[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1149050":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1149050,802,1,"单选题","拆除工程开工前，应根据工程特点、构造情况、工程量等编制施工组织设计或安全专项施工方案，爆破拆除和被拆除桥梁面积大于1000㎡的拆除工程，应编制（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全施工组织设计",true,{"key":16,"text":17,"correct":18},"B","安全施工方案",false,{"key":20,"text":21,"correct":18},"C","安全专项施工方案",{"key":23,"text":24,"correct":18},"D","安全专项施工技术措施","2020教材P439 \u002F 2019教材P440 （四）（1）拆除工程开工前，应根据工程特点、构造情况、工程量等编制施工组织设计或安全专项施工方案，爆破拆除和被拆除桥梁面积大于1000m2的拆除工程，应编制安全施工组织设计。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]