[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148854":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1148854,802,1,"单选题","综合单价是按招标文件中分部分项（ ）项目的特征描述确定的。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","概算",false,{"key":16,"text":17,"correct":14},"B","估算",{"key":19,"text":20,"correct":14},"C","预算",{"key":22,"text":23,"correct":24},"D","工程量清单",true,"2020教材P284 \u002F 2019教材P285 （三）（3）分部分项工程费应按招标文件中分部分项工程量清单项目的特征描述确定综合单价计算。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]