[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,13,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,213,225,237,248,260,272,281,290,302,314,326,337,349,357,369,381,393,405,417,429,441,453,465,477,489,501,512,523,535,547,559,571,582,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1148552,1,"单选题","管涵基础为天然地基时，应按照设计要求将管底土层夯压密实，并施作()管座。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","矩形",false,{"key":24,"text":25,"correct":26},"B","弧形",true,{"key":28,"text":29,"correct":22},"C","中砂",{"key":31,"text":32,"correct":22},"D","粗砂","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1148553,"拱形涵、盖板涵施工，遇有地下水时，应先将地下水降至基底以下()方可施工。",[38,40,42,44],{"key":20,"text":39,"correct":22},"300mm",{"key":24,"text":41,"correct":26},"500mm",{"key":28,"text":43,"correct":22},"800mm",{"key":31,"text":45,"correct":22},"1000mm",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1148554,"涵洞两侧的回填土，应对称进行，高差不宜超过()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"20cm",{"key":24,"text":53,"correct":26},"30cm",{"key":28,"text":55,"correct":22},"40cm",{"key":31,"text":57,"correct":22},"50cm",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1148555,"箱涵顶进挖运土方时，挖土的进尺可根据土质确定，一般宜为()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"0.2～0.4m",{"key":24,"text":65,"correct":22},"0.3～0.6m",{"key":28,"text":67,"correct":26},"0.4～0.8m",{"key":31,"text":69,"correct":22},"0.5～0.9m",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1148556,"箱涵顶进中，()应欠挖，钢刃脚切土顶进。",[74,76,78,80],{"key":20,"text":75,"correct":22},"顶部",{"key":24,"text":77,"correct":26},"两侧",{"key":28,"text":79,"correct":22},"底部",{"key":31,"text":81,"correct":22},"中刃脚",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1148557,"箱涵顶进挖土应在()时间进行。",[86,88,90,92],{"key":20,"text":87,"correct":22},"列车运行时",{"key":24,"text":89,"correct":22},"列车减速运行时",{"key":28,"text":91,"correct":22},"列车低速运行时",{"key":31,"text":93,"correct":26},"列车运行间隙",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1148558,"箱涵顶进冬期施工时，应确保混凝土()满足规范规定或设计要求。",[98,100,102,104],{"key":20,"text":99,"correct":22},"砂率",{"key":24,"text":101,"correct":26},"入模温度",{"key":28,"text":103,"correct":22},"内外温差",{"key":31,"text":105,"correct":22},"坍落度",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1148559,"在明挖内支撑基坑基础上发展起来的，施工过程中不需设置临时支撑，而是借助结构顶板、中板自身的水平刚度和抗压强度实现对基坑围护桩（墙）的支护作用的施工方法是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"盖挖逆作法",{"key":24,"text":113,"correct":22},"明挖法",{"key":28,"text":115,"correct":22},"喷锚暗挖法",{"key":31,"text":117,"correct":22},"浅埋暗挖法",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1148560,"盖挖逆作法是基坑开挖一段后先浇筑顶板，在顶板的保护下，（ ）的施工方法。",[122,124,126,128],{"key":20,"text":123,"correct":22},"自上而下开挖、支撑，由下向上浇筑结构内衬",{"key":24,"text":125,"correct":26},"施工过程中不需要临时支撑，借助结构顶板、中板自身的水平刚度和抗压强度实现对基坑围护桩的支护作用",{"key":28,"text":127,"correct":22},"由一侧向另一侧开挖、支撑和浇筑结构内衬",{"key":31,"text":129,"correct":22},"由中间向两侧开挖、支撑和浇筑结构内衬",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1148561,"以下关于城市轨道交通车站说法不正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"地面车站位于地面，采用岛式或侧式均可",{"key":24,"text":137,"correct":22},"站台形式可采用岛式、侧式和岛、侧混合的形式",{"key":28,"text":139,"correct":22},"高架车站位于地面高架结构上，分为路中设置和路侧设置两种",{"key":31,"text":141,"correct":26},"枢纽站位于两条及两条以上线路交叉点上的车站，可接、送两条线路上的列车",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1148562,"采用浅埋暗挖法时要注意其地层适用条件，条件之一是作业过程中地层应（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"无变化",{"key":24,"text":149,"correct":22},"均匀",{"key":28,"text":151,"correct":26},"无水",{"key":31,"text":153,"correct":22},"密实",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1148563,"采用盖挖法施工的地铁车站多采用（ ）结构。",[158,160,162,164],{"key":20,"text":159,"correct":26},"矩形框架",{"key":24,"text":161,"correct":22},"拱形",{"key":28,"text":163,"correct":22},"双拱形",{"key":31,"text":165,"correct":22},"三拱形",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1148564,"以下关于浅埋暗挖法隧道土方开挖与支护原则说法正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"开挖一段，预支护、预加固一段",{"key":24,"text":173,"correct":22},"支护一段，开挖一段",{"key":28,"text":175,"correct":22},"封闭成环一段，支护一段",{"key":31,"text":177,"correct":26},"开挖一段，支护一段",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1148565,"与新奥法相比，浅埋暗挖法更强调地层的（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"沉降量",{"key":24,"text":185,"correct":22},"自稳时间",{"key":28,"text":187,"correct":26},"预加固和预支护",{"key":31,"text":189,"correct":22},"掘进方式",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1148566,"浅埋暗挖法隧道初期支护施作的及时性及支护的强度和刚度，对保证开挖后隧道的稳定性、减少地层扰动和地表沉降，都具有决定性的影响。在诸多支护形式中，（ ）支护是满足上述要求的最佳支护形式结构。",[194,196,198,200],{"key":20,"text":195,"correct":26},"钢拱锚喷混凝土",{"key":24,"text":197,"correct":22},"超前小导管注浆",{"key":28,"text":199,"correct":22},"开挖面深孔注浆",{"key":31,"text":201,"correct":22},"管棚超前支护",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1148567,"（ ）方法在松软含水地层中修建埋深较大的长隧道往往具有技术和经济方面的优越性",[206,208,210,211],{"key":20,"text":207,"correct":22},"明挖基坑支护法",{"key":24,"text":209,"correct":22},"盖挖逆做法",{"key":28,"text":117,"correct":22},{"key":31,"text":212,"correct":26},"盾构法",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1148568,"轻轨交通高架桥上部结构优先采用预应力混凝土结构，其次才是钢结构，须有足够的竖向和横向（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"强度",{"key":24,"text":220,"correct":26},"刚度",{"key":28,"text":222,"correct":22},"稳定性",{"key":31,"text":224,"correct":22},"A+B+C",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1148569,"城镇轻轨高架桥最常用的桥墩形式是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"倒梯形桥墩",{"key":24,"text":232,"correct":26},"T形桥墩",{"key":28,"text":234,"correct":22},"双柱式桥墩",{"key":31,"text":236,"correct":22},"Y形桥墩",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},1148570,"轨道交通车辆一般采用电力牵引，为减小因漏泄电流而造成周围金属设施的腐蚀，要求钢轨与轨下基础有较高的（ ）性能。",[241,243,245,247],{"key":20,"text":242,"correct":22},"防水",{"key":24,"text":244,"correct":22},"防潮",{"key":28,"text":246,"correct":26},"绝缘",{"key":31,"text":224,"correct":22},{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1148571,"依据《建筑基坑支护技术规范》JGJ120-2012，破坏后果为“支护结构失效、土体过大变形对基坑周边环境或主体结构施工安全的影响很严重”的基坑属于（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"特级",{"key":24,"text":255,"correct":26},"一级",{"key":28,"text":257,"correct":22},"二级",{"key":31,"text":259,"correct":22},"三级",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1148572,"盖挖顺作法的施工顺序：自地表向下开挖一定深度后先浇筑顶板，在顶板的保护下，自上而下开挖、支撑，达到设计高程后（ ）浇筑结构。",[264,266,268,270],{"key":20,"text":265,"correct":26},"由下向上",{"key":24,"text":267,"correct":22},"由上向下",{"key":28,"text":269,"correct":22},"由中间向两端",{"key":31,"text":271,"correct":22},"由两端向中间",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1148573,"围护结构变形小，能够有效控制周围土体的变形和地表沉降，有利于保护邻近建筑物和构筑物的地铁车站施工方法是（ ）。",[276,277,279,280],{"key":20,"text":113,"correct":22},{"key":24,"text":278,"correct":26},"盖挖法",{"key":28,"text":115,"correct":22},{"key":31,"text":117,"correct":22},{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1148574,"常用于修建地铁车站，并具有施工作业面多、速度快、工期短、易保证工程质量、工程造价低等优点的施工方法是（ ）。",[285,286,287,288],{"key":20,"text":278,"correct":22},{"key":24,"text":113,"correct":26},{"key":28,"text":115,"correct":22},{"key":31,"text":289,"correct":22},"新奥法",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1148575,"关于高压喷射注浆加固地基施工的基本工序说法，正确的是（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":22},"钻机就位→置入注浆管→钻孔→喷射注浆→拔出注浆管",{"key":24,"text":297,"correct":26},"钻机就位→钻孔→置入注浆管→喷射注浆→拔出注浆管",{"key":28,"text":299,"correct":22},"钻机就位→置入注浆管→喷射注浆→钻孔→拔出注浆管",{"key":31,"text":301,"correct":22},"钻机就位→钻孔→置入注浆管→拔出注浆管→喷射注浆",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},1148576,"下列土层中，采用高压喷射注浆加固，效果最好的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"淤泥质土",{"key":24,"text":309,"correct":22},"含石块土",{"key":28,"text":311,"correct":22},"有机质土",{"key":31,"text":313,"correct":22},"湿陷性黄土",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":28,"analysis":33},1148577,"水泥土搅拌桩作为重力式水泥土墙时，应用开挖方法检查搭接宽度和位置偏差，并采用（ ）检查水泥土搅拌桩的单轴抗压强度、完整性和深度。",[318,320,322,324],{"key":20,"text":319,"correct":22},"灌砂法",{"key":24,"text":321,"correct":22},"灌水法",{"key":28,"text":323,"correct":26},"钻芯法",{"key":31,"text":325,"correct":22},"环刀法",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},1148578,"水泥土搅拌桩不适用于加固（ ）。",[330,331,333,335],{"key":20,"text":307,"correct":22},{"key":24,"text":332,"correct":22},"软塑黏性土",{"key":28,"text":334,"correct":22},"稍密粉土",{"key":31,"text":336,"correct":26},"密实砂土",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},1148579,"在地基处理中，中砂以上的砂性土和有裂隙的岩石应采用（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"劈裂注浆",{"key":24,"text":344,"correct":22},"压密注浆",{"key":28,"text":346,"correct":22},"电动化学注浆",{"key":31,"text":348,"correct":26},"渗透注浆",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":28,"analysis":33},1148580,"可用于非饱和的土体，以调整不均匀沉降以及在大开挖或隧道开挖时对邻近土进行加固的注浆法称为（ ）。",[353,354,355,356],{"key":20,"text":342,"correct":22},{"key":24,"text":348,"correct":22},{"key":28,"text":344,"correct":26},{"key":31,"text":346,"correct":22},{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1148581,"以下关于各种注浆法的适用范围说法错误的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"渗透注浆只适用于中砂以上的砂性土和有裂隙的岩石",{"key":24,"text":364,"correct":26},"劈裂注浆适用于渗透系数k＜10^（-4）cm\u002Fs、靠静压力难以注入的土层",{"key":28,"text":366,"correct":22},"压密注浆常用于中砂地层，黏土地层中若有适宜的排水条件也可采用",{"key":31,"text":368,"correct":22},"压密注浆如遇地层排水困难时，就必须降低注浆速率",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},1148582,"当基坑开挖较浅、尚未设支撑时，围护墙体的水平变形表现为（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":26},"墙顶位移最大，向基坑方向水平位移，呈三角形分布",{"key":24,"text":376,"correct":22},"墙顶位移最小，向基坑方向水平位移，呈三角形分布",{"key":28,"text":378,"correct":22},"墙顶位移最大，向基坑外方向水平位移，呈三角形分布",{"key":31,"text":380,"correct":22},"墙顶位移最小，向基坑外方向水平位移，呈三角形分布",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":28,"analysis":33},1148583,"基坑周围地层移动主要是由于围护结构的（ ）造成的。",[385,387,389,391],{"key":20,"text":386,"correct":22},"地表沉降和坑底土体隆起",{"key":24,"text":388,"correct":22},"竖向变位和地表沉降",{"key":28,"text":390,"correct":26},"水平位移和坑底土体隆起",{"key":31,"text":392,"correct":22},"水平位移和竖向变位",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},1148584,"以下关于软土基坑开挖基本规定说法错误的是（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"必须分层、分块、均衡地开挖",{"key":24,"text":400,"correct":26},"基坑应该在一层全部开挖完成后及时施工支撑",{"key":28,"text":402,"correct":22},"必须按设计要求对钢支撑施加预应力",{"key":31,"text":404,"correct":22},"必须按设计要求对锚杆施加预应力",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":28,"analysis":33},1148585,"关于基坑开挖时排水措施说法，错误的是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"基坑周围地面应设排水沟",{"key":24,"text":412,"correct":22},"基坑内也应设置必要的排水设施",{"key":28,"text":414,"correct":26},"放坡开挖时，坡面不需要采取降排水措施",{"key":31,"text":416,"correct":22},"当采取基坑内、外降水措施时，应按要求降水后方可开挖土方",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},1148586,"放坡基坑施工中，分级放坡时宜设置分级过渡平台，下级放坡坡度宜（ ）上级放坡坡度。",[421,423,425,427],{"key":20,"text":422,"correct":26},"缓于",{"key":24,"text":424,"correct":22},"陡于",{"key":28,"text":426,"correct":22},"等于",{"key":31,"text":428,"correct":22},"以上均可",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1148587,"下列关于基坑边坡稳定控制措施说法错误的是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"根据土层的物理力学性质及边坡髙度确定基坑边坡坡度，并于不同土层处做成折",{"key":24,"text":436,"correct":26},"施工时严格按照设计坡度进行边坡开挖，可挖反坡",{"key":28,"text":438,"correct":22},"禁止雨水等地面水浸人土体，保持基底和边坡的干燥",{"key":31,"text":440,"correct":22},"对于土质边坡或易于软化的岩质边坡，在开挖时应及时采取相应的排水和坡脚、",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":28,"analysis":33},1148588,"设置内支撑的基坑围护结构，挡土的应力传递路径是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"围护墙→支撑→围檩",{"key":24,"text":448,"correct":22},"支撑→围檩→围护墙",{"key":28,"text":450,"correct":26},"围护墙→围檩→支撑",{"key":31,"text":452,"correct":22},"围檩→支撑→围护墙",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},1148589,"不属于钢支撑特点的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"装、拆除施工方便",{"key":24,"text":460,"correct":22},"可周转使用",{"key":28,"text":462,"correct":22},"可施加预应力",{"key":31,"text":464,"correct":26},"刚度大，变形小，施工时间长",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},1148590,"下列属于地下连续墙特点的有（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"刚度大，开挖跨度大",{"key":24,"text":472,"correct":22},"变位较大，隔水性好",{"key":28,"text":474,"correct":26},"可邻近建筑物、构筑物使用，环境影响小",{"key":31,"text":476,"correct":22},"造价适中",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1148591,"下列基坑围护结构中，可以拔出后重复利用的是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"重力式水泥土挡墙",{"key":24,"text":484,"correct":26},"SMW工法桩",{"key":28,"text":486,"correct":22},"钻孔灌注桩",{"key":31,"text":488,"correct":22},"地下连续墙",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},1148592,"以下关于各种围护结构特点，错误的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"混凝土灌注桩刚度大、施工对环境影响小、需采取降水或止水措施配合使用，如搅拌桩、旋喷桩等",{"key":24,"text":496,"correct":26},"SMW桩强度大、型钢可反复使用、需采取降水或止水措施",{"key":28,"text":498,"correct":22},"地下连续墙强度与刚度大、适用于地层广、隔水性好、可兼作部分主体结构",{"key":31,"text":500,"correct":22},"钢管桩截面刚度大于钢板桩、需采取防水措施",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":28,"analysis":33},1148593,"主要材料可反复使用，止水性好的基坑围护结构是（ ）。",[505,507,509,510],{"key":20,"text":506,"correct":22},"钢管桩",{"key":24,"text":508,"correct":22},"灌注桩",{"key":28,"text":484,"correct":26},{"key":31,"text":511,"correct":22},"型钢桩",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1148594,"目前在我国应用较多的基坑围护结构类型有很多种，以下具有良好止水形式的围护结构为（ ）。",[516,518,519,521],{"key":20,"text":517,"correct":22},"钢板桩",{"key":24,"text":506,"correct":22},{"key":28,"text":520,"correct":26},"SMW桩",{"key":31,"text":522,"correct":22},"预制混凝土板桩",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1148595,"基坑的围护结构荷载主要来自（ ）所产生的土压力和水压力，并将此压力传递到支撑，是稳定基坑的一种施工临时挡墙结构。",[527,529,531,533],{"key":20,"text":528,"correct":22},"基坑支护",{"key":24,"text":530,"correct":26},"基坑开挖卸荷",{"key":28,"text":532,"correct":22},"基坑上部荷载",{"key":31,"text":534,"correct":22},"动荷载",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},1148596,"根据轻型井点的布置要求，当基坑（槽）宽度大于6m或土质不良、渗透系数较大时，宜采用（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"单排井点",{"key":24,"text":542,"correct":26},"双排井点",{"key":28,"text":544,"correct":22},"环形井点",{"key":31,"text":546,"correct":22},"喷射井点",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},1148597,"关于基坑井点降水井点布置说法，正确的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"采用环形井点时，在地下水上游方向可不封闭，间距可达4m",{"key":24,"text":554,"correct":22},"基坑宽度小于6m且降水深度不超过6m，可采用单排井点，布置在地下水下游一侧",{"key":28,"text":556,"correct":22},"基坑宽度小于6m或土质不良、渗透系数较小，宜采用双排井点",{"key":31,"text":558,"correct":26},"当基坑面积较大时，宜采用环形井点",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1148598,"轻型井点宜采用（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":26},"金属管",{"key":24,"text":566,"correct":22},"无砂混凝土滤管",{"key":28,"text":568,"correct":22},"钢筋笼",{"key":31,"text":570,"correct":22},"化学建材管",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":28,"analysis":33},1148599,"给水排水管道工程和厂站工程施工中，常采用的降低地下水位的降水方法不包括（ ）。",[575,577,578,580],{"key":20,"text":576,"correct":22},"辐射井",{"key":24,"text":546,"correct":22},{"key":28,"text":579,"correct":26},"坎儿井",{"key":31,"text":581,"correct":22},"潜埋井",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},1148600,"当基坑开挖不很深，基坑涌水量不大时，（ ）是应用最广泛，亦是最简单、经济的方法。",[586,588,590,592],{"key":20,"text":587,"correct":22},"轻型井点",{"key":24,"text":589,"correct":26},"集水明排法",{"key":28,"text":591,"correct":22},"管井",{"key":31,"text":546,"correct":22},{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":28,"analysis":33},1148601,"选择盾构机主要根据工程地质与水文地质条件、隧道断面形状、隧道外形尺寸、隧道埋深、地下障碍物、地下构筑物、地面建筑物、地表隆沉要求等因素，经过技术、经济比较后确定。以下不属于盾构机的选择原则是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"经济合理性",{"key":24,"text":600,"correct":22},"适用性",{"key":28,"text":602,"correct":26},"可行性",{"key":31,"text":604,"correct":22},"技术先进性",[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]