[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,16,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,366,378,390,402,414,426,438,450,462,474,486,498,510,518,527,535,543,554,566,578,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1148702,1,"单选题","排水构筑物满水试验测读水位的末读数与初读数的时间间隔应不小于（ ）h。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","48",false,{"key":24,"text":25,"correct":26},"B","24",true,{"key":28,"text":29,"correct":22},"C","12",{"key":31,"text":32,"correct":22},"D","72","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1148703,"水构筑物满水试验时，正确的注水方法是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"相邻两次注水时间间隔不少于48h",{"key":24,"text":41,"correct":22},"注水分四次进行，每次注水为设计水深的1\u002F4，水位上升速度每天不超过1m\u002Fd",{"key":28,"text":43,"correct":26},"注水分三次进行，每次注水为设计水深的1\u002F3，水位上升速度每天不超过2m\u002Fd",{"key":31,"text":45,"correct":22},"注水分三次进行，每次注水为设计水深的1\u002F3，水位上升速度每天不超过1m\u002Fd",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1148704,"沉井下沉施工时，挖土应分层、均匀、对称进行；对于有底梁或支撑梁沉井，其相邻格仓高差不宜超过（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"0.3m",{"key":24,"text":53,"correct":22},"0.2m",{"key":28,"text":55,"correct":22},"0.4m",{"key":31,"text":57,"correct":26},"0.5m",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1148705,"沉井下沉施工终沉时，每小时测一次，严格控制超沉，沉井封底前自沉速率应小于（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"10mm\u002F8h",{"key":24,"text":65,"correct":22},"20mm\u002F8h",{"key":28,"text":67,"correct":22},"15mm\u002F8h",{"key":31,"text":69,"correct":22},"25mm\u002F8h",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1148706,"全断面整体现浇的钢筋混凝土无压管渠处于地下水位以下时，除设计要求外，管渠的混凝土强度等级、抗渗等级检验合格，可采用（ ）测渗水量。",[74,76,78,80],{"key":20,"text":75,"correct":22},"闭水试验",{"key":24,"text":77,"correct":22},"闭气试验",{"key":28,"text":79,"correct":22},"外观检查",{"key":31,"text":81,"correct":26},"内渗法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1148707,"给水排水管道中的无压管道严密性试验中，不开槽施工的内径大于或等于（ ）mm钢筋混凝土结构管道，设计无要求且地下水位高于管道顶部时，可采用内渗法测渗水量。",[86,88,90,92],{"key":20,"text":87,"correct":22},"500",{"key":24,"text":89,"correct":22},"1000",{"key":28,"text":91,"correct":26},"1500",{"key":31,"text":93,"correct":22},"800",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1148708,"采用机械挖槽时，沟槽分层的深度应按（ ）确定。",[98,100,102,104],{"key":20,"text":99,"correct":22},"机械数量",{"key":24,"text":101,"correct":22},"挖斗容量",{"key":28,"text":103,"correct":22},"降水类型",{"key":31,"text":105,"correct":26},"机械性能",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1148709,"给水排水管道采用人工开挖沟槽时，沟槽的槽深超过（ ）m时应分层开挖。",[110,112,114,116],{"key":20,"text":111,"correct":22},"1",{"key":24,"text":113,"correct":22},"2",{"key":28,"text":115,"correct":26},"3",{"key":31,"text":117,"correct":22},"4",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1148710,"排水不良造成地基土扰动时，扰动深度在100mm以内，宜填（ ）处理。",[122,124,126,128],{"key":20,"text":123,"correct":22},"卵石或砂砾",{"key":24,"text":125,"correct":22},"卵石或块石",{"key":28,"text":127,"correct":22},"级配砾石或级配碎石",{"key":31,"text":129,"correct":26},"天然级配砂石或砂砾",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1148711,"沟槽开挖规定，槽底原状地基土不得扰动，机械开挖时槽底预留（ ）土层由人工开挖至设计高程，整平。",[134,136,138,140],{"key":20,"text":135,"correct":22},"100～200mm",{"key":24,"text":137,"correct":22},"50～100mm",{"key":28,"text":139,"correct":26},"200～300mm",{"key":31,"text":141,"correct":22},"100～150mm",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1148712,"电熔连接、热熔连接、机械连接宜在环境温度（ ）时进行。",[146,148,150,152],{"key":20,"text":147,"correct":26},"较低或接近最低",{"key":24,"text":149,"correct":22},"较高或接近最高",{"key":28,"text":151,"correct":22},"≥10℃",{"key":31,"text":153,"correct":22},"温度不限",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1148713,"每种牌（型）号的环氧粉末涂料、胶粘剂以及聚乙烯专用料，在使用前均应（ ），性能检测结果达到相关标准规定要求的材料方可使用",[158,160,162,164],{"key":20,"text":159,"correct":26},"通过国家计量认证的检验机构进行检测",{"key":24,"text":161,"correct":22},"由施工单位进行检测",{"key":28,"text":163,"correct":22},"由生产单位进行检测",{"key":31,"text":165,"correct":22},"由供应商进行检测",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1148714,"盾构法施工用于穿越地面障碍的给排水主干管道工程，直径一般（ ）以上。",[170,172,174,176],{"key":20,"text":171,"correct":26},"3000mm",{"key":24,"text":173,"correct":22},"5000mm",{"key":28,"text":175,"correct":22},"2000mm",{"key":31,"text":177,"correct":22},"1000mm",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1148715,"采用敞口式（手掘式）顶管机时，应将地下水位降至管底以下不小于（ ）处，并应采取措施，防止其他水源进入顶管的管道。",[182,184,185,186],{"key":20,"text":183,"correct":22},"1.0m",{"key":24,"text":51,"correct":22},{"key":28,"text":57,"correct":26},{"key":31,"text":53,"correct":22},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},1148716,"不开槽管道施工，当周围环境要求控制地层变形或无降水条件时，宜采用（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"浅埋暗挖",{"key":24,"text":194,"correct":22},"定向钻",{"key":28,"text":196,"correct":22},"夯管",{"key":31,"text":198,"correct":26},"封闭式的土压平衡或泥水平衡顶管",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},1148717,"管道做功能性试验，下列说法错误的是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"水压试验包括预实验和主试验阶段",{"key":24,"text":206,"correct":22},"管道严密性试验，宜按设计要求确定选择闭水试验或闭气试验",{"key":28,"text":208,"correct":22},"向管道注水应从下游缓慢注入",{"key":31,"text":210,"correct":26},"给水管道水压试验合格后，即可通水投产",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1148718,"闭水试验时，试验段的划分应符合的要求中不正确的是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"无压力管道的闭水试验宜带井试验",{"key":24,"text":218,"correct":26},"当管道采用两种（或两种以上）管材时，不必按管材分别进行试验",{"key":28,"text":220,"correct":22},"无压力管道的闭水试验一次试验不可超过5个连续井段",{"key":31,"text":222,"correct":22},"压力管道水压试验的管段长度不宜大于1.0km",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1148719,"给排水管道功能性试验包括（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"压力管道的水压试验和无压管道的严密性试验",{"key":24,"text":230,"correct":22},"强度试验和抗渗试验",{"key":28,"text":232,"correct":22},"满水试验和气密性试验",{"key":31,"text":234,"correct":22},"满水试验和严密性试验",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},1148720,"采用混凝土砌块砌筑拱形管渠或管渠的弯道时，宜采用楔形或扇形砌块；当砌体垂直灰缝宽度大于30mm时，应采用细石混凝土灌实，混凝土强度等级不应小于（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"C25",{"key":24,"text":242,"correct":22},"C15",{"key":28,"text":244,"correct":26},"C20",{"key":31,"text":246,"correct":22},"C30",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},1148721,"砌筑沟道施工技术要求，采用混凝土砌块砌筑拱形管渠或管渠的弯道时，宜采用（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":26},"楔形砌块、扇形砌块",{"key":24,"text":254,"correct":22},"六角形砌块、楔形砌块",{"key":28,"text":256,"correct":22},"扇形砌块、箱形砌块",{"key":31,"text":258,"correct":22},"箱形砌块、楔形砌块",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1148722,"不同种类、不同材质、不同结构管道抢修方法不尽相同。如钢管一般可用（ ）的方法修复。",[263,265,267,269],{"key":20,"text":264,"correct":26},"补焊或盖压补焊",{"key":24,"text":266,"correct":22},"补麻、补灰",{"key":28,"text":268,"correct":22},"两合揣袖",{"key":31,"text":270,"correct":22},"转换接口连接",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},1148723,"采用非开挖方式维护与修复城市管网，当进行局部修补时采用的方法主要有密封法、补丁法、铰接管法、局部软衬法、灌浆法和（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":26},"机器人法",{"key":24,"text":278,"correct":22},"焊接法",{"key":28,"text":280,"correct":22},"补接法",{"key":31,"text":282,"correct":22},"包封法",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},1148724,"下列方法中不属于城市给排水管道全断面修复的方法是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"内衬法",{"key":24,"text":290,"correct":26},"胀管法",{"key":28,"text":292,"correct":22},"缠绕法",{"key":31,"text":294,"correct":22},"喷涂法",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},1148725,"采用气动或液动爆管法对管道进行更新时，新管的直径可以与旧管的直径相同或更大，视地层条件的不同，最大可比旧管大（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"10%",{"key":24,"text":302,"correct":26},"50%",{"key":28,"text":304,"correct":22},"100%",{"key":31,"text":306,"correct":22},"30%",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},1148726,"在相同条件下，沟槽开挖时下列哪种土的最陡坡度比值最小（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"中密的碎石类土",{"key":24,"text":314,"correct":26},"中密的砂土",{"key":28,"text":316,"correct":22},"粉质黏土",{"key":31,"text":318,"correct":22},"老黄土",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1148727,"热力管道的二级管网是指（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"从热源至热力站的供回水管网",{"key":24,"text":326,"correct":26},"从热力站至热用户的供热管道",{"key":28,"text":328,"correct":22},"从热源至热用户的供水管网",{"key":31,"text":330,"correct":22},"从热用户至热源的回水管网",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},1148728,"一般来说热力一级管网是指（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"从热力站至用户的供水管网",{"key":24,"text":338,"correct":22},"从热力站至用户的供回水管网",{"key":28,"text":340,"correct":22},"从热源至热力站的供水管网",{"key":31,"text":342,"correct":26},"从热源至热力站的供热管道",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},1148729,"属于特种设备的压力管道元件，制造厂家还应有相应的特种设备制造资质，其质量证明文件、验收文件还应符合（ ）的有关规定。",[347,349,351,353],{"key":20,"text":348,"correct":22},"建设工程主管部门",{"key":24,"text":350,"correct":26},"特种设备安全监察机构",{"key":28,"text":352,"correct":22},"工程质量管理条例",{"key":31,"text":354,"correct":22},"质量监督站",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":28,"analysis":33},1148730,"在热力管道安装施工中，对受监察的承压元件，其质量证明文件和制造资质还应符合（ ）的有关规定。",[359,361,363,364],{"key":20,"text":360,"correct":22},"建设主管部门",{"key":24,"text":362,"correct":22},"设计部门",{"key":28,"text":350,"correct":26},{"key":31,"text":365,"correct":22},"元件制造主管部门",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},1148731,"为保证焊接施工质量，关于安装单位应具备的资源条件，下列说法错误的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"有负责焊接工艺的焊接技术人员",{"key":24,"text":373,"correct":22},"有符合焊接工艺要求的焊接设备且性能应该稳定可靠",{"key":28,"text":375,"correct":26},"有覆盖所有钢材焊接的工艺方案",{"key":31,"text":377,"correct":22},"有保证焊接工程质量达到标准的措施",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1148732,"钢管坡口焊接时，焊接层数不得少于（ ）层，每层焊完后，清除熔渣、飞溅物，同一部位焊缝的返修不得超过（ ）次。",[382,384,386,388],{"key":20,"text":383,"correct":26},"2.2",{"key":24,"text":385,"correct":22},"3.2",{"key":28,"text":387,"correct":22},"2.3",{"key":31,"text":389,"correct":22},"3.3",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":28,"analysis":33},1148733,"热力管道对接管口时，应检查管道（ ），在距接口中心200mm处测量，允许偏差0~1mm。",[394,396,398,400],{"key":20,"text":395,"correct":22},"偏差",{"key":24,"text":397,"correct":22},"焊接口",{"key":28,"text":399,"correct":26},"平直度",{"key":31,"text":401,"correct":22},"质量",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},1148734,"下列关于热力管道安装无损检测要求说法错误的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"管线折点处现场焊接的焊缝，应进行100%的无损探伤检验",{"key":24,"text":409,"correct":22},"钢管与设备、管件连接处的焊缝应进行100%无损探伤检验",{"key":28,"text":411,"correct":26},"焊缝返修前应进行表面质量及100%的无损探伤检验",{"key":31,"text":413,"correct":22},"现场制作的各种管件，数量按100%进行，其合格标准不得低于管道无损检验标准",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},1148735,"下列设置中，通常安装在架空管道和需要进行蒸汽吹扫的管道上，用于消除管段的胀缩应力的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":26},"补偿器",{"key":24,"text":421,"correct":22},"阀门",{"key":28,"text":423,"correct":22},"凝水缸",{"key":31,"text":425,"correct":22},"放散管",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},1148736,"在热力管道的热伸长计算中，热伸长计算公式ΔL=αLΔt中的α，其物理意义是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"管道膨胀系数",{"key":24,"text":433,"correct":22},"管道体膨胀系数",{"key":28,"text":435,"correct":22},"管道面膨胀系数",{"key":31,"text":437,"correct":26},"管材线膨胀系数",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},1148737,"在靠近补偿器的两端，至少应各设有一个（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"滚动支架",{"key":24,"text":445,"correct":26},"导向支架",{"key":28,"text":447,"correct":22},"滑动支架",{"key":31,"text":449,"correct":22},"悬吊支架",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},1148738,"当安装时的环境温度低于补偿零点（设计的最高温度与最低温度差值的1\u002F2）时，应对补偿器进行（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"预热",{"key":24,"text":457,"correct":22},"热处理",{"key":28,"text":459,"correct":26},"预拉伸",{"key":31,"text":461,"correct":22},"更换",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1148739,"现场制作的人工补偿器须优先采用（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"普通低合金无缝钢管",{"key":24,"text":469,"correct":26},"优质碳素钢无缝钢管",{"key":28,"text":471,"correct":22},"普通碳素钢管",{"key":31,"text":473,"correct":22},"优质合金钢管",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},1148740,"通常方形补偿器应（ ）安装，（ ）臂应与管线坡度及坡向相同，（ ）臂应呈水平。",[478,480,482,484],{"key":20,"text":479,"correct":26},"水平；平行；垂直",{"key":24,"text":481,"correct":22},"竖直；平行；垂直",{"key":28,"text":483,"correct":22},"水平；垂直；平行",{"key":31,"text":485,"correct":22},"竖直；垂直；平行",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},1148741,"填料式补偿器芯管的外露长度应大于设计规定的（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"滑移长度",{"key":24,"text":493,"correct":22},"安装长度",{"key":28,"text":495,"correct":26},"变形量",{"key":31,"text":497,"correct":22},"容许值",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":28,"analysis":33},1148742,"密封性较差的阀门是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"闸阀",{"key":24,"text":505,"correct":22},"柱塞阀",{"key":28,"text":507,"correct":26},"截止阀",{"key":31,"text":509,"correct":22},"球阀",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},1148743,"主要用于密封要求较高的地方，使用在水、蒸汽等介质上，密封性好，结构紧凑，启门灵活，寿命长，维修方便的阀门是（ ）。",[514,515,516,517],{"key":20,"text":503,"correct":22},{"key":24,"text":505,"correct":26},{"key":28,"text":507,"correct":22},{"key":31,"text":509,"correct":22},{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},1148744,"主要用于低压介质管路或设备上全开全闭操作，体积小，密封可靠，调节性能好的阀门是（ ）。",[522,523,525,526],{"key":20,"text":503,"correct":22},{"key":24,"text":524,"correct":26},"蝶阀",{"key":28,"text":507,"correct":22},{"key":31,"text":509,"correct":22},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":31,"analysis":33},1148745,"适用于低温、高压及黏度较大的介质，以及要求开关迅速的管道部位的阀是（ ）。",[531,532,533,534],{"key":20,"text":524,"correct":22},{"key":24,"text":505,"correct":22},{"key":28,"text":507,"correct":22},{"key":31,"text":509,"correct":26},{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},1148746,"（ ）主要用于管路的快速切断，特点是流体阻力小,启闭迅速,,结构简单,密封性能良好",[539,540,541,542],{"key":20,"text":503,"correct":22},{"key":24,"text":524,"correct":22},{"key":28,"text":507,"correct":22},{"key":31,"text":509,"correct":26},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},1148747,"根据《城市热力网设计规范》的规定，当热水热力站站房长度大于（ ）m应设置两个出口。",[547,549,551,553],{"key":20,"text":548,"correct":22},"5",{"key":24,"text":550,"correct":22},"6",{"key":28,"text":552,"correct":22},"10",{"key":31,"text":29,"correct":26},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},1148748,"供热站是供热管网的重要附属设施，是供热网路与热用户的连接场所，当热水热力站站房长度大于12m时应至少设（ ）出口。",[558,560,562,564],{"key":20,"text":559,"correct":26},"两个",{"key":24,"text":561,"correct":22},"一个",{"key":28,"text":563,"correct":22},"三个",{"key":31,"text":565,"correct":22},"四个",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":28,"analysis":33},1148749,"供热站内泵的试运转应在其各附属系统单独试运转正常后进行，且应在有介质情况下进行试运转，试运转的介质或代用介质均应符合设计的要求。泵在额定工况下连续试运转时间不应少于（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":22},"1h",{"key":24,"text":573,"correct":22},"3h",{"key":28,"text":575,"correct":26},"2h",{"key":31,"text":577,"correct":22},"4h",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},1148750,"供热管道强度试验在试验压力下稳压（ ）min无渗漏、无压力降后降至设计压力，稳压（ ）min检查无渗漏、无异常声响、无压力降为合格。",[582,584,586,588],{"key":20,"text":583,"correct":26},"10；30",{"key":24,"text":585,"correct":22},"15；60",{"key":28,"text":587,"correct":22},"10；60",{"key":31,"text":589,"correct":22},"15；30",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},1148751,"严密性试验压力为设计压力的（ ）倍且不小于（ ）MPa。",[594,596,598,600],{"key":20,"text":595,"correct":22},"1.5：0.6",{"key":24,"text":597,"correct":26},"1.25；0.6",{"key":28,"text":599,"correct":22},"1.5；0.5",{"key":31,"text":601,"correct":22},"1.25；0.5",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]