[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149875":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149875,802,2,"多选题","对预应力施工，下列叙述正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","承担预应力施工的单位应具有相应的施工资质",true,{"key":16,"text":17,"correct":18},"B","张拉设备的校准期限不得超过1年，且不得超过300次张拉作业",false,{"key":20,"text":21,"correct":14},"C","预应力张拉施工应由工程项目技术负责人主持",{"key":23,"text":24,"correct":18},"D","锚固完毕经检验合格后，可方使用电弧焊切割端头多余的预应力筋",{"key":26,"text":27,"correct":14},"E","预应力筋及孔道的品种、规格、数量必须符合设计要求","ACE","2020教材P363 \u002F 2019教材P365 （二）设备控制（1）张拉设备的检定期限不得超过半年，且不得超过200次张拉作业。 （二）张拉与锚固（5）锚固完毕经检验合格后，方可切割端头多余的预应力筋，严禁使用电弧焊切割。B和D错误，",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]