[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148872":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1148872,802,1,"单选题","非承包人原因引起的工程量增减，该项工程量变化在合同约定幅度以内的，应（ ）单价。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","相应调整",false,{"key":16,"text":17,"correct":18},"B","执行合同",true,{"key":20,"text":21,"correct":14},"C","重新核对",{"key":23,"text":24,"correct":14},"D","双方协商","2020教材P291 \u002F 2019教材P292 （6）非承包人原因引起的工程量增减，该项工程量变化在合同约定幅度以内的，应执行原有的综合单价。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]