[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148705":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1148705,802,1,"单选题","沉井下沉施工终沉时，每小时测一次，严格控制超沉，沉井封底前自沉速率应小于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","10mm\u002F8h",true,{"key":16,"text":17,"correct":18},"B","20mm\u002F8h",false,{"key":20,"text":21,"correct":18},"C","15mm\u002F8h",{"key":23,"text":24,"correct":18},"D","25mm\u002F8h","2020教材P196 \u002F 2019教材P198 2）终沉时，每小时测一次，严格控制超沉，沉井封底前自沉速率应小于10mm\u002F8h。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]