[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,15,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,487,499,511,523,535,547,559,571,583,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1148652,1,"单选题","在下列结构筑形式中，属于水处理构筑物常用结构的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","钢筋混凝土结构",true,{"key":24,"text":25,"correct":26},"B","砖砌结构",false,{"key":28,"text":29,"correct":26},"C","钢结构",{"key":31,"text":32,"correct":26},"D","土膜结构","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1148653,"大型矩形水池为避免裂缝渗漏，设计通常采用单元组合结构将水池分块（单元）浇筑。各块（单元）间留设后浇缝带，池体钢筋按设计要求一次绑扎好，缝带处不切断，待块（单元）养护（ ）后，再使其连成整体。",[38,40,42,44],{"key":20,"text":39,"correct":26},"21d",{"key":24,"text":41,"correct":26},"14d",{"key":28,"text":43,"correct":26},"28d",{"key":31,"text":45,"correct":22},"42d",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1148654,"关于厂站水处理构筑物的特点，说法有误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"构件多采用薄板或薄壳型结构，断面薄，配筋率高",{"key":24,"text":53,"correct":26},"较高抗渗性",{"key":28,"text":55,"correct":26},"较好整体性",{"key":31,"text":57,"correct":22},"高耐腐蚀性",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1148655,"污水处理构筑物中卵形消化池，通常采用（ ）施工。",[62,64,66,68],{"key":20,"text":63,"correct":22},"无粘结预应力筋、曲面异型大模板",{"key":24,"text":65,"correct":26},"有粘结预应力筋、曲面异型大模板",{"key":28,"text":67,"correct":26},"无粘结预应力筋、曲面异型小模板",{"key":31,"text":69,"correct":26},"有粘结预应力筋、普通组合大模板",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1148656,"关于厂站水处理工艺管线的特点，说法有误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"水流性能好",{"key":24,"text":77,"correct":22},"抗弯性能好",{"key":28,"text":79,"correct":26},"抗腐蚀性能高",{"key":31,"text":81,"correct":26},"抗地层变位性好",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1148657,"下列关于单元组合现浇混凝土工艺说法有误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"该工艺可有效防止池体出现裂缝渗漏",{"key":24,"text":89,"correct":26},"圆形水池单元间可采用止水带、胶泥嵌缝进行处理",{"key":28,"text":91,"correct":26},"该工艺适用于沉砂池、生物反应池、清水池等大型断面的池体",{"key":31,"text":93,"correct":22},"该工艺适用于圆形、矩形和卵形水池",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1148658,"下列关于装配式预应力钢筋混凝土结构说法有误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"该工艺适用于沉砂池、沉淀池、调节池等圆形水池结构",{"key":24,"text":101,"correct":26},"具有良好的抗裂性和不透水性",{"key":28,"text":103,"correct":26},"及时进行喷射水泥砂浆保护层施工",{"key":31,"text":105,"correct":22},"载满水试验前进行钢丝保护层施工",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1148659,"地下钢筋混凝土机房在地下水丰富、流沙的软土地层中施工时，适宜的施工方法是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"土钉支护",{"key":24,"text":113,"correct":22},"预制沉井法",{"key":28,"text":115,"correct":26},"排桩支护",{"key":31,"text":117,"correct":26},"在降水条件下开槽",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1148660,"给水工艺中使用混凝沉淀，主要去除水中的（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"胶体和悬浮杂质",{"key":24,"text":125,"correct":26},"胶体和溶解性物质",{"key":28,"text":127,"correct":26},"悬浮杂质和溶解性物质",{"key":31,"text":129,"correct":26},"有机物",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1148661,"饮用水消毒的目的是：（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"去除水中病毒和细菌，保证饮水卫生和生产用水安全",{"key":24,"text":137,"correct":26},"去除地下水中所含过量的铁和锰，使水质符合饮用水要求",{"key":28,"text":139,"correct":26},"去除水中胶体和细微杂质",{"key":31,"text":141,"correct":26},"清除水中的腐殖酸和富里酸，以免产生“三致”物质",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1148662,"水的软化主要是降低水中（ ）离子含量，使硬水软化。",[146,148,150,152],{"key":20,"text":147,"correct":26},"钠",{"key":24,"text":149,"correct":26},"铁锰",{"key":28,"text":151,"correct":26},"氟",{"key":31,"text":153,"correct":22},"钙镁",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1148663,"在以下所列的给水处理工艺中，（ ）是处理高浊度水的常用工艺流程。",[158,160,162,164],{"key":20,"text":159,"correct":22},"预沉→混凝→沉淀→过滤→消毒",{"key":24,"text":161,"correct":26},"混凝→接触过滤→消毒",{"key":28,"text":163,"correct":26},"混凝→沉淀→过滤→消毒",{"key":31,"text":165,"correct":26},"混凝→沉淀→消毒",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1148664,"地表水的常规处理工艺，当原水中的浊度很（ ）时，需要在混凝前设置预沉淀或沉砂池。",[170,172,174,176],{"key":20,"text":171,"correct":22},"高",{"key":24,"text":173,"correct":26},"低",{"key":28,"text":175,"correct":26},"适中",{"key":31,"text":177,"correct":26},"无法确定",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1148665,"用以去除水中粗大颗粒杂质的常用给水处理方法是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"过滤沉淀",{"key":24,"text":185,"correct":26},"调蓄沉淀",{"key":28,"text":187,"correct":22},"自然沉淀",{"key":31,"text":189,"correct":26},"混凝沉淀",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1148666,"对浊度小于3mg／L的河水，一般给水处理厂广泛采用的常规处理流程是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"原水—过滤—消毒",{"key":24,"text":197,"correct":26},"原水—接触过滤—消毒",{"key":28,"text":199,"correct":22},"原水—混凝、沉淀或澄清—过滤—消毒",{"key":31,"text":201,"correct":26},"原水—预沉淀—混凝、沉淀—过滤—消毒",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1148667,"城市污水一级处理主要针对水中悬浮物质，常采用（ ）的方法。",[206,208,210,212],{"key":20,"text":207,"correct":22},"物理",{"key":24,"text":209,"correct":26},"化学",{"key":28,"text":211,"correct":26},"生物",{"key":31,"text":213,"correct":26},"生化",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1148668,"城市污水的一级处理主要针对水中悬浮物质，常采用物理的方法，经过一级处理后，污水悬浮物去除可达40％左右，附着于悬浮物的有机物也可去除（ ）左右。",[218,220,222,224],{"key":20,"text":219,"correct":22},"0.3",{"key":24,"text":221,"correct":26},"0.4",{"key":28,"text":223,"correct":26},"0.5",{"key":31,"text":225,"correct":26},"0.6",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1148669,"城市污水处理按原理分为（ ）种处理方法，它们分别是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"三；物理处理法,化学处理法,活性污泥法",{"key":24,"text":233,"correct":26},"三；物理处理法,生物处理法,混凝沉淀法",{"key":28,"text":235,"correct":22},"三；物理处理法,生物处理法,化学处理法",{"key":31,"text":237,"correct":26},"二；化学处理法,生物处理法",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1148670,"污泥的处理法不包括：（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"浓缩",{"key":24,"text":245,"correct":26},"脱水及热处理",{"key":28,"text":247,"correct":26},"厌氧消化",{"key":31,"text":249,"correct":22},"离心分离",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1148671,"污水的物理处理法不包括：（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"重力分离法",{"key":24,"text":257,"correct":22},"电解法",{"key":28,"text":259,"correct":26},"筛滤截留法",{"key":31,"text":261,"correct":26},"离心分离法",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1148672,"下列方法中（ ）不属于污水二级处理方法。",[266,268,270,272],{"key":20,"text":267,"correct":26},"活性污泥法",{"key":24,"text":269,"correct":26},"生物膜法",{"key":28,"text":271,"correct":22},"混凝沉淀法",{"key":31,"text":273,"correct":26},"氧化沟",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1148673,"活性污泥处理系统的反应器是：（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"沉砂池",{"key":24,"text":281,"correct":26},"沉淀池",{"key":28,"text":283,"correct":22},"曝气池",{"key":31,"text":285,"correct":26},"滤池",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1148674,"氧化沟工艺一般不需要设置（ ）。",[290,292,294,295],{"key":20,"text":291,"correct":26},"二沉池",{"key":24,"text":293,"correct":22},"初沉池",{"key":28,"text":283,"correct":26},{"key":31,"text":296,"correct":26},"接触池",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1148675,"下列说法中不属于水厂试运行目的与内容的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":26},"对土建工程和设备安装进行全面、系统的质量检查与鉴定",{"key":24,"text":304,"correct":22},"修复土建工程和设备安装存在的缺陷",{"key":28,"text":306,"correct":26},"掌握设备的技术性能，制定运行必要的技术数据和操作规程",{"key":31,"text":308,"correct":26},"进行一场现场测试，以便进行技术经济分析",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1148676,"给水与污水处理厂试运行内容不包括（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"性能标定",{"key":24,"text":316,"correct":26},"单机试车",{"key":28,"text":318,"correct":26},"联机运行",{"key":31,"text":320,"correct":26},"空载运行",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},1148677,"给水与污水处理厂试运转单机试车，一般空车试运行不少于（ ）h。",[325,327,329,331],{"key":20,"text":326,"correct":26},"1",{"key":24,"text":328,"correct":22},"2",{"key":28,"text":330,"correct":26},"3",{"key":31,"text":332,"correct":26},"5",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1148678,"符合给水与污水处理厂连续试运行要求的是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":26},"连续试运行期间，开机、停机不少于2次",{"key":24,"text":340,"correct":22},"水处理和泥处理工艺系统试运行满足工艺要求",{"key":28,"text":342,"correct":26},"处理设备及泵房单机组累计运行达36h",{"key":31,"text":344,"correct":26},"处理设备及泵房机组联合试运行时间，一般不少于3h",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},1148679,"给水与污水处理厂试运转联机运行要求，全厂联机运行应不少于（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"48h",{"key":24,"text":352,"correct":26},"12h",{"key":28,"text":354,"correct":22},"24h",{"key":31,"text":356,"correct":26},"5h",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1148680,"现浇钢筋混凝土水池施工方案中包括模板及其支架设计，以下（ ）不是模板及其支架设计计算项目。",[361,363,365,367],{"key":20,"text":362,"correct":26},"稳定性",{"key":24,"text":364,"correct":22},"结构",{"key":28,"text":366,"correct":26},"刚度",{"key":31,"text":368,"correct":26},"承载能力",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},1148681,"水池施工中，橡胶止水带的接头方法是（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"热接",{"key":24,"text":376,"correct":26},"搭接",{"key":28,"text":378,"correct":26},"粘接",{"key":31,"text":380,"correct":26},"叠接",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},1148682,"下列关于无粘结预应力筋技术要求，说法错误的是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"预应力筋外包层材料，应采用聚乙烯或聚氯乙烯",{"key":24,"text":388,"correct":26},"预应力筋涂料层应采用专用防腐油脂",{"key":28,"text":390,"correct":26},"张拉段无粘结预应力筋长一般不超过50m，且锚固肋数量为双数，否则应进行分段张拉和锚固",{"key":31,"text":392,"correct":26},"必须采用Ⅰ类锚具，锚具规格应根据无粘结预应力筋的品种、张拉吨位以及工程使用情况选用",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},1148683,"止水带安装应牢固，位置准确，其中心线应与（ ）对正，带面不得有裂纹、孔洞等。不得在止水带上穿孔或用铁钉固定就位。",[397,399,401,403],{"key":20,"text":398,"correct":26},"钢筋空隙中线",{"key":24,"text":400,"correct":26},"先浇混凝土边线",{"key":28,"text":402,"correct":26},"后浇混凝土边线",{"key":31,"text":404,"correct":22},"变形缝中心线",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":28,"analysis":33},1148684,"预应力钢筋混凝土强度等级C35，抗渗等级P8，设计未作其他规定，按照施工要求，封锚混凝土强度等级不得低于（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":26},"C30",{"key":24,"text":412,"correct":26},"C35",{"key":28,"text":414,"correct":22},"C40",{"key":31,"text":416,"correct":26},"C45",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},1148685,"装配式预应力混凝土水池吊装中，当预制构件平面与吊绳的交角小于（ ）时，应对构件进行强度验算。",[421,423,425,427],{"key":20,"text":422,"correct":22},"45°",{"key":24,"text":424,"correct":26},"50°",{"key":28,"text":426,"correct":26},"55°",{"key":31,"text":428,"correct":26},"60°",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},1148686,"装配式预应力混凝土水池的吊装方案不包括（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":26},"工程概况",{"key":24,"text":436,"correct":26},"主要施工措施",{"key":28,"text":438,"correct":26},"质量安全保证措施",{"key":31,"text":440,"correct":22},"交通方案",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":31,"analysis":33},1148687,"整体现浇混凝土悬臂构件跨度大于2m时，拆模时所需混凝土强度应达到设计的混凝土立方体抗压强度标准值的（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":26},"50%",{"key":24,"text":448,"correct":26},"75%",{"key":28,"text":450,"correct":26},"80%",{"key":31,"text":452,"correct":22},"100%",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1148688,"预制安装水池壁板吊装前，壁板侧面应全面（ ）并清除松动石子等物。",[457,459,461,463],{"key":20,"text":458,"correct":26},"磨平",{"key":24,"text":460,"correct":22},"凿毛",{"key":28,"text":462,"correct":26},"湿润",{"key":31,"text":464,"correct":26},"冲洗",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":31,"analysis":33},1148689,"装配式预应力混凝土水池的壁板缝混凝土浇筑施工质量是水池（ ）的关键。",[469,471,473,475],{"key":20,"text":470,"correct":26},"抗浮",{"key":24,"text":472,"correct":26},"抗变形",{"key":28,"text":474,"correct":26},"结构强度",{"key":31,"text":476,"correct":22},"防渗漏",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},1148690,"预制曲梁安装时应在梁的跨中临时支撑，待上部二期混凝土达到设计强度的（ ）及以上时，方可拆除支撑。",[481,483,485,486],{"key":20,"text":482,"correct":26},"70%",{"key":24,"text":484,"correct":26},"60%",{"key":28,"text":446,"correct":26},{"key":31,"text":448,"correct":22},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":28,"analysis":33},1148691,"预制构件应按设计位置起吊，曲梁宜采用（ ）吊装，吊绳与预制构件平面的交角不应小于（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":26},"三点，60゜",{"key":24,"text":494,"correct":26},"两点，60゜",{"key":28,"text":496,"correct":22},"三点，45゜",{"key":31,"text":498,"correct":26},"两点，45゜",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1148692,"关于预制拼装给水排水构筑物现浇板缝施工说法，不正确的有（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"板缝部位混凝土表面不用凿毛",{"key":24,"text":506,"correct":26},"外模应分段随浇随支",{"key":28,"text":508,"correct":26},"内模一次安装到位",{"key":31,"text":510,"correct":26},"宜采用微膨胀水泥",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":28,"analysis":33},1148693,"关于预制安装水池现浇筑壁板接缝混凝土施工措施的说法，错误的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":26},"强度较预制壁板应提高一级",{"key":24,"text":518,"correct":26},"宜采用膨胀混凝土",{"key":28,"text":520,"correct":22},"应在壁板间缝较小时段灌注",{"key":31,"text":522,"correct":26},"应采取必要的养护措施",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1148694,"装配式预应力混凝土水池中现浇壁板缝混凝土施工时，混凝土若有离析现象，应（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":26},"加水泥浆重新拌和",{"key":24,"text":530,"correct":22},"进行二次拌和",{"key":28,"text":532,"correct":26},"加水泥重新拌和",{"key":31,"text":534,"correct":26},"掺加防水剂后重新拌和",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1148695,"预制安装水池的壁板缝在浇筑混凝土时，壁板接缝的内模宜一次安装到顶；外模应分段随浇随支。分段支模高度不宜超过（ ）m。",[539,541,543,545],{"key":20,"text":540,"correct":22},"1.5",{"key":24,"text":542,"correct":26},"2.5",{"key":28,"text":544,"correct":26},"2.0",{"key":31,"text":546,"correct":26},"1.0",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1148696,"预制安装水池接缝的混凝土强度应符合设计规定，当设计无规定时，应采用（ ）的混凝土。",[551,553,555,557],{"key":20,"text":552,"correct":22},"比壁板混凝土强度提高一级",{"key":24,"text":554,"correct":26},"与壁板混凝土强度等级相同",{"key":28,"text":556,"correct":26},"在强度混凝土",{"key":31,"text":558,"correct":26},"强度等级为C30混凝土",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1148697,"预制安装水池的壁板缝混凝土分层浇筑厚度不宜超过（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"250mm",{"key":24,"text":566,"correct":26},"450mm",{"key":28,"text":568,"correct":26},"100mm",{"key":31,"text":570,"correct":26},"500mm",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},1148698,"现浇壁板缝的混凝土浇筑时间应根据气温和混凝土温度选在（ ）时进行。",[575,577,579,581],{"key":20,"text":576,"correct":26},"壁板缝宽度较小",{"key":24,"text":578,"correct":22},"壁板缝宽度较大",{"key":28,"text":580,"correct":26},"无要求",{"key":31,"text":582,"correct":26},"室外气温高于15℃时",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},1148699,"现浇壁板缝在混凝土施工时，混凝土如有离析现象，应（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":26},"加水重新拌合",{"key":24,"text":590,"correct":22},"进行二次拌合",{"key":28,"text":592,"correct":26},"加水泥重新拌合",{"key":31,"text":594,"correct":26},"取出粗颗粒后使用",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},1148700,"水池满水试验必须在规定的条件下进行，以下满水试验前必须具备的条件中错误的是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":26},"池体的混凝土或砖、石砌体的砂浆已达到设计强度要求",{"key":24,"text":602,"correct":26},"现浇钢筋混凝土池体的防水层、防腐层施工之前",{"key":28,"text":604,"correct":26},"装配式预应力混凝土池体施加预应力且锚固端封锚以后，保护层喷涂之前",{"key":31,"text":606,"correct":22},"砖砌池体防水层施工以前，石砌池体勾缝以后",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":20,"analysis":33},1148701,"给水排水构筑物满水试验要求，水位测针的读数精确度应达（ ）mm。",[611,613,615,617],{"key":20,"text":612,"correct":22},"1\u002F10",{"key":24,"text":614,"correct":26},"1\u002F5",{"key":28,"text":616,"correct":26},"1\u002F20",{"key":31,"text":618,"correct":26},"1\u002F50",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]