[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149451":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149451,802,2,"多选题","热拌沥青混合料路面压实成型与接缝，说法正确的有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","沥青路面施工应配备足够数量、状态完好的压路机",true,{"key":16,"text":17,"correct":14},"B","碾压速度做到慢而均匀",{"key":19,"text":20,"correct":21},"C","在超高路段和坡道上则由高处向低处碾压",false,{"key":23,"text":24,"correct":14},"D","复压应紧跟在初压后开始，不得随意停顿",{"key":26,"text":27,"correct":21},"E","沥青混合料路面接缝必须紧密、平顺，错缝不得用直尺检查","ABD","2020\u002F2019教材P31 （1）压实施工应配备足够数量、状态完好的压路机.（2）压路机应以慢而均匀的速度碾压.（4）在超高路段和坡道上则由低处向高处碾压。复压应紧跟在初压后开始。P32（1）路面接缝必须紧密、平顺。相邻两幅及上、下层的横向接缝均应错位l m以上。应采用3 m直尺检查，确保平整度达到要求。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]