[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149472":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149472,802,2,"多选题","混凝土配合比的设计步骤包括()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","初步配合比设计阶段",true,{"key":16,"text":17,"correct":14},"B","试验室配合比设计阶段",{"key":19,"text":20,"correct":14},"C","基准配合比设计阶段",{"key":22,"text":23,"correct":14},"D","施工配合比设计阶段",{"key":25,"text":26,"correct":27},"E","配合比实施使用阶段",false,"ABCD","2020\u002F2019教材P49 (1)初步配合比设计阶段，根据配制强度和设计强度相互间关系，用水灰比计算方法，水量、砂率査表方法以及砂石材料计算方法等确定计算初步配合比。(2)实验室配合比设计阶段，根据施工条件的差异和变化、材料质量的可能波动调整配合比。(3)基准配合比设计阶段，根据强度验证原理和密度修正方法，确定每立方米混凝土的材料用量。(4)施工配合比设计阶段，根据实测砂石含水率进行配合比调整，提出施工配合比。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]