[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148862":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1148862,802,1,"单选题","当建设项目有多个单项工程时，应采用（ ）预算编制形式。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","一级",false,{"key":16,"text":17,"correct":18},"B","三级",true,{"key":20,"text":21,"correct":14},"C","二级",{"key":23,"text":24,"correct":14},"D","四级","2020教材P288 \u002F 2019教材P289 （2）当建设项目有多个单项工程时，应采用三级预算编制形式。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]