[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149524":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149524,802,2,"多选题","拱桥施工中，拱圈主梁的施工方法应根据()等内容，最终确定合理的施工方法。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","拱桥的跨度",true,{"key":16,"text":17,"correct":14},"B","结构形式",{"key":19,"text":20,"correct":14},"C","现场施工条件",{"key":22,"text":23,"correct":24},"D","桥梁断面大小",false,{"key":26,"text":27,"correct":14},"E","施工水平","ABCE","2020教材P86 \u002F 2019教材P87 二）（2）选用施工方法应根据拱桥的跨度、结构形式、现场施工条件、施工水平等因素，并经方案的技术经济比较确定合理的施工方法。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]