[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149855":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149855,802,2,"多选题","项目经理部应对项目质量计划执行情况组织（ ）验证实施效果。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","检查",true,{"key":16,"text":17,"correct":18},"B","调查",false,{"key":20,"text":21,"correct":18},"C","外部评审",{"key":23,"text":24,"correct":14},"D","内部审核",{"key":26,"text":27,"correct":14},"E","考核评价","ADE","2020教材P348 \u002F 2019教材P350 （三）（1）项目部应对项目质量计划执行情况组织检查、内部审核和考核评价，验证实施效果。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]