[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149479":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149479,802,2,"多选题","浇筑混凝土前，应检查模板、支架的()，检查钢筋及预埋件的位置，规格，并做好记录。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","承载力",true,{"key":16,"text":17,"correct":18},"B","数量",false,{"key":20,"text":21,"correct":14},"C","刚度",{"key":23,"text":24,"correct":18},"D","材质",{"key":26,"text":27,"correct":14},"E","稳定性","ACE","2020\u002F2019教材P51 浇筑混凝土前，应检查模板、支架的承载力、刚度、稳定性，检査钢筋及预埋件的位置、规格，并做好记录，符合设计要求后方可浇筑。在原混凝土面上浇筑新混凝土时，相接面应凿毛，并清洗干净，表面湿润但不得有积水。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]