[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148974":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1148974,802,1,"单选题","张拉控制应力达到（ ）后方可锚固，锚固后预应力筋的外露长度不宜小于30mm。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","监理要求",false,{"key":16,"text":17,"correct":18},"B","稳定",true,{"key":20,"text":21,"correct":14},"C","设计要求",{"key":23,"text":24,"correct":14},"D","规定","2020教材P364 \u002F 2019教材P366 （二）张拉和锚固（5）张拉控制应力达到稳定后方可锚固，锚固后预应力筋的外露长度不宜小于30mm，对锚具应采用封端混凝土保护，当需较长时间外露时，应采取防锈蚀措施。锚固完毕经检验合格后，方可切割端头多余的预应力筋，严禁使用电弧焊切割。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]