[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149309":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149309,802,2,"多选题","下面关于燃气管道吹扫的叙述中正确的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","管道及其附件组装完成并试压合格后，应进行气体吹扫或清管球清扫",false,{"key":16,"text":17,"correct":14},"B","每次吹扫管道长度不宜超过1km，吹扫球应按介质流动方向进行",{"key":19,"text":20,"correct":21},"C","吹扫结果可用贴有纸或白布的板置于吹扫口检查",true,{"key":23,"text":24,"correct":21},"D","5min内靶上无铁锈脏物则认为合格",{"key":26,"text":27,"correct":21},"E","吹扫后，将集存在阀室放散管内的脏物排出，清扫干净","CDE","本题考查的是燃气管道吹扫及强度试验。选项A，在试压前进行气体吹扫；选项B，吹扫管道长度不宜超过500m。教材P241。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]