[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149519":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149519,802,2,"多选题","以下关于钢梁安装质量验收主控项目正确的有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","焊缝探伤检验符合设计要求",true,{"key":16,"text":17,"correct":14},"B","涂装检验符合《城市桥梁工程施工与质量验收规范》CJJ2-2008有关规定",{"key":19,"text":20,"correct":14},"C","高强螺栓的栓接板面（摩擦面）除锈后的抗滑移系数符合设计要求",{"key":22,"text":23,"correct":14},"D","高强度螺栓连接副等紧固件及其连接符合设计要求",{"key":25,"text":26,"correct":27},"E","预拱度符合设计要求",false,"ABCD","2020教材P83 \u002F 2019教材P84 三、钢梁制作安装质量验收主控项目(1)钢材、焊接材料、涂装材料应符合国家现行标准规定和设计要求。(2)高强度螺栓连接副等紧固件及其连接应符合国家现行标准规定和设计要求。(3)高强螺栓的栓接板面（摩擦面）除锈处理后的抗滑移系数应符合设计要求。(4)焊缝探伤检验应符合设计要求和《城市桥梁工程施工与质量验收规范》CJJ 2—2008的有关规定。(5)涂装检验应符合《城市桥梁工程施工与质量验收规范》CJJ 2-2008第14.3.1条规定。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]