[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149769":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149769,802,2,"多选题","投标文件中经济部分包括()等内容。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","投标报价",true,{"key":16,"text":17,"correct":14},"B","已标价的工程量清单",{"key":19,"text":20,"correct":21},"C","成本管理措施",false,{"key":23,"text":24,"correct":21},"D","投标保证金",{"key":26,"text":27,"correct":14},"E","拟分包项目情况","ABE","2020教材P278 \u002F 2019教材P279 三（二）2经济部分：（1)投标报价；（2)已标价的工程量清单；（3)拟分包项目情况。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]