[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,11,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,306,318,330,342,354,366,378,390,401,413,425,437,449,461,472,482,494,506,518,530,542,551,563,573,585,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1148452,1,"单选题","以下选项中关于热拌沥青混合料路面接缝说法正确的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","将已摊铺混合料留下部分暂不碾压，然后跨缝压实的做法属于冷接缝",false,{"key":24,"text":25,"correct":26},"B","采用梯队作业摊铺时应选用热接缝",true,{"key":28,"text":29,"correct":22},"C","高等级道路各层的横向接缝应采用平接缝",{"key":31,"text":32,"correct":22},"D","其他等级的道路各层的横向接缝可采用平接缝","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1148453,"改性沥青混合料的贮存时间不宜超过()h。",[38,40,42,44],{"key":20,"text":39,"correct":22},"8",{"key":24,"text":41,"correct":22},"12",{"key":28,"text":43,"correct":26},"24",{"key":31,"text":45,"correct":22},"36",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1148454,"当改性沥青SMA混合料高温碾压有推拥现象时，应复查其级配，且不得采用()碾压，以防混合料被搓擦挤压上浮，造成构造深度降低或泛油。",[50,52,54,56],{"key":20,"text":51,"correct":22},"小型压路机",{"key":24,"text":53,"correct":22},"钢筒式压路机",{"key":28,"text":55,"correct":22},"振动压路机",{"key":31,"text":57,"correct":26},"轮胎压路机",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1148455,"改性沥青混合料面层的横向接缝续接施工前，要用直尺靠量已压实的面层，不平整或厚度不符合要求部分应切除，铺新料前()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"测压实密度",{"key":24,"text":65,"correct":26},"涂刷粘层油",{"key":28,"text":67,"correct":22},"测厚度",{"key":31,"text":69,"correct":22},"测跨度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1148456,"关于改性沥青混合料施工摊铺和压实温度的说法，正确的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"初始碾压温度不低于140℃，碾压终了的表面温度不低于90℃",{"key":24,"text":77,"correct":22},"摊铺温度不低于150℃，初始碾压温度不低于140℃",{"key":28,"text":79,"correct":22},"初始碾压温度不低于150℃，碾压终了的表面温度不低于80℃",{"key":31,"text":81,"correct":26},"摊铺温度不低于160℃，碾压终了温度不低于90℃",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1148457,"高温施工时，混凝土拌合物的初凝时间不得小于()小时，低温施工时，终凝时间不得大于()小时。",[86,88,90,92],{"key":20,"text":87,"correct":26},"3，10",{"key":24,"text":89,"correct":22},"2，10",{"key":28,"text":91,"correct":22},"3，12",{"key":31,"text":93,"correct":22},"2，12",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1148458,"各交通等级要求的水泥混凝土()标准值不得低于《城镇道路工程施工与质量验收规范》CJJ1-2008的规定。",[98,100,102,104],{"key":20,"text":99,"correct":22},"抗拉强度",{"key":24,"text":101,"correct":22},"抗弯强度",{"key":28,"text":103,"correct":26},"弯拉强度",{"key":31,"text":105,"correct":22},"抗剪强度",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1148459,"高温期施工水泥混凝土路面时，混凝土拌合物的初凝时间不得小于()。",[110,112,114,116],{"key":20,"text":111,"correct":26},"3h",{"key":24,"text":113,"correct":22},"5h",{"key":28,"text":115,"correct":22},"7h",{"key":31,"text":117,"correct":22},"10h",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1148460,"水泥混凝土搅拌过程中，不属于应进行检验与控制以符合质量标准要求的技术指标有()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"含气量",{"key":24,"text":125,"correct":22},"离析",{"key":28,"text":127,"correct":22},"湿密度",{"key":31,"text":129,"correct":26},"砂率",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1148461,"水泥混凝土搅拌设备应优先选用()。",[134,136,138,140],{"key":20,"text":135,"correct":26},"间歇式拌合设备",{"key":24,"text":137,"correct":22},"连续式拌合设备",{"key":28,"text":139,"correct":22},"单立轴式搅拌机",{"key":31,"text":141,"correct":22},"滚筒式搅拌机",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1148462,"混凝土面板施工要求，采用滑模摊铺机摊铺时应布设基准线，清扫湿润基层，在拟设置胀缝处牢同安装胀缝支架、支撑点间距为()cm。",[146,148,150,152],{"key":20,"text":147,"correct":22},"20～50",{"key":24,"text":149,"correct":22},"55～75",{"key":28,"text":151,"correct":22},"50～65",{"key":31,"text":153,"correct":26},"40～60",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1148463,"水泥混凝土路面在混凝土达到()以后，可允许行人通过。",[158,160,162,164],{"key":20,"text":159,"correct":22},"设计抗压强度的30%",{"key":24,"text":161,"correct":22},"设计抗压强度的40%",{"key":28,"text":163,"correct":22},"设计弯拉强度的30%",{"key":31,"text":165,"correct":26},"设计弯拉强度的40%",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1148464,"混凝土路面施工时，当路面混凝土强度达到()设计强度时，才允许开放交通。",[170,172,174,176],{"key":20,"text":171,"correct":22},"50%",{"key":24,"text":173,"correct":22},"75%",{"key":28,"text":175,"correct":22},"85%",{"key":31,"text":177,"correct":26},"100%",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1148465,"混凝土浇筑完成后应及时进行养护，养护方法错误的是()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"保湿覆盖",{"key":24,"text":185,"correct":22},"土工毡覆盖",{"key":28,"text":187,"correct":22},"喷洒养护",{"key":31,"text":189,"correct":26},"围水养护",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1148466,"水泥混凝土路面的养护时间一般宜为()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"3～7",{"key":24,"text":197,"correct":22},"7～10",{"key":28,"text":199,"correct":22},"10～14",{"key":31,"text":201,"correct":26},"14～21",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1148467,"微表处工艺是城镇道路大修养护的施工方法之一，以下关于施工基本要求错误的是()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"对原有路面病害进行处理、刨平或补缝，使其符合设计要求",{"key":24,"text":209,"correct":22},"路面局部破损处进行挖补处理",{"key":28,"text":211,"correct":22},"深度15～40mm的车辙可采用填充处理、壅包应进行铣刨处理涂刷粘层油",{"key":31,"text":213,"correct":26},"宽度大于10mm的裂缝进行灌浆处理",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1148468,"下列关于水泥混凝土路面配合比参数计算取值的选项中，说法错误的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"水灰比应在满足弯拉强度计算值和耐久值两者要求的水灰比中取大值",{"key":24,"text":221,"correct":22},"水灰比应在满足弯拉强度计算值和耐久值两者要求的水灰比中取小值",{"key":28,"text":223,"correct":22},"单位水泥用量应在根据水灰比计算得到的计算值与满足耐久性要求的最小单位水泥用量中取大值",{"key":31,"text":225,"correct":22},"最大单位用水量应在按规范经验公式计算得到的计算值和满足工作性要求的最大单位用水量中取小值",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1148469,"关于桥梁计算跨径的说法，正确的是()。",[230,232,234,236],{"key":20,"text":231,"correct":26},"桥跨结构相邻两个支座中心之间的距离",{"key":24,"text":233,"correct":22},"相邻两个桥墩（或桥台）之间的净距",{"key":28,"text":235,"correct":22},"拱式桥的两相邻拱脚截面最低点之间的水平距离",{"key":31,"text":237,"correct":22},"多孔桥梁中各孔净跨径的总和",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1148470,"采用在竖向荷载作用下无水平反力结构的桥被称为（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"拱桥",{"key":24,"text":245,"correct":22},"斜拉桥",{"key":28,"text":247,"correct":22},"连续钢构",{"key":31,"text":249,"correct":26},"梁式桥",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1148471,"在支架上现浇预应力混凝土连续梁，其支架验算倾覆的稳定系数不得小于()。",[254,256,258,260],{"key":20,"text":255,"correct":22},"1.2",{"key":24,"text":257,"correct":26},"1.3",{"key":28,"text":259,"correct":22},"1",{"key":31,"text":261,"correct":22},"1.5",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1148472,"安装支架时，支架不得与()相连。",[266,268,270,272],{"key":20,"text":267,"correct":22},"模板",{"key":24,"text":269,"correct":26},"施工脚手架",{"key":28,"text":271,"correct":22},"拱架",{"key":31,"text":273,"correct":22},"临时支撑",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1148473,"混凝土桩制作时，预制构件的吊环必须采用()制作。",[278,280,282,284],{"key":20,"text":279,"correct":22},"经过冷拉的HPB300级热轧钢筋",{"key":24,"text":281,"correct":26},"未经过冷拉的HPB300级热轧钢筋",{"key":28,"text":283,"correct":22},"HRB335级热轧钢筋",{"key":31,"text":285,"correct":22},"HRB400级热轧钢筋",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1148474,"采用机械方法调直钢筋，必须严格控制冷拉率，以保证钢筋性能,其中，HPB300，HRB400钢筋冷拉率分别为（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"1%，2%",{"key":24,"text":293,"correct":26},"2%，1%",{"key":28,"text":295,"correct":22},"1%，3%",{"key":31,"text":297,"correct":22},"2%，3%",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1148475,"钢筋加工可采用机械方法调直，在调直加工中，必须严格控制冷拉率，以保证钢筋性能在加工后仍能满足规范要求。不同的钢筋其冷拉率要求是不同的，其中HPB300，HRB400钢筋冷拉率分别为（）。",[302,303,304,305],{"key":20,"text":291,"correct":22},{"key":24,"text":293,"correct":26},{"key":28,"text":295,"correct":22},{"key":31,"text":297,"correct":22},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1148476,"钢筋宜在()状态下弯制。",[310,312,314,316],{"key":20,"text":311,"correct":22},"低温",{"key":24,"text":313,"correct":26},"常温",{"key":28,"text":315,"correct":22},"高温",{"key":31,"text":317,"correct":22},"加热",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1148477,"钢筋的级别、种类和直径应按设计要求采用，当需要代换时，应经()同意，并履行相关程序。",[322,324,326,328],{"key":20,"text":323,"correct":26},"设计",{"key":24,"text":325,"correct":22},"监理",{"key":28,"text":327,"correct":22},"业主",{"key":31,"text":329,"correct":22},"甲方代表",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":28,"analysis":33},1148478,"预制构件的吊环必须采用未经冷拉的()钢筋制作，不得以其他钢筋替代。",[334,336,338,340],{"key":20,"text":335,"correct":22},"热轧带肋",{"key":24,"text":337,"correct":22},"冷轧带肋",{"key":28,"text":339,"correct":26},"热轧光圆",{"key":31,"text":341,"correct":22},"环氧树脂涂层",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":28,"analysis":33},1148479,"简支梁钢筋骨架组装时应按设计图纸放大样，放样时应考虑骨架()，且应符合设计和规范规定。",[346,348,350,352],{"key":20,"text":347,"correct":22},"焊接变形",{"key":24,"text":349,"correct":22},"温度变形",{"key":28,"text":351,"correct":26},"预拱度",{"key":31,"text":353,"correct":22},"局部变形",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},1148480,"钢筋接头应设在受力较小区段，不宜位于构件的最大()处。",[358,360,362,364],{"key":20,"text":359,"correct":22},"拉力",{"key":24,"text":361,"correct":22},"压力",{"key":28,"text":363,"correct":26},"弯矩",{"key":31,"text":365,"correct":22},"剪力",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1148481,"施工中钢筋受力分不清受拉、受压的，应按()处理。",[370,372,374,376],{"key":20,"text":371,"correct":26},"受拉",{"key":24,"text":373,"correct":22},"受压",{"key":28,"text":375,"correct":22},"受弯",{"key":31,"text":377,"correct":22},"受剪",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1148482,"在进行混凝土强度试配和质量评定时，混凝土的抗压强度应以()标准试件测定。",[382,384,386,388],{"key":20,"text":383,"correct":22},"圆柱体",{"key":24,"text":385,"correct":26},"立方体",{"key":28,"text":387,"correct":22},"长方体",{"key":31,"text":389,"correct":22},"三棱体",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1148483,"对C60及其以上的高强度混凝土，当混凝土方量较少时，宜留取不少于()组的试件，采川标准差未知的统计方法评定混凝土强度。",[394,396,398,400],{"key":20,"text":395,"correct":22},"5",{"key":24,"text":397,"correct":26},"10",{"key":28,"text":399,"correct":22},"3",{"key":31,"text":39,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1148484,"按规定，()在运输过程中向混凝土拌合物中加水。",[405,407,409,411],{"key":20,"text":406,"correct":26},"严禁",{"key":24,"text":408,"correct":22},"不宜",{"key":28,"text":410,"correct":22},"在坍落度损失较大时可适量",{"key":31,"text":412,"correct":22},"根据需要可以",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1148485,"混凝土拌合物从出料至入模的时间不超过15min时，其坍落度评定可仅在()检测",[417,419,421,423],{"key":20,"text":418,"correct":26},"搅拌地点",{"key":24,"text":420,"correct":22},"浇筑地点",{"key":28,"text":422,"correct":22},"搅拌站实验室",{"key":31,"text":424,"correct":22},"现场试验室",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},1148486,"混凝土的施工包括原材料的()，混凝土的搅拌、运输、浇筑和混凝土养护等内容。",[429,431,433,435],{"key":20,"text":430,"correct":22},"检测",{"key":24,"text":432,"correct":22},"检查",{"key":28,"text":434,"correct":22},"验收",{"key":31,"text":436,"correct":26},"计量",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1148487,"市政公用工程中，混凝土配合比设计要经过四个步骤，其中在施工配合比设计阶段进行配合比调整并提出施工配合比的依据是()。",[441,443,445,447],{"key":20,"text":442,"correct":26},"实测砂石含水率",{"key":24,"text":444,"correct":22},"配制强度和设计强度间关系",{"key":28,"text":446,"correct":22},"施工条件差异和变化及材料质量的可能波动",{"key":31,"text":448,"correct":22},"强度验证原理和密度修正方法",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1148488,"混凝土施工配合比设计阶段，根据实测砂石()进行配合比调整，提出施工配合比。",[453,455,457,459],{"key":20,"text":454,"correct":22},"质量",{"key":24,"text":456,"correct":26},"含水率",{"key":28,"text":458,"correct":22},"相对密度",{"key":31,"text":460,"correct":22},"级配",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":28,"analysis":33},1148489,"在施工生产中，对首次使用的混凝土施工配合比应进行()。",[465,467,468,470],{"key":20,"text":466,"correct":22},"第三方检测",{"key":24,"text":430,"correct":22},{"key":28,"text":469,"correct":26},"开盘鉴定",{"key":31,"text":471,"correct":22},"试验",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},1148490,"采用泵送混凝土时，泵送间歇时间不宜超过()min。",[476,477,478,480],{"key":20,"text":395,"correct":22},{"key":24,"text":397,"correct":22},{"key":28,"text":479,"correct":26},"15",{"key":31,"text":481,"correct":22},"20",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1148491,"预应力筋在切断时，不得采用()切割。",[486,488,490,492],{"key":20,"text":487,"correct":22},"切断机",{"key":24,"text":489,"correct":22},"砂轮锯",{"key":28,"text":491,"correct":22},"手锯",{"key":31,"text":493,"correct":26},"电弧",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},1148492,"下列关于锚具、连接器的说法中，错误的是()。",[498,500,502,504],{"key":20,"text":499,"correct":22},"锚具应满足分级张拉、补张拉和放松预应力的要求",{"key":24,"text":501,"correct":22},"锚垫板应设置足够的螺旋钢筋或网状分布钢筋",{"key":28,"text":503,"correct":26},"适用于高强度预应力筋的锚具，不能用于较低强度的预应力筋",{"key":31,"text":505,"correct":22},"用于后张法的连接器，必须符合锚具的性能要求",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},1148493,"预应力混凝土粗集料应采用碎石，其粒径宜为()mm。",[510,512,514,516],{"key":20,"text":511,"correct":22},"5～20",{"key":24,"text":513,"correct":26},"5～25",{"key":28,"text":515,"correct":22},"10～20",{"key":31,"text":517,"correct":22},"10～25",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},1148494,"符合预应力混凝土配制要求的是()。",[522,524,526,528],{"key":20,"text":523,"correct":22},"从各种材料引入混凝土中的氯离子最大含量不宜超过水泥用量的0.08%",{"key":24,"text":525,"correct":22},"预应力混凝土宜使用矿渣硅酸盐水泥",{"key":28,"text":527,"correct":22},"混凝土中的水泥用量不宜大于750kg\u002Fm3",{"key":31,"text":529,"correct":26},"混凝土中严禁使用含氯化物的外加剂及引气剂或引气型减水剂",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},1148495,"配制预应力混凝土时应优先采用()。",[534,536,538,540],{"key":20,"text":535,"correct":26},"普通硅酸盐水泥",{"key":24,"text":537,"correct":22},"矿渣硅酸盐水泥",{"key":28,"text":539,"correct":22},"火山灰质硅酸盐水泥",{"key":31,"text":541,"correct":22},"粉煤灰硅酸盐水泥",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},1148496,"预应力混凝土不得使用()。",[546,548,549,550],{"key":20,"text":547,"correct":22},"硅酸盐水泥",{"key":24,"text":541,"correct":26},{"key":28,"text":537,"correct":22},{"key":31,"text":535,"correct":22},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},1148497,"预应力张拉是桥梁施工中的关键工序，下列说法正确的是（）。",[555,557,559,561],{"key":20,"text":556,"correct":26},"预应力筋张拉采用应力控制方法时，控张应力必须符合设计要求",{"key":24,"text":558,"correct":22},"当张拉实际伸长值与超过理论伸长值5%时，必须停止张拉，防止预应力超张",{"key":28,"text":560,"correct":22},"当张拉实际伸长值不足理论伸长值，则必须补张",{"key":31,"text":562,"correct":22},"预应力筋的张拉顺序可由施工单位根据现场条件确定实施",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":31,"analysis":33},1148498,"放张预应力筋时混凝土强度必须符合设计要求，设计未要求时，不得低于强度设计值的（）。",[567,569,570,572],{"key":20,"text":568,"correct":22},"25%",{"key":24,"text":171,"correct":22},{"key":28,"text":571,"correct":22},"60%",{"key":31,"text":173,"correct":26},{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},1148499,"下列关于先张法预应力筋张拉程序的选项中，适用于钢筋的是()。",[577,579,581,583],{"key":20,"text":578,"correct":22},"0→初应力→1.03σcon（锚固）",{"key":24,"text":580,"correct":26},"0→初应力→1.05σcon→0.9σcon→σcon（锚固）",{"key":28,"text":582,"correct":22},"0→初应力→σcon（持荷2min锚固）",{"key":31,"text":584,"correct":22},"0→初应力→1.05σcon(持荷2min)→0→σcon（锚固）",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},1148500,"下列关于后张法预应力筋张拉程序的选项中，适用于有自锚性能的锚具、普通松弛预应力筋的是()。",[589,590,592,593],{"key":20,"text":578,"correct":26},{"key":24,"text":591,"correct":22},"0→初应力→1.05σcon(持荷2min)→σcon（锚固）",{"key":28,"text":582,"correct":22},{"key":31,"text":594,"correct":22},"0→初应力→1.05σcon(持荷2min）→0→σcon(锚固）",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},1148501,"钢绞线束或钢丝束施工时，下列选项中，适用于没有自锚性能锚具的后张法预应力筋张拉程序有()。",[599,600,601,602],{"key":20,"text":578,"correct":22},{"key":24,"text":591,"correct":26},{"key":28,"text":582,"correct":22},{"key":31,"text":603,"correct":22},"低松弛力筋0→初应力→σcon（持荷2min锚固）",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]