,"text":253,"correct":26},"秋；上",{"key":31,"text":255,"correct":26},"冬；下",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},1148822,"以下选项中关于泥质防水层施工程序正确的是()。",[260,262,264,266],{"key":20,"text":261,"correct":26},"验收基础→通过试验确定配比→选择土源→拌合、摊铺、压实→检验",{"key":24,"text":263,"correct":22},"验收基础→选择土源→通过试验确定配比→拌合、摊铺、压实→检验",{"key":28,"text":265,"correct":26},"选择土源→通过试验确定配比→拌合、摊铺、压实→验收基础一检验",{"key":31,"text":267,"correct":26},"通过试验确定配比→拌合、摊铺、压实→选择土源→验收基础→检验",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},1148823,"下列关于渗沥液收集导排系统施工控制要点中说法有误的是()。",[272,274,276,278],{"key":20,"text":273,"correct":26},"填筑导排层卵石时，汽车行驶路线采用环形前进，间隔5m堆料",{"key":24,"text":275,"correct":26},"导排层所用卵石CaC03含量必须小于10%",{"key":28,"text":277,"correct":22},"HDPE管的布置宜呈直线，其转弯角度应小于或等于30°",{"key":31,"text":279,"correct":26},"导排管热熔对接连接前，应校直两对应的连接件，使其在同一轴线上，错边不宜大于壁厚的10%",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":28,"analysis":33},1148824,"不能进行角度测量的仪器是()。",[284,286,288,290],{"key":20,"text":285,"correct":26},"全站仪",{"key":24,"text":287,"correct":26},"激光准直仪",{"key":28,"text":289,"correct":22},"光学水准仪",{"key":31,"text":291,"correct":26},"GPS",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},1148825,"中桩、中心桩等控制桩的恢复与校测应按施工需要及时进行，发现桩位偏移或丢失应及时()。",[296,298,300,302],{"key":20,"text":297,"correct":26},"纠正、纠偏",{"key":24,"text":299,"correct":26},"纠错、补测",{"key":28,"text":301,"correct":22},"补测、钉桩",{"key":31,"text":303,"correct":26},"定位、钉桩",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":28,"analysis":33},1148826,"关于施工测量的说法，错误的是()。",[308,310,312,314],{"key":20,"text":309,"correct":26},"规划批复和设计文件是施工测量的依据",{"key":24,"text":311,"correct":26},"施工测量贯穿于工程实施的全过程",{"key":28,"text":313,"correct":22},"施工测量应遵循“由局部到整体。先细部分后控制”的原则",{"key":31,"text":315,"correct":26},"综合行工程使用不同的设计文件时，应进行平面控制网联测",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},1148827,"施工测量作业人员应遵循()的原则，掌握工程测量的各种测量方法及相关标准，熟练使用测量器具正确作业，满足工程施工需要。",[320,322,324,326],{"key":20,"text":321,"correct":22},"由整体到局部，先控制后细部",{"key":24,"text":323,"correct":26},"由局部到整体，先细部后控制",{"key":28,"text":325,"correct":26},"由设计到实施，先测量后施工",{"key":31,"text":327,"correct":26},"由设计到实施，先施工后测量",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":28,"analysis":33},1148828,"对于J2精度的全站仪，如果上、下半测回角值之差绝对值不大于()″，认为观测合格。",[332,334,336,338],{"key":20,"text":333,"correct":26},"8",{"key":24,"text":335,"correct":26},"10",{"key":28,"text":337,"correct":22},"12",{"key":31,"text":339,"correct":26},"14",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1148829,"施工前应测桥梁中线和各墩、台的（）定位桩，作为施工控制依据。",[344,346,348,350],{"key":20,"text":345,"correct":22},"纵轴与横轴线",{"key":24,"text":347,"correct":26},"中心坐标",{"key":28,"text":349,"correct":26},"四角坐标",{"key":31,"text":351,"correct":26},"边线",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":28,"analysis":33},1148830,"矩形建（构）筑物应据其（）平面图进行施工各阶段放线。",[356,358,360,362],{"key":20,"text":357,"correct":26},"中心线",{"key":24,"text":359,"correct":26},"投影边线",{"key":28,"text":361,"correct":22},"轴线",{"key":31,"text":363,"correct":26},"外缘线",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},1148831,"当平面布置改变超过图上面积的()时，不宜在原施工图上修改和补充，应重新绘制竣工。",[368,370,372,374],{"key":20,"text":369,"correct":26},"1\u002F2",{"key":24,"text":371,"correct":22},"1\u002F3",{"key":28,"text":373,"correct":26},"1\u002F4",{"key":31,"text":375,"correct":26},"1\u002F5",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1148832,"基坑工程施工前，应由（）委托具备相应资质的（）对基坑工程实施现场监控量测。（）应编制监控量测方案。监控量测方案应经建设、设计、监理等单位认可，必要时还需与市政道路、地下管线、人防等有关部门协商一致后方可实施。",[380,382,384,386],{"key":20,"text":381,"correct":22},"建设方、第三方、监控量测单位",{"key":24,"text":383,"correct":26},"第三方、建设方、监控量测单位",{"key":28,"text":385,"correct":26},"建设方、监控量测单位、第三方",{"key":31,"text":387,"correct":26},"施工单位、建设方、监控量测单位",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},1148833,"开挖深度超过（）m或开挖深度未超过（）m，但现场地质情况和周围环境复杂的基坑工程均应实施基坑工程监控测量。",[392,394,396,398],{"key":20,"text":393,"correct":22},"5,5",{"key":24,"text":395,"correct":26},"8,6",{"key":28,"text":397,"correct":26},"5,4",{"key":31,"text":399,"correct":26},"10,5",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},1148834,"施工过程中进行日常检查工作，（）的监控量测方案应进行专门论证。",[404,406,408,410],{"key":20,"text":405,"correct":26},"地质和环境条件很复杂的土方工程",{"key":24,"text":407,"correct":26},"有发生事故危险的基坑工程",{"key":28,"text":409,"correct":26},"采用新技术、新工艺、新材料的普通工程",{"key":31,"text":411,"correct":22},"采用新技术、新工艺、新材料的基坑工程",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":28,"analysis":33},1148835,"监控量测结束阶段，（）应向委托方提供以下资料，并按档案管理规定，组卷归档。",[416,417,419,421],{"key":20,"text":98,"correct":26},{"key":24,"text":418,"correct":26},"第三方单位",{"key":28,"text":420,"correct":22},"监控量测单位",{"key":31,"text":422,"correct":26},"监理单位",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},1148836,"招标文件主要内容不包括（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":26},"技术条款",{"key":24,"text":430,"correct":26},"评标标准",{"key":28,"text":432,"correct":26},"投标辅助材料",{"key":31,"text":434,"correct":22},"市场价格信息",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},1148837,"投标文件中商务部分不包括（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":26},"联合体协议书",{"key":24,"text":442,"correct":22},"环境保护措施",{"key":28,"text":444,"correct":26},"资格审查资料",{"key":31,"text":446,"correct":26},"投标保证金",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":28,"analysis":33},1148838,"招标文件评审评分标准中关于风险管理体系及措施的评分属于（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":26},"履约能力",{"key":24,"text":454,"correct":26},"商务标",{"key":28,"text":456,"correct":22},"技术标",{"key":31,"text":458,"correct":26},"经济标",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},1148839,"投标人应当按照（ ）的要求编制投标文件。",[463,465,467,469],{"key":20,"text":464,"correct":26},"业主",{"key":24,"text":466,"correct":22},"招标文件",{"key":28,"text":468,"correct":26},"工程造价",{"key":31,"text":470,"correct":26},"合同文本",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1148840,"投标保证金一般不得超过投标估算价的（ ）",[475,477,479,481],{"key":20,"text":476,"correct":26},"4%",{"key":24,"text":478,"correct":22},"2%",{"key":28,"text":480,"correct":26},"5%",{"key":31,"text":482,"correct":26},"10%",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},1148841,"下列不符合公开招标条件的是（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"资金正在筹措",{"key":24,"text":490,"correct":26},"招标人依法成立",{"key":28,"text":492,"correct":26},"初步设计及概算已批准",{"key":31,"text":494,"correct":26},"招标范围、方式、组织已批准",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},1148842,"招标与评标程序中，表述错误的为（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":26},"评标专家应在评标专家库采用计算机随机抽取并采取严格的保密措施和回避制度",{"key":24,"text":502,"correct":26},"对于技术较为复杂工程项目的技术标书，应当暗标制作、暗标评审",{"key":28,"text":504,"correct":22},"应采用综合评估的方法，一般情况下技术部分的分值权重可高于商务部分的分值权重",{"key":31,"text":506,"correct":26},"所有的评标标准的方法必须在招标文件中详细载明，以最大程度地削减评标专家的自由裁量权",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},1148843,"招标人应当自收到评标报告后之日起（ ）d内公示中标候选人，公示期不得少于（ ）d。",[511,512,514,516],{"key":20,"text":393,"correct":26},{"key":24,"text":513,"correct":22},"3,3",{"key":28,"text":515,"correct":26},"5,3",{"key":31,"text":517,"correct":26},"3,5",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1148844,"中标通知书发出（ ）d内双方签订合同文件。",[522,524,526,528],{"key":20,"text":523,"correct":22},"30",{"key":24,"text":525,"correct":26},"15",{"key":28,"text":527,"correct":26},"28",{"key":31,"text":339,"correct":26},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":28,"analysis":33},1148845,"实质性要求和条件是指招标文件中关于（ ）的主要条款。",[533,535,537,539],{"key":20,"text":534,"correct":26},"安全,环保及文明施工",{"key":24,"text":536,"correct":26},"工期,安全和合同",{"key":28,"text":538,"correct":22},"工期,质量及合同",{"key":31,"text":540,"correct":26},"质量,安全和环保",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},1148846,"定标中，如果出现前三名中标候选人均放弃其中标资格或未遵循招标文件要求被取消其中标资格，招标人（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"应重新组织招标",{"key":24,"text":548,"correct":26},"有权确定招标人",{"key":28,"text":550,"correct":26},"应确定第四名中标",{"key":31,"text":552,"correct":26},"应放弃招标",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1148847,"投标前应认真做好准备工作，下述表述错误的是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"投标人不能对招标文件要求进行修改，但可以提出保留意见",{"key":24,"text":560,"correct":26},"投标文件必须严格按照招标文件的规定编写",{"key":28,"text":562,"correct":26},"投标报价应按招标文件中要求的计价方法和各种因素计算",{"key":31,"text":564,"correct":26},"投入本项目的主要人员简历及所需证明材料（证件复制件）应满足招标文件的要求",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},1148848,"投标人应符合招标文件对投标人资格条件的规定，但不包括（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"企业性质",{"key":24,"text":572,"correct":26},"财务要求",{"key":28,"text":574,"correct":26},"资质要求",{"key":31,"text":576,"correct":26},"业绩要求",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":28,"analysis":33},1148849,"计算投标报价前应根据招标文件中的相关说明和施工图，（ ）工程量。",[581,583,585,587],{"key":20,"text":582,"correct":26},"计算",{"key":24,"text":584,"correct":26},"确认",{"key":28,"text":586,"correct":22},"核对",{"key":31,"text":588,"correct":26},"质疑",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":28,"analysis":33},1148850,"技术标书编制不包括（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":26},"主要施工方案",{"key":24,"text":596,"correct":26},"安全文明施工措施",{"key":28,"text":598,"correct":22},"公司组织机构",{"key":31,"text":600,"correct":26},"安全管理",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":31,"analysis":33},1148851,"投标人为提高投标文件的竞争性，可采取适当的投标技巧，这些技巧不包括（ ）。",[605,607,609,611],{"key":20,"text":606,"correct":26},"多方案报价法",{"key":24,"text":608,"correct":26},"突然降价法",{"key":28,"text":610,"correct":26},"许诺优惠条件",{"key":31,"text":612,"correct":22},"最低盈利法",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]