[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148849":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148849,802,1,"单选题","计算投标报价前应根据招标文件中的相关说明和施工图，（ ）工程量。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","计算",false,{"key":16,"text":17,"correct":14},"B","确认",{"key":19,"text":20,"correct":21},"C","核对",true,{"key":23,"text":24,"correct":14},"D","质疑","2020教材P283 \u002F 2019教材P284 （三）（2）应根据招标文件中提供的相关说明和施工图，重新校对工程数量，并根据核对的工程数量确定报价。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]