[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148825":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148825,802,1,"单选题","中桩、中心桩等控制桩的恢复与校测应按施工需要及时进行，发现桩位偏移或丢失应及时()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","纠正、纠偏",false,{"key":16,"text":17,"correct":14},"B","纠错、补测",{"key":19,"text":20,"correct":21},"C","补测、钉桩",true,{"key":23,"text":24,"correct":14},"D","定位、钉桩","2020教材P261 \u002F 2019教材P262 （3）施工过程应根据分部（项）工程要求布设测桩，中桩、中心桩等控制桩的恢复与校测应按施工需要及时进行，发现桩位偏移或丢失应及时补测、钉桩。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]