[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149123":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1149123,802,1,"单选题","有关桥梁分项工程质量控制说法错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","应按《城市桥梁工程施工与质量验收规范》GJJ2-2008进行质量控制",false,{"key":16,"text":17,"correct":18},"B","分项工程完成后应进行自检、交接检验合格后，即可进行下一个分项工程施工",true,{"key":20,"text":21,"correct":14},"C","应形成齐全完整的质量检查文件",{"key":23,"text":24,"correct":14},"D","检验文件经监理工程师检查签认后，方可进行下一个分项工程施工","2020教材P465 \u002F 2019教材P466 （2）各分项工程应按《城市桥梁施工质量验收规范》CJJ 2—2008进行质量控制，各分项工程完成后应进行自检、交接检验，并形成文件，经监理工程师检查签认后，方可进行下一个分项工程施工。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]