[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149751":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149751,802,2,"多选题","关于生活垃圾填埋场HDPE膜铺设的做法，错误的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","总体施工顺序一般为“先边坡，后场底”",false,{"key":16,"text":17,"correct":18},"B","冬期施工时应有防冻措施",true,{"key":20,"text":21,"correct":18},"C","铺设时应反复展开并拖动，以保证铺设平整",{"key":23,"text":24,"correct":18},"D","HDPE膜施工完成后应立即转入下一工序，以形成对HDPE膜的覆盖和保护",{"key":26,"text":27,"correct":14},"E","应及时收集整理施工记录表","BCD","2020教材P253 \u002F 2019教材P254 选项B，HDPE膜严禁冬期施工。选项C，铺设应一次展开到位，不宜展开后再拖动。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]