[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149777":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149777,802,2,"多选题","计算报价时依据（ ）相关定额及计价方法进行。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","招标文件",true,{"key":16,"text":17,"correct":14},"B","市场价格",{"key":19,"text":20,"correct":14},"C","设计图纸",{"key":22,"text":23,"correct":24},"D","市场信息",false,{"key":26,"text":27,"correct":14},"E","施工组织设计","ABCE","2020教材P283 \u002F 2019教材P284 二（三）经济标书编制（1）依据招标文件、设计图纸、施工组织设计、市场价格、相关定额及计价方法进行仔细的计算和分析。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]