[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149686":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149686,802,2,"多选题","关于补偿器的安装，以下说法正确的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","当方形补偿器垂直安装时，应在最高点安装排气装置，否则应在最低点安装疏水装置",false,{"key":16,"text":17,"correct":18},"B","L形补偿器一般在施工现场制作",true,{"key":20,"text":21,"correct":18},"C","采用直埋补偿器时，其固定段应可靠锚固，活动端应能自由变形",{"key":23,"text":24,"correct":18},"D","补偿器的临时固定装置在管道安装、试压、保温完毕后，应将紧固件松开，保证在使用中可以自由伸缩",{"key":26,"text":27,"correct":18},"E","填料式补偿器芯管的外露长度应大于设计规定的变形量","BCDE","2020\u002F2019教材P225 3.补偿器安装要点： （1）补偿器的临时固定装置在管道安装、试压、保温完毕后，应将紧固件松开，保证在使用中可自由伸缩。D正确（2）L形、Z形、方形补偿器一般在施工现场制作。B正确 （3）方形补偿器垂直安装时，不得在弯管上开孔安装放风管和排水管。A错误 （4）填料式补偿器芯管的外露长度应大于设计规定的变形量。E正确 （5）采用直埋补偿器时，在回填后其固定端应可靠锚固，活动端应能自由变形。C正确",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]