[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149980":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149980,802,2,"多选题","下列表述中，( )是水池气密性试验应具备的工作条件。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","池体满水试验合格",true,{"key":16,"text":17,"correct":14},"B","所需的空气压缩机等设备已准备就绪",{"key":19,"text":20,"correct":14},"C","池顶盖板的封闭",{"key":22,"text":23,"correct":24},"D","保护层喷涂后",false,{"key":26,"text":27,"correct":14},"E","工艺测温孔的加堵封闭","ABCE","2020教材P467 \u002F 2019教材P468 水池气密性试验应符合下列要求：1)需进行满水试验和气密性试验的池体，应在满水试验合格后，再进行气密性试验。2)工艺测温孔的加堵封闭、池顶盖板的封闭、安装测温仪、测压仪及充气截门等均已完成。3)所需的空气压缩机等设备已准备就绪。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]