[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149834":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149834,802,2,"多选题","以下（ ）是编制施工进度计划的一部分根据。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","技术条件",true,{"key":16,"text":17,"correct":14},"B","资源情况",{"key":19,"text":20,"correct":21},"C","质量标准",false,{"key":23,"text":24,"correct":14},"D","定额材料",{"key":26,"text":27,"correct":14},"E","设计图纸","ABDE","2020教材P336 \u002F 2019教材P338 二、施工进度计划编制（一）编制依据（1）以合同工期为依据安排开、竣工时间；（2）设计图纸、定额材料等；（3）机具（械）设备和主要材料的供应及到货情况；（4）项目部可能投入的施工力量及资源情况；（5）工程项目所在地的水文、地质及其他方面自然情况；（6）工程项目所在地资源可利用情况；（7）影响施工的经济条件和技术条件；（8）工程项目的外部条件等。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]