[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149836":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149836,802,2,"多选题","以下说法（ ）是正确的。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","分包人的施工进度计划必须依据承包人的施工进度计划编制",true,{"key":16,"text":17,"correct":14},"B","承包人应将分包的施工进度计划纳入总进度计划的控制范畴，总,分包之间相互协调",{"key":19,"text":20,"correct":21},"C","分包人可以根据自行编制进度计划",false,{"key":23,"text":24,"correct":21},"D","承包人没有义务协助分包人解决进度控制中的相关问题",{"key":26,"text":27,"correct":14},"E","承包人应协助分包人解决项目进度控制中的相关问题","ABE","2020教材P339 \u002F 2019教材P340 （二）分包工程控制（1）分包单位的施工进度计划必须依据承包单位的施工进度计划编制。（2）承包单位应将分包的施工进度计划纳入总进度计划的控制范畴。（3）总、分包之间相互协调，处理好进度执行过程中的相关关系，承包单位应协助分包单位解决施工进度控制中的相关问题。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]