[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,12,50,2019,[13,34,46,58,70,80,92,104,112,124,136,145,157,169,180,192,204,216,228,240,252,264,276,288,300,312,323,335,347,357,369,381,393,405,417,429,441,453,465,477,489,501,513,525,537,548,560,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1148502,1,"单选题","下列关于后张法预应力张拉要求的选项中，说法错误的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","当同一截面中有多束一端张拉的预应力筋时，张拉端宜均匀交错地设置在结构两端",false,{"key":24,"text":25,"correct":26},"B","张拉前应根据设计要求对孔道的摩阻损失进行实测，以便确定张拉控制应力值和实际伸长值",true,{"key":28,"text":29,"correct":22},"C","预应力筋的张拉顺序当设计无要求时，可采取分批、分阶段对称张拉",{"key":31,"text":32,"correct":22},"D","张拉过程中预应力筋断丝、滑丝、断筋的数量不得超过规定","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1148503,"在后张预应力混凝土梁孔道灌浆的水泥强度应按设计取用，如设计无要求时，不得低于（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"20Mpa",{"key":24,"text":41,"correct":26},"30Mpa",{"key":28,"text":43,"correct":22},"25Mpa",{"key":31,"text":45,"correct":22},"35Mpa",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1148504,"当防水材料为()时，基层混凝土的含水率应小于4%（质量比）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"聚合物改性沥青涂料",{"key":24,"text":53,"correct":22},"聚合物水泥涂料",{"key":28,"text":55,"correct":26},"卷材及聚氨酯涂料",{"key":31,"text":57,"correct":22},"聚合物涂料",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1148505,"桥面防水系统施工中，基层处理剂可采用()施工。",[62,64,66,68],{"key":20,"text":63,"correct":22},"内衬法",{"key":24,"text":65,"correct":26},"喷涂法",{"key":28,"text":67,"correct":22},"满粘法",{"key":31,"text":69,"correct":22},"滚涂法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1148506,"基层混凝土表面的粗糙度为1.5～2.0mm时，适宜铺设()。",[74,75,76,78],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":28,"text":77,"correct":22},"聚氨酯涂料",{"key":31,"text":79,"correct":26},"防水卷材",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":28,"analysis":33},1148507,"基层混凝土强度达到设计强度的()以上，方可进行桥面防水层施工。",[84,86,88,90],{"key":20,"text":85,"correct":22},"75%",{"key":24,"text":87,"correct":22},"65%",{"key":28,"text":89,"correct":26},"80%",{"key":31,"text":91,"correct":22},"70%",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1148508,"进行防水层施工前，混凝土基层检测的非主控项目是()。",[96,98,100,102],{"key":20,"text":97,"correct":26},"外观质量",{"key":24,"text":99,"correct":22},"含水率",{"key":28,"text":101,"correct":22},"粗糙度",{"key":31,"text":103,"correct":22},"平整度",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},1148509,"桥梁防水混凝土基层施工质量检验的主控项目不包括()。",[108,109,110,111],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":28,"text":103,"correct":22},{"key":31,"text":97,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":24,"analysis":33},1148510,"桥梁活动支座安装时，应在聚四氟乙烯板顶面凹槽内满注（）。2018真题",[116,118,120,122],{"key":20,"text":117,"correct":22},"丙酮",{"key":24,"text":119,"correct":26},"硅脂",{"key":28,"text":121,"correct":22},"清机油",{"key":31,"text":123,"correct":22},"脱模剂",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":20,"analysis":33},1148511,"适用于深水或深基坑，流速较大的砂类土、黏性土、碎石土及风化岩等坚硬河床的围堰是()。",[128,130,132,134],{"key":20,"text":129,"correct":26},"钢板桩围堰",{"key":24,"text":131,"correct":22},"堆石土围堰",{"key":28,"text":133,"correct":22},"钢套筒围堰",{"key":31,"text":135,"correct":22},"双壁围堰",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":31,"analysis":33},1148512,"适合于覆盖层较薄，平坦的岩石河床，埋置不深的水中基础，也可用于修建桩基承台的是()。",[140,142,143,144],{"key":20,"text":141,"correct":22},"土袋围堰",{"key":24,"text":131,"correct":22},{"key":28,"text":129,"correct":22},{"key":31,"text":133,"correct":26},{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":31,"analysis":33},1148513,"围堰的施工顺序为()合龙。",[149,151,153,155],{"key":20,"text":150,"correct":22},"左岸至右岸",{"key":24,"text":152,"correct":22},"下游开始至上游",{"key":28,"text":154,"correct":22},"右岸至左岸",{"key":31,"text":156,"correct":26},"上游开始至下游",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":31,"analysis":33},1148514,"桩终止锤击的控制应以控制（）为主。",[161,163,165,167],{"key":20,"text":162,"correct":22},"针入度",{"key":24,"text":164,"correct":22},"弯沉值",{"key":28,"text":166,"correct":22},"贯入度",{"key":31,"text":168,"correct":26},"设计标高",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":31,"analysis":33},1148515,"沉入桩和施工中，沉桩时桩的入土深度是否达到要求是以控制（）为主。",[173,175,176,178],{"key":20,"text":174,"correct":22},"入土深度",{"key":24,"text":166,"correct":22},{"key":28,"text":177,"correct":22},"桩顶标高",{"key":31,"text":179,"correct":26},"桩端设计标高",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":24,"analysis":33},1148516,"泥浆制备根据施工机械、工艺及穿越土层情况进行配合比设计，宜选用高塑性黏土或()。",[184,186,188,190],{"key":20,"text":185,"correct":22},"粉质黏土",{"key":24,"text":187,"correct":26},"膨润土",{"key":28,"text":189,"correct":22},"粉土",{"key":31,"text":191,"correct":22},"低塑性黏土",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":28,"analysis":33},1148517,"正、反循环钻孔达到设计深度，在灌注混凝土之前，孔底沉渣厚度应符合设计要求，设计未要求时摩擦桩的沉渣厚度不应大于()mm。",[196,198,200,202],{"key":20,"text":197,"correct":22},"100",{"key":24,"text":199,"correct":22},"200",{"key":28,"text":201,"correct":26},"300",{"key":31,"text":203,"correct":22},"400",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":28,"analysis":33},1148518,"灌注桩采用的水下灌注混凝土宜使用预拌混凝土，其集料粒径不宜大于()mm。",[208,210,212,214],{"key":20,"text":209,"correct":22},"70",{"key":24,"text":211,"correct":22},"50",{"key":28,"text":213,"correct":26},"40",{"key":31,"text":215,"correct":22},"60",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":28,"analysis":33},1148519,"钻孔灌注桩施工中，成孔后压灌混凝土并将钢筋笼插至设计深度成桩的方法是()。",[220,222,224,226],{"key":20,"text":221,"correct":22},"旋挖钻",{"key":24,"text":223,"correct":22},"潜水钻",{"key":28,"text":225,"correct":26},"螺旋钻",{"key":31,"text":227,"correct":22},"冲抓钻",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":28,"analysis":33},1148520,"人工挖孔桩必须在保证施工()前提下选用。",[232,234,236,238],{"key":20,"text":233,"correct":22},"经济",{"key":24,"text":235,"correct":22},"方便",{"key":28,"text":237,"correct":26},"安全",{"key":31,"text":239,"correct":22},"进度",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},1148521,"钻孔灌注桩灌注水下混凝土过程中，导管埋入混凝土深度宜为()。",[244,246,248,250],{"key":20,"text":245,"correct":22},"1～3m",{"key":24,"text":247,"correct":22},"2～4m",{"key":28,"text":249,"correct":22},"3～5m",{"key":31,"text":251,"correct":26},"2～6m",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},1148522,"灌注水下混凝土时，灌注的桩顶标高应高出设计标高()m，多余部分在接桩前凿除。",[256,258,260,262],{"key":20,"text":257,"correct":22},"0.5～0.7",{"key":24,"text":259,"correct":26},"0.5～1.0",{"key":28,"text":261,"correct":22},"0.7～1.0",{"key":31,"text":263,"correct":22},"1.0～1.5",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":20,"analysis":33},1148523,"钻孔桩现浇灌注工程中，混凝土坍落度宜控制在()mm",[268,270,272,274],{"key":20,"text":269,"correct":26},"180～220",{"key":24,"text":271,"correct":22},"20～40",{"key":28,"text":273,"correct":22},"20～60",{"key":31,"text":275,"correct":22},"10～60",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},1148524,"钻孔桩灌注水下混凝土必须连续施工，并控制提拔导管速度，严禁将导管提出()。",[280,282,284,286],{"key":20,"text":281,"correct":26},"混凝土灌注面",{"key":24,"text":283,"correct":22},"地下水面",{"key":28,"text":285,"correct":22},"地面",{"key":31,"text":287,"correct":22},"护筒顶面",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1148525,"采用预制混凝土管做柱身外模时，预制管安装应符合的要求不包括（）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"基础面宜采用凹槽接头，凹槽深度不得小于50mm",{"key":24,"text":295,"correct":26},"混凝土管柱应一次连续浇筑完成，并保证浇筑时的稳定",{"key":28,"text":297,"correct":22},"上下管节安装就位后，应采用四根竖方木对称设置在管柱四周并绑扎牢固",{"key":31,"text":299,"correct":22},"管节接缝应采用水泥砂浆等材料密封",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":31,"analysis":33},1148526,"钢管混凝土墩柱应采用()混凝土，一次连续浇筑完成。",[304,306,308,310],{"key":20,"text":305,"correct":22},"高强度",{"key":24,"text":307,"correct":22},"高性能",{"key":28,"text":309,"correct":22},"微收缩",{"key":31,"text":311,"correct":26},"补偿收缩",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":31,"analysis":33},1148527,"在柱式墩台施工中，采用预制混凝土管做柱身外模时，预制管的安装不符合要求的是（）",[316,318,319,321],{"key":20,"text":317,"correct":22},"上下管节安装就位后，应采用四根竖方木对称设置在管柱四周并绑扎牢固，防止撞击错位",{"key":24,"text":299,"correct":22},{"key":28,"text":320,"correct":22},"混凝土管柱外模应设斜撑，保证浇筑时的稳定",{"key":31,"text":322,"correct":26},"基础面宜采用凹槽接头，凹槽深度不得小于30mm",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":28,"analysis":33},1148528,".柱式墩台施工模板、支架除应满足强度、刚度外，稳定计算中应考虑()影响。",[327,329,331,333],{"key":20,"text":328,"correct":22},"振动",{"key":24,"text":330,"correct":22},"施工荷载",{"key":28,"text":332,"correct":26},"风力",{"key":31,"text":334,"correct":22},"冰雪荷载",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},1148529,"预制钢筋混凝土盖梁安装时，接头混凝土达到()后，方可卸除临时固定设施。",[339,341,343,345],{"key":20,"text":340,"correct":26},"设计强度",{"key":24,"text":342,"correct":22},"设计强度90%",{"key":28,"text":344,"correct":22},"设计强度80%",{"key":31,"text":346,"correct":22},"设计强度75%",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":31,"analysis":33},1148530,"桥梁墩台预制柱安装后应及时浇筑杯口混凝土，待混凝土硬化后拆除硬楔，浇筑二次混凝土，待杯口混凝土达到设计强度的()后方可拆除斜撑。",[351,353,355,356],{"key":20,"text":352,"correct":22},"45%",{"key":24,"text":354,"correct":22},"55%",{"key":28,"text":87,"correct":22},{"key":31,"text":85,"correct":26},{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1148531,"装配式梁（板）施工方案编制前，应对施工现场条件和()进行充分调研和评估。",[361,363,365,367],{"key":20,"text":362,"correct":22},"周边道路",{"key":24,"text":364,"correct":26},"拟定运输路线的社会交通",{"key":28,"text":366,"correct":22},"周边建筑",{"key":31,"text":368,"correct":22},"周边居民",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":31,"analysis":33},1148532,"人工挖孔桩施工时，浇筑的护壁混凝土结构强度大于()MPa后方可拆除其模板。",[373,375,377,379],{"key":20,"text":374,"correct":22},"2.0",{"key":24,"text":376,"correct":22},"2.5",{"key":28,"text":378,"correct":22},"4.0",{"key":31,"text":380,"correct":26},"5.0",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":28,"analysis":33},1148533,"关于支架法现浇预应力混凝土连续梁施工技术，说法错误的有()。",[385,387,389,391],{"key":20,"text":386,"correct":22},"支架的地基承载力应符合要求",{"key":24,"text":388,"correct":22},"支架底部应有良好的排水措施，不得被水浸泡",{"key":28,"text":390,"correct":26},"安装支架时，应根据支架拼装间隙和地基沉降等，设置预拱度",{"key":31,"text":392,"correct":22},"各种支架和模板安装后，宜采取预压方法消除拼装间隙和地基沉降等非弹性变形",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":28,"analysis":33},1148534,"移动模架上浇筑预应力混凝土连续梁，浇筑分段工作缝，必须设在()附近。",[397,399,401,403],{"key":20,"text":398,"correct":22},"最大弯矩",{"key":24,"text":400,"correct":22},"最小弯矩",{"key":28,"text":402,"correct":26},"弯矩零点",{"key":31,"text":404,"correct":22},"负弯矩",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},1148535,"采用悬臂浇筑法施工时，预应力混凝土连续梁合龙顺序一般是()。",[409,411,413,415],{"key":20,"text":410,"correct":26},"先边跨，后次跨，再中跨",{"key":24,"text":412,"correct":22},"先边跨，后中跨，再次跨",{"key":28,"text":414,"correct":22},"先中跨，后边跨，再次跨",{"key":31,"text":416,"correct":22},"先次跨，后中跨，再边跨",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},1148536,"连续梁的合龙，宜在一天中()时进行。",[421,423,425,427],{"key":20,"text":422,"correct":22},"气温最高",{"key":24,"text":424,"correct":22},"常温",{"key":28,"text":426,"correct":26},"气温最低",{"key":31,"text":428,"correct":22},"任何温度",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1148537,"悬浇连续梁所用挂篮组装后，应进行()，以消除非弹性变形。",[433,435,437,439],{"key":20,"text":434,"correct":26},"载重试验",{"key":24,"text":436,"correct":22},"预压",{"key":28,"text":438,"correct":22},"预拱度检查",{"key":31,"text":440,"correct":22},"行走试验",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},1148538,"悬浇连续梁梁体一般应分()大部分浇筑。",[445,447,449,451],{"key":20,"text":446,"correct":22},"3",{"key":24,"text":448,"correct":26},"4",{"key":28,"text":450,"correct":22},"5",{"key":31,"text":452,"correct":22},"6",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1148539,"关于挂篮设计和组装，说法正确的是（）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"挂篮质量与梁段混凝土的质量比值控制在1.0",{"key":24,"text":460,"correct":26},"挂篮自锚固系统的安全系数不得小于2",{"key":28,"text":462,"correct":22},"施工、行走时的抗倾覆安全系数不得小于3",{"key":31,"text":464,"correct":22},"斜拉水平限位系统和上水平限位安全系数不得小于3",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1148540,"钢一混凝土组合梁的钢梁出厂前必须进行()，按设计和有关规范的要求验收。",[469,471,473,475],{"key":20,"text":470,"correct":26},"试拼装",{"key":24,"text":472,"correct":22},"变形矫正",{"key":28,"text":474,"correct":22},"焊缝检验",{"key":31,"text":476,"correct":22},"螺栓摩擦面检验",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},1148541,"钢梁制造焊接应在室内进行，相对湿度不宜高于()。",[481,483,485,487],{"key":20,"text":482,"correct":22},"0.5",{"key":24,"text":484,"correct":22},"0.6",{"key":28,"text":486,"correct":22},"0.7",{"key":31,"text":488,"correct":26},"0.8",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},1148542,"安装钢—混凝土组合梁的钢梁时，每安装完成一节应进行测量，不符合要求应及时调整。下列选项中不属于应测项目的是()。",[493,495,497,499],{"key":20,"text":494,"correct":22},"标高",{"key":24,"text":496,"correct":26},"扭曲",{"key":28,"text":498,"correct":22},"位置",{"key":31,"text":500,"correct":22},"预拱度",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":28,"analysis":33},1148543,"安装钢—混凝土组合梁的钢梁时，工地焊接连接的焊接顺序宜为()对称进行。",[505,507,509,511],{"key":20,"text":506,"correct":22},"纵向从跨中向两端、横向从两侧向中线",{"key":24,"text":508,"correct":22},"纵向从两端向跨中、横向从中线向两侧",{"key":28,"text":510,"correct":26},"纵向从跨中向两端、横向从中线向两侧",{"key":31,"text":512,"correct":22},"横向从两端向跨中、纵向从中线向两侧",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1148544,"下面关于在拱架上浇筑砼拱圈表述不正确的是()",[517,519,521,523],{"key":20,"text":518,"correct":26},"跨径小于18m的拱圈或拱肋混凝土，应按拱圈全宽从拱圈从两端拱脚向拱顶对称、连续浇筑，并在拱脚混凝土初凝前完成。",{"key":24,"text":520,"correct":22},"不能完成时，则应在拱脚预留一个隔缝，最后浇筑隔缝混凝土",{"key":28,"text":522,"correct":22},"跨径大于等于16m的拱圈或拱肋，宜分段浇筑。",{"key":31,"text":524,"correct":22},"拱圈封拱合龙时混凝土强度，设计无要求时，各段混凝土强度应达到设计强度的75%",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1148545,"斜拉桥索塔的施工可视其结构、体形、材料、施工设备和设计要求综合考虑，选用适合的方法，横梁较多的高塔，宜采用()。",[529,531,533,535],{"key":20,"text":530,"correct":22},"爬模法",{"key":24,"text":532,"correct":26},"劲性骨架挂模提升法",{"key":28,"text":534,"correct":22},"支架法",{"key":31,"text":536,"correct":22},"悬臂浇筑法",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},1148546,"斜拉桥混凝土主梁施工方法有多种，其中()由于适用范围较广而成为斜拉桥主梁施工最常用的方法。",[541,543,545,546],{"key":20,"text":542,"correct":22},"顶推法",{"key":24,"text":544,"correct":22},"平转法",{"key":28,"text":534,"correct":22},{"key":31,"text":547,"correct":26},"悬臂法",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},1148547,"钢—混凝土组合梁施工中，应随时监测主梁和施工支架的()，确认符合设计要求。",[552,554,556,558],{"key":20,"text":553,"correct":22},"高程",{"key":24,"text":555,"correct":22},"内力",{"key":28,"text":557,"correct":26},"变形及稳定",{"key":31,"text":559,"correct":22},"位移",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1148548,"钢—混凝土组合连续梁，可在负弯矩区施加预应力调整负弯矩区()。",[564,566,567,569],{"key":20,"text":565,"correct":22},"荷载",{"key":24,"text":555,"correct":26},{"key":28,"text":568,"correct":22},"变形",{"key":31,"text":500,"correct":22},{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":28,"analysis":33},1148549,"钢—混凝土组合梁在钢梁与钢筋混凝土板之间设传()器，二者共同工作。",[574,576,578,580],{"key":20,"text":575,"correct":22},"拉",{"key":24,"text":577,"correct":22},"压",{"key":28,"text":579,"correct":26},"剪",{"key":31,"text":581,"correct":22},"弯",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":31,"analysis":33},1148550,"在拱架上分段现浇混凝土拱圈时，关于间隔槽混凝土浇筑的说法，错误的是()。",[586,588,590,592],{"key":20,"text":587,"correct":22},"应待拱圈混凝土分段浇筑完成且强度达到75%设计强度",{"key":24,"text":589,"correct":22},"分段接合面按施工缝处理后，由拱脚向拱顶对称进行浇筑",{"key":28,"text":591,"correct":22},"应待接合面按施工缝处理后再进行",{"key":31,"text":593,"correct":26},"分段接合面按施工缝处理后，由拱顶向拱脚对称进行浇筑",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":28,"analysis":33},1148551,"拱桥施工方法选用应根据拱桥的()、结构形式、现场施工条件、施工水平等因素，并经方案的技术经济比较确定合理的施工方法。",[598,600,602,604],{"key":20,"text":599,"correct":22},"长度",{"key":24,"text":601,"correct":22},"高度",{"key":28,"text":603,"correct":26},"跨度",{"key":31,"text":605,"correct":22},"宽度",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]