[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149990":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149990,802,2,"多选题","当出现下列（）情况之一时，应加强监测，提高监测频率。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","监测数据达到报警值",true,{"key":16,"text":17,"correct":18},"B","监测数据变化速率减缓",false,{"key":20,"text":21,"correct":18},"C","基坑边堆放物料",{"key":23,"text":24,"correct":14},"D","存在勘察未发现的不良地质",{"key":26,"text":27,"correct":14},"E","支护结构出现开裂","ADE","2020教材P470 \u002F 2019教材P471 当出现下列情况之一时，应加强监测，提高监测频率： ⑴ 监测数据达到报警值。 (2) 监测数据变化较大或者速率加快。 ( 3 ) 存在勘察未发现的不良地质。 (4) 超深、超长开挖或未及时加撑等违反设计工况施工。 (5) 基坑及周边大量积水、长时间连续降雨、 市政管道出现泄漏。 (6) 基坑附近地面荷载突然增大或超过设计限值。 (7) 支护结构出现开裂。 ( 8 ) 周边地面突发较大沉降或出现严重开裂。 (9) 邻近建筑突发较大沉降、不均匀沉降或出现严重开裂。 (10) 基坑底部、侧壁出现管涌、 渗漏或流砂等现象",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]