[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149230":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1149230,802,2,"多选题","（2013 年真题）土木合成材料膨润土垫（GCL）施工流程主要包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","土工膜铺设",false,{"key":16,"text":17,"correct":18},"B","GCL 垫的铺设",true,{"key":20,"text":21,"correct":18},"C","搭接宽度调整与控制",{"key":23,"text":24,"correct":14},"D","GCL 垫熔接",{"key":26,"text":27,"correct":18},"E","搭接处层间撒膨润土","BCE","GCK 垫施工流程主要包括GCL 垫的摊铺、搭接宽度控制、搭接处两层GCL 垫间撒膨润土。",{"id":6,"name":31,"category":32,"favorite":33},"一建市政公用工程实务","建筑工程",0]