[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149727":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149727,802,2,"多选题","下面关于燃气管道吹扫，叙述中正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","管道及其附件组装完成并试压合格后，应进行通球扫线，并不少于两次",false,{"key":16,"text":17,"correct":14},"B","每次吹扫管道长度不宜超过1km，通球应按介质流动方向进行",{"key":19,"text":20,"correct":21},"C","扫线结果可用贴有纸或白漆的木靶板置于吹扫口检查",true,{"key":23,"text":24,"correct":14},"D","1min内没有铁锈脏物则认为合格",{"key":26,"text":27,"correct":21},"E","管道吹扫后将集存在阀室放散管内的脏物排出，清扫干净","CE","2020教材P240 \u002F 2019教材P241 本题考查的是管道吹扫。选项A应在试压之前进行吹扫；选项B每次吹扫管道长度不宜超过500m；选项D应为5min内没有铁锈脏物则认为合格。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]