[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149132":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1149132,802,1,"单选题","给水排水压力管道做水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于( )；水压试验合格后，应及时回填其余部分。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0.5m",true,{"key":16,"text":17,"correct":18},"B","2m",false,{"key":20,"text":21,"correct":18},"C","1.0m",{"key":23,"text":24,"correct":18},"D","1.5m","2020教材P468 \u002F 2019教材P469 （1）压力管道水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于0.5m;水压试验合格后，应及时回填沟槽的其余部分。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]