[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149658":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149658,802,2,"多选题","水池施工中的抗浮措施有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","选择可靠的降低地下水位方法，严格进行排降水工程施工，对排降水所用机具随时做好保养维护，并有备用机具",true,{"key":16,"text":17,"correct":14},"B","完善雨期施工防汛",{"key":19,"text":20,"correct":14},"C","可能时，允许地下水和外来水进入构筑物，使构筑物内外无水位差，以减少浮力值",{"key":22,"text":23,"correct":24},"D","增加池体钢筋所占比例",false,{"key":26,"text":27,"correct":24},"E","对池体下部进行换土","ABC","2020教材P198 \u002F 2019教材P199 1K414025水池施工中的抗浮措施。 （1）选择可靠的降低地下水位方法，严格进行降水施工，对降水所用机具随时做好保养维护，并有备用机具。所以A正确； 1）基坑四周设防汛墙，防止外来水进入基坑;建立防汛组织，强化防汛工作;所以B正确。 （2）当构筑物的自重小于其承受的浮力时，会导致构筑物浮起;应考虑因地制宜措施:引人地下水和地表水等外来水进入构筑物，使构筑物内、外无水位差，以减小其浮力，使构筑物结构免于破坏。所以C正确.",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]