[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148866":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148866,802,1,"单选题","采用综合单价法编制施工图预算是以（ ）为计算单元。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设工程",false,{"key":16,"text":17,"correct":14},"B","单项工程",{"key":19,"text":20,"correct":21},"C","分项工程",true,{"key":23,"text":24,"correct":14},"D","单位工程","2020教材P289 \u002F 2019教材P290 一、（5）建设工程发承包及实施阶段的工程造价应有分部分项工程费、措施项目费、其他项目费、规费和税金组成。 （3）分部分项工程费应按招标文件中分部分项工程量清单项目的特征描述确定综合单价计算。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]