[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149310":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149310,802,2,"多选题","地下燃气管道穿过（ ）时，应将燃气管道敷设在套管内。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","排水管",true,{"key":16,"text":17,"correct":14},"B","热力管沟",{"key":19,"text":20,"correct":14},"C","隧道",{"key":22,"text":23,"correct":24},"D","建筑物",false,{"key":26,"text":27,"correct":14},"E","沟槽","ABCE","本题考查的是燃气管道穿越构建筑物。地下燃气管道穿过排水管、热力管沟、联合地沟、隧道及其他各种用途沟槽时应将燃气管道敷设在套管内。教材P234。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]