[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149812":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149812,802,2,"多选题","按成本项目进行的成本分析有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工期成本分析",false,{"key":16,"text":17,"correct":14},"B","资金成本分析",{"key":19,"text":20,"correct":21},"C","间接成本分析",true,{"key":23,"text":24,"correct":14},"D","竣工成本分析",{"key":26,"text":27,"correct":21},"E","材料费分析","CE","2020教材P310 \u002F 2019教材P311 2.按成本项目进行的成本分析包括：人工费分析、材料费分析、机具使用分析、其他直接费分析、间接成本分析。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]