[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149781":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149781,802,2,"多选题","技术标书编制重点包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工方案",true,{"key":16,"text":17,"correct":14},"B","进度计划及措施",{"key":19,"text":20,"correct":21},"C","投标人资格",false,{"key":23,"text":24,"correct":21},"D","资金使用计划",{"key":26,"text":27,"correct":14},"E","施工现场总平面图","ABE","2020教材P284 \u002F 2019教材P285 技术部分：（1）主要施工方案2）进度计划及措施（3）质量保证体系及措施（4）安全管理体系及措施（5）消防、保卫、健康体系及措施（6）文明施工、环境保护体系及措施（7）风险管理体系及措施（8）机械设备配备及保障（9）劳动力、材料配置计划及保障（10）项目管理机构及保证体系（11）施工现场总平面图.",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]