[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149982":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149982,802,2,"多选题","给水排水管道沟槽回填前的规定中，( )是正确的。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于0.5m",true,{"key":16,"text":17,"correct":14},"B","压力管道水压试验合格后，应及时回填其余部分",{"key":19,"text":20,"correct":14},"C","无压管道在闭水或闭气试验合格后应及时回填",{"key":22,"text":23,"correct":24},"D","水压试验前，接口、管道两侧及管顶均不能回填",false,{"key":26,"text":27,"correct":24},"E","水压试验前，接口、管道两侧及管顶以上回填高度不应小于0.5m","ABC","2020教材P468 \u002F 2019教材P469 沟槽回填管道应符合以下要求：（1)压力管道水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于0.5m;水压试验合格后，应及时回填沟槽的其余部分。（2)无压管道在闭水或闭气试验合格后应及时回填。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]