[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148838":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148838,802,1,"单选题","招标文件评审评分标准中关于风险管理体系及措施的评分属于（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","履约能力",false,{"key":16,"text":17,"correct":14},"B","商务标",{"key":19,"text":20,"correct":21},"C","技术标",true,{"key":23,"text":24,"correct":14},"D","经济标","2020教材P278 \u002F 2019教材P279 （二）3技术部分（主要内容）：（1）主要施工方案；（2）进度计划及措施；（3）质量保证体系及措施；（4）安全管理体系及措施；（5）消防、保卫、健康体系及措施；（6）文明施工、环境保护体系及措施；（7）风险管理体系及措施；（8）机械设备配备及保障;（9）劳动力、材料配置计划及保障；（1 0）项目管理机构及保证体系；（1 1）施工现场总平面图。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]