[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,14,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,306,318,329,338,350,362,374,386,398,410,422,434,446,457,469,481,493,505,515,527,539,551,562,574,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1148602,1,"单选题","选择盾构机的原则之一经济合理性是指，所选择的盾构机及其辅助工法用于工程项目施工，在满足施工安全、质量标准、环境保护要求和工期要求的前提下，其（ ）合理。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","设备购置费",false,{"key":24,"text":25,"correct":22},"B","设备折旧费",{"key":27,"text":28,"correct":22},"C","设备维护保养费",{"key":30,"text":31,"correct":32},"D","综合施工成本",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1148603,"选择盾构机时的技术先进性原则要以（ ）为前提。",[38,40,42,44],{"key":20,"text":39,"correct":22},"经济合理性",{"key":24,"text":41,"correct":22},"适用性",{"key":27,"text":43,"correct":32},"可靠性",{"key":30,"text":45,"correct":22},"操作性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1148604,"当盾构掘进采用泥水机械出土和用井点降水施工时，施工场地面应设相当规模的（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"水泵房",{"key":24,"text":53,"correct":22},"空压机房",{"key":27,"text":55,"correct":22},"中央控制室",{"key":30,"text":57,"correct":22},"地面出土和堆土设施",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1148605,"有关盾构接收施工要点的叙述，错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"盾构接收前，应对洞口段土体进行质量检查，合格后方可接收掘进",{"key":24,"text":65,"correct":32},"当盾构到达接收工作井100m内，应控制掘进速度和土仓压力等",{"key":27,"text":67,"correct":22},"当盾构到达接收工作井时，应使管片环缝挤压密实，确保密封防水效果",{"key":30,"text":69,"correct":22},"盾构主机进人接收工作井后，应及时密封管片环与洞门间隙",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1148606,"土压平衡盾构掘进过程中，土仓压力维持不包含（ ）的方法。",[74,76,78,80],{"key":20,"text":75,"correct":22},"用螺旋排土器的转数控制",{"key":24,"text":77,"correct":22},"用盾构千斤顶的推进速度控制",{"key":27,"text":79,"correct":22},"两者的组合控制",{"key":30,"text":81,"correct":32},"改善流塑性",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1148607,"关于管片拼装顺序以下说法错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"最后安装邻接管片",{"key":24,"text":89,"correct":22},"先安装下部的标准管片",{"key":27,"text":91,"correct":22},"最后安装楔形管片",{"key":30,"text":93,"correct":22},"然后交替安装左右两侧标准管片",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1148608,"注浆方式有同步注浆、二次注浆、堵水注浆等，下列哪一项不属于选择注浆方式的依据（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"地质条件",{"key":24,"text":101,"correct":22},"地表沉降状态",{"key":27,"text":103,"correct":22},"环境要求",{"key":30,"text":105,"correct":32},"隧道防水要求",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1148609,"关于注浆目的，下列说法错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"使管片与围岩之间的环形空隙尽早建立注浆体的支撑体系",{"key":24,"text":113,"correct":32},"确保管片发生移位变形",{"key":27,"text":115,"correct":22},"尽快获得注浆体的固结强度，确保管片初衬结构的早期稳定性",{"key":30,"text":117,"correct":22},"作为隧道衬砌结构加强层，具有耐久性和一定强度",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1148610,"隧道线形控制的主要任务是控制（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":32},"盾构姿态",{"key":24,"text":125,"correct":22},"盾尾密封",{"key":27,"text":127,"correct":22},"注浆压力",{"key":30,"text":129,"correct":22},"拼装质量",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1148611,"盾构掘进通过某一断面的地层变形时间曲线与盾构掘进过程中所处位置相关，某一断面地层变形的变形一时间曲线划分为（ ）个阶段。",[134,136,138,140],{"key":20,"text":135,"correct":22},"3",{"key":24,"text":137,"correct":22},"4",{"key":27,"text":139,"correct":32},"5",{"key":30,"text":141,"correct":22},"6",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1148612,"盾构近接施工会引发地层变形，对既有结构物会造成不同程度的有害影响，因此有必要采取（ ）措施控制地层变形以保护既有结构物。",[146,148,150,152],{"key":20,"text":147,"correct":32},"系统性",{"key":24,"text":149,"correct":22},"针对性",{"key":27,"text":151,"correct":22},"专项",{"key":30,"text":153,"correct":22},"综合",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1148613,"下列对既有结构物所采取的保护措施，不正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"调査工程条件",{"key":24,"text":161,"correct":22},"制定专项施工方案",{"key":27,"text":163,"correct":22},"监控量测",{"key":30,"text":165,"correct":32},"控制影响区域",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1148614,"下列盾构掘进的地层中，需要采取措施控制后续沉降的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"岩层",{"key":24,"text":173,"correct":22},"卵石",{"key":27,"text":175,"correct":32},"软弱黏性土",{"key":30,"text":177,"correct":22},"砂土",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1148615,"土压式盾构在软弱或松散地层掘进时，盾构外周与周围土体的黏滞阻力或摩擦力较大时，应采取（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"盾构姿态控制措施",{"key":24,"text":185,"correct":22},"盾构参数控制措施",{"key":27,"text":187,"correct":22},"加强排土量控制措施",{"key":30,"text":189,"correct":32},"注浆减阻措施",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1148616,"密闭式盾构掘进时，出现土压计（或水压计）检测的土压（泥水压）值波动大的情况，一般可判定为（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"土压不稳定",{"key":24,"text":197,"correct":32},"开挖面不稳定",{"key":27,"text":199,"correct":22},"泥水压不稳定",{"key":30,"text":201,"correct":22},"盾构参数不稳定",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1148617,"全断面法适用于地质条件好的地层，围岩必须有足够的（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"强度",{"key":24,"text":209,"correct":22},"抵抗变形能力",{"key":27,"text":211,"correct":32},"自稳能力",{"key":30,"text":213,"correct":22},"不透水性",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},1148618,"以下关于台阶法开挖法优点说法错误的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"灵活多变，适用性强，是各种开挖方法中的基本方法",{"key":24,"text":221,"correct":22},"有足够的作业空间和较快的施工速度",{"key":27,"text":223,"correct":32},"当地层无水、洞跨小于12m时，均可采用该方法",{"key":30,"text":225,"correct":22},"适用于软弱围岩，如第四纪沉积地层",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1148619,"以下不属于台阶开挖法优点的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"较快的施工速度",{"key":24,"text":233,"correct":32},"沉降控制好",{"key":27,"text":235,"correct":22},"灵活多变",{"key":30,"text":237,"correct":22},"适用性强",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},1148620,"浅埋暗挖法施工因掘进方式不同，可分为众多的具体施工方法，以下表述正确的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"全断面开挖法适用于土质稳定、断面较大的隧道施工",{"key":24,"text":245,"correct":22},"对城市第四纪地层，施工中一般要打设锚杆",{"key":27,"text":247,"correct":32},"CD工法基础上加设临时仰拱，即变成所谓的交叉中隔壁法（CRD工法）",{"key":30,"text":249,"correct":22},"柱洞法与洞桩法的施工步序基本一致",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1148621,"正台阶环形开挖法，一般将断面最少分（ ）部分。",[254,256,258,260],{"key":20,"text":255,"correct":32},"二",{"key":24,"text":257,"correct":22},"三",{"key":27,"text":259,"correct":22},"四",{"key":30,"text":261,"correct":22},"五",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},1148622,"环形开挖预留核心土法中，核心土的主要作用是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"防止地表沉降",{"key":24,"text":269,"correct":22},"防止拱顶下沉",{"key":27,"text":271,"correct":32},"支承开挖面稳定",{"key":30,"text":273,"correct":22},"防止隧道收敛",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1148623,"单侧壁导坑法，侧壁导坑宽度一般不宜超过（ ）倍洞宽。",[278,280,282,284],{"key":20,"text":279,"correct":22},"1\u002F3",{"key":24,"text":281,"correct":22},"2\u002F5",{"key":27,"text":283,"correct":32},"1\u002F2",{"key":30,"text":285,"correct":22},"2\u002F3",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":30,"analysis":33},1148624,"当地层条件差、断面特大时，一般不采用（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"中洞法",{"key":24,"text":293,"correct":22},"双侧壁导坑",{"key":27,"text":295,"correct":22},"洞桩法",{"key":30,"text":297,"correct":32},"CRD法",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1148625,"双侧壁导坑法，侧壁导坑宽度一般不宜超过断面最大跨度的（ ）。",[302,303,304,305],{"key":20,"text":279,"correct":32},{"key":24,"text":281,"correct":22},{"key":27,"text":283,"correct":22},{"key":30,"text":285,"correct":22},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},1148626,"CRD法是在CD工法基础上增设（ ），即所谓的交叉中隔壁法。",[310,312,314,316],{"key":20,"text":311,"correct":32},"临时仰拱",{"key":24,"text":313,"correct":22},"超前小导管",{"key":27,"text":315,"correct":22},"管棚",{"key":30,"text":317,"correct":22},"钢拱架",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},1148627,"浅埋暗挖法的主要开挖方法中沉降较小的是（ ）。",[322,324,325,327],{"key":20,"text":323,"correct":22},"正台阶法",{"key":24,"text":297,"correct":32},{"key":27,"text":326,"correct":22},"CD法",{"key":30,"text":328,"correct":22},"双侧壁导坑法",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":30,"analysis":33},1148628,"浅埋暗挖法的主要开挖方法中沉降较大的是（ ）。",[333,334,335,337],{"key":20,"text":323,"correct":22},{"key":24,"text":297,"correct":22},{"key":27,"text":336,"correct":22},"全断面法",{"key":30,"text":326,"correct":32},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},1148629,"小导管常用设计参数中，钢管直径宜为（ ）mm，并应大于循环进尺的2倍。",[342,344,346,348],{"key":20,"text":343,"correct":22},"30~40",{"key":24,"text":345,"correct":32},"40~50",{"key":27,"text":347,"correct":22},"20~50",{"key":30,"text":349,"correct":22},"30~50",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},1148630,"注浆工艺应简单、方便、安全，应根据（ ）选择注浆工艺（法）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"设计要求",{"key":24,"text":357,"correct":22},"施工条件",{"key":27,"text":359,"correct":32},"土质条件",{"key":30,"text":361,"correct":22},"技术要求",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":30,"analysis":33},1148631,"下列关于小导管注浆加固方法的选用，叙述有误的是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"砂卵石地层中宜采用渗入注浆法",{"key":24,"text":369,"correct":22},"砂层中宜采用挤压注浆法",{"key":27,"text":371,"correct":22},"黏土层中宜采用劈裂或电动硅化注浆法",{"key":30,"text":373,"correct":32},"淤泥质软土层中宜采用渗透注浆法",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},1148632,"超前小导管注浆施工应根据土质条件选择注浆法，以下关于选择注浆法说法正确的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"在砂卵石地层中宜采用高压喷射注浆法",{"key":24,"text":381,"correct":32},"在黏土层中宜采用劈裂或电动硅化注浆法",{"key":27,"text":383,"correct":22},"在砂层中宜采用渗入注浆",{"key":30,"text":385,"correct":22},"在淤泥质软土层中宜采用劈裂注浆法",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},1148633,"超前小导管注浆终压应由地层条件和周边环境控制要求确定，一般宜不大于（ ）MPa。每孔稳压时间不小于2min。",[390,392,394,396],{"key":20,"text":391,"correct":22},"0.2",{"key":24,"text":393,"correct":32},"0.5",{"key":27,"text":395,"correct":22},"0.8",{"key":30,"text":397,"correct":22},"0.4",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":30,"analysis":33},1148634,"小导管注浆施工应根据土质条件选择注浆法，在砂层中宜采用（ ）注浆法。",[402,404,406,408],{"key":20,"text":403,"correct":22},"劈裂",{"key":24,"text":405,"correct":22},"渗入",{"key":27,"text":407,"correct":22},"电动硅化",{"key":30,"text":409,"correct":32},"挤压、渗透注浆法",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":27,"analysis":33},1148635,"浅埋暗挖法施工时，处于砂砾地层，并穿越既有铁路，宜采用的辅助施工方法是（ ）",[414,416,418,420],{"key":20,"text":415,"correct":22},"地面砂浆锚杆",{"key":24,"text":417,"correct":22},"小导管注浆加固",{"key":27,"text":419,"correct":32},"管棚超前支护",{"key":30,"text":421,"correct":22},"降低地下水位",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":27,"analysis":33},1148636,"关于管棚施工的表述中，正确的是（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"管棚之间不可设置小导管",{"key":24,"text":429,"correct":22},"管棚不可用于强膨胀性地层",{"key":27,"text":431,"correct":32},"管棚中的钢管应按照设计要求进行加工和开孔，管内应灌注水泥浆或水泥砂浆",{"key":30,"text":433,"correct":22},"管棚末端应支架在坚硬土层上",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},1148637,"管棚超前支护是为了在特殊条件下安全开挖，预先提供增强地层承载力的（ ）支护方法，对控制塌方和抑制地表沉降有明显的效果。",[438,440,442,444],{"key":20,"text":439,"correct":32},"临时",{"key":24,"text":441,"correct":22},"永久",{"key":27,"text":443,"correct":22},"强力",{"key":30,"text":445,"correct":22},"附加",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":27,"analysis":33},1148638,"管棚是由钢管和（ ）组成，钢管沿着开挖轮廓线，以较小的外插角，向开挖面前方敷设。",[450,452,454,455],{"key":20,"text":451,"correct":22},"小导管",{"key":24,"text":453,"correct":22},"钢筋网",{"key":27,"text":317,"correct":32},{"key":30,"text":456,"correct":22},"锚杆",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1148639,"钢拱架宜选用钢筋、型钢、钢轨等制成，采用钢筋加工而成格栅的主筋直径不宜小于（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"16mm",{"key":24,"text":464,"correct":32},"18mm",{"key":27,"text":466,"correct":22},"20mm",{"key":30,"text":468,"correct":22},"22mm",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":30,"analysis":33},1148640,"喷锚加固支护施工中，钢架宜选用钢筋,型钢,钢轨等制成，格栅钢架的主筋直径不宜小于（ ）mm。",[473,475,477,479],{"key":20,"text":474,"correct":22},"10",{"key":24,"text":476,"correct":22},"13",{"key":27,"text":478,"correct":22},"15",{"key":30,"text":480,"correct":32},"18",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":30,"analysis":33},1148641,"钢筋网材料宜采用Q235钢，钢筋直径宜为6～12mm，网格尺寸宜采用（ ），搭接长度应符合规范。",[485,487,489,491],{"key":20,"text":486,"correct":22},"100～200mm",{"key":24,"text":488,"correct":22},"150～250mm",{"key":27,"text":490,"correct":22},"200～300mm",{"key":30,"text":492,"correct":32},"150～300mm",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},1148642,"喷射混凝土应采用早强混凝土，严禁使用（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"速凝剂",{"key":24,"text":500,"correct":32},"碱活性集料",{"key":27,"text":502,"correct":22},"早强剂",{"key":30,"text":504,"correct":22},"都不对",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":27,"analysis":33},1148643,"双向相邻管棚的搭接长度不小于（ ）m。",[509,511,513,514],{"key":20,"text":510,"correct":22},"2",{"key":24,"text":512,"correct":22},"2~3",{"key":27,"text":135,"correct":32},{"key":30,"text":139,"correct":22},{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},1148644,"喷射混凝土应紧跟开挖工作面，应分段、分片、分层，（ ）顺序进行。",[519,521,523,525],{"key":20,"text":520,"correct":32},"由下而上",{"key":24,"text":522,"correct":22},"由上而下",{"key":27,"text":524,"correct":22},"由前而后",{"key":30,"text":526,"correct":22},"由后而前",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1148645,"以下关于隧道工程防水说法正确的是（ ）。",[531,533,535,537],{"key":20,"text":532,"correct":22},"施工期间的防水措施主要是排、截和堵",{"key":24,"text":534,"correct":32},"当处于地下潜水位以上的贫水稳定地层，在确保安全的前提下，可限量排水",{"key":27,"text":536,"correct":22},"含水的松散破碎地层不应采用降低地下水位的排水方案",{"key":30,"text":538,"correct":22},"当采用降水方案不能满足要求时，应在开挖的同时进行堵水处理",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":27,"analysis":33},1148646,"现浇二次衬衬砌混凝土应采用（ ）混凝土，且应具有良好的抗裂性能。",[543,545,547,549],{"key":20,"text":544,"correct":22},"早强",{"key":24,"text":546,"correct":22},"速凝",{"key":27,"text":548,"correct":32},"补偿收缩",{"key":30,"text":550,"correct":22},"自流平",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},1148647,"现浇二次衬砌混凝土浇筑因故中断，则必须采取措施对两次浇筑混凝土界面进行处理，以满足（ ）要求。",[555,557,558,560],{"key":20,"text":556,"correct":32},"防水",{"key":24,"text":207,"correct":22},{"key":27,"text":559,"correct":22},"连接",{"key":30,"text":561,"correct":22},"工艺",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1148648,"地面锚杆按矩形或梅花形布置，以下施作顺序正确的是（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"钻孔→吹孔→插→锚杆→灌浆→孔固定锚杆",{"key":24,"text":569,"correct":32},"钻孔→吹孔→灌浆→插入锚杆→孔口固定锚杆",{"key":27,"text":571,"correct":22},"钻孔→吹孔→插入锚杆→孔口固定锚杆→灌浆",{"key":30,"text":573,"correct":22},"钻孔→插入锚杆→吹孔→灌浆→孔口固定锚杆",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1148649,"适用于浅埋暗挖、进出工作井地段和岩体松软破碎地段暗挖隧道外的超前加固技术是（ ）。",[578,579,581,583],{"key":20,"text":421,"correct":22},{"key":24,"text":580,"correct":32},"地表锚杆",{"key":27,"text":582,"correct":22},"冻结法固结地层",{"key":30,"text":584,"correct":22},"喷射混凝土",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":27,"analysis":33},1148650,"下列厂站构筑物中，属于给水处理构筑物的是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"初沉淀池",{"key":24,"text":592,"correct":22},"二次沉淀池",{"key":27,"text":594,"correct":32},"过滤池",{"key":30,"text":596,"correct":22},"曝气池",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":24,"analysis":33},1148651,"下列给水排水构筑物中，属于调蓄构筑物的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"澄清池",{"key":24,"text":604,"correct":32},"清水池",{"key":27,"text":606,"correct":22},"生物塘",{"key":30,"text":608,"correct":22},"反应池",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]