[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149354":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149354,802,2,"多选题","模板支架、脚手架拆除施工时，施工现场应采取（ ）等措施。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","拆除现场应设作业区，边界设警示标志，由专人值守",true,{"key":16,"text":17,"correct":14},"B","拆除施工机械作业时由专人指挥",{"key":19,"text":20,"correct":14},"C","拆除顺序按要求由上而下逐层进行",{"key":22,"text":23,"correct":24},"D","拆除顺序按要求上下同时作业",false,{"key":26,"text":27,"correct":14},"E","拆除的模板、杆件、配件轻拿轻放、分类码放","ABCE","本题考查的是模板、支架和拱架施工安全措施。选项D错误，严禁上下同时作业。教材P433～434。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]