[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148717":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1148717,802,1,"单选题","管道做功能性试验，下列说法错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","水压试验包括预实验和主试验阶段",false,{"key":16,"text":17,"correct":14},"B","管道严密性试验，宜按设计要求确定选择闭水试验或闭气试验",{"key":19,"text":20,"correct":14},"C","向管道注水应从下游缓慢注入",{"key":22,"text":23,"correct":24},"D","给水管道水压试验合格后，即可通水投产",true,"2020教材P205 \u002F 2019教材P206 （一）（1）压力管道的水压试验分为预实验和主试验阶段；A项正确水压试验合格的管道方可通水投入运行。D项错误，因为试验合格后要冲洗消毒才能用。D说的是投产，而教材说的是投入运行。而且要投产必须要消毒才行的，所以D错误。3.管道内注水与浸泡（1）应从下游缓慢注入，注入时在试验管段上游的管顶及管段中的高点应设置排气阀，将管道内的气体排除。C项正确（二）无压管道的严密性试验分为闭水试验和闭气试验，应按设计要求确定；设计无要求时，应根据实际情况选择闭水试验或闭气试验。B项正确",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]