[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149599":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149599,802,2,"多选题","采用环形开挖留核心土法施工时，可能使围岩变形增大的因素是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","围岩要经多次扰动",true,{"key":16,"text":17,"correct":18},"B","在第四纪地层，一般不设或少设锚杆",false,{"key":20,"text":21,"correct":18},"C","台阶长度较长",{"key":23,"text":24,"correct":14},"D","形成全断面封闭的时间长",{"key":26,"text":27,"correct":18},"E","环形开挖进尺较短","AD","2020教材P164 \u002F 2019教材P165 （5）注意事项：1）虽然核心土增强了开挖面的稳定，但开挖中围岩要经受多次扰动，而且断面分块多，支护结构形成全断面封闭的时间长，这些都有可能使围岩变形增大。因此，常要结合辅助施工措施对开挖工作面及其前方岩体进行预支护或预加固。2）由于拱形开挖高度较小，或地层松软锚杆不易成型，所以对城市第四纪地层，施工中一般不设或少设锚杆",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]